Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Florida: Polk. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUFL2009-121 | BRICKLAYER | $20.00 | $0.00 |
| SUFL2009-121 | CARPENTER, INCLUDES CABINET INSTALLATION | $11.37 | $0.00 |
| SUFL2009-121 | CEMENT MASON/CONCRETE FINISHER | $15.14 | $0.00 |
| SUFL2009-121 | ELECTRICIAN | $12.66 | $0.00 |
| IRON0397-003 | IRONWORKERREINFORCING AND STRUCTURAL | $35.25 | $17.32 |
| SUFL2009-121 | IRONWORKER, ORNAMENTAL | $12.60 | $0.00 |
| SUFL2009-121 | LABORERMASON TENDER - BRICK |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $11.51 |
| $0.00 |
| SUFL2009-121 | LABORERPIPELAYER | $11.79 | $0.00 |
| SUFL2009-121 | LABORERROOF TEAROFF | $9.00 | $0.00 |
| SUFL2009-121 | LABORERCOMMON OR GENERAL | $9.85 | $0.00 |
| SUFL2009-121 | LABORERLANDSCAPE AND IRRIGATION | $8.26 | $0.00 |
| SUFL2009-121 | LABORERMASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 |
| SUFL2009-121 | OPERATORSCREED | $11.08 | $0.00 |
| SUFL2009-121 | OPERATORTRACTOR | $10.20 | $0.00 |
| SUFL2009-121 | OPERATORTRACKHOE | $15.68 | $0.00 |
| SUFL2009-121 | OPERATORASPHALT PAVER | $12.07 | $0.00 |
| SUFL2009-121 | OPERATORBACKHOE/EXCAVATOR | $12.56 | $0.00 |
| SUFL2009-121 | OPERATORBACKHOE LOADER COMBO | $17.04 | $0.00 |
| SUFL2009-121 | OPERATORBULLDOZER | $12.14 | $0.00 |
| SUFL2009-121 | OPERATORDISTRIBUTOR | $11.57 | $0.00 |
| SUFL2009-121 | OPERATORFORKLIFT | $17.38 | $0.00 |
| SUFL2009-121 | OPERATORGRADER/BLADE | $15.50 | $0.00 |
| SUFL2009-121 | OPERATORLOADER | $11.59 | $0.00 |
| SUFL2009-121 | OPERATORROLLER | $11.02 | $0.00 |
| SUFL2009-121 | PLUMBER | $13.22 | $0.00 |
| ENGI0487-032 | POWER EQUIPMENT OPERATORGROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 |
| ENGI0487-032 | POWER EQUIPMENT OPERATORGROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES. | $38.01 | $16.85 |
| ENGI0487-032 | POWER EQUIPMENT OPERATORGROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 |
| SUFL2009-121 | ROOFERMETAL ROOF | $16.99 | $0.00 |
| SUFL2009-121 | ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS(EXCLUDES METAL ROOFS) | $13.33 | $0.00 |
| SUFL2009-121 | SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION | $9.50 | $0.00 |
| SUFL2009-121 | TRUCK DRIVERLOWBOY TRUCK | $12.10 | $0.00 |
| SUFL2009-121 | TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 | $0.00 |