Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Florida: Marion. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUFL2009-111 | BRICKLAYER | $20.00 | $0.00 |
| SUFL2009-111 | CARPENTER, INCLUDES BATT INSULATION | $12.86 | $0.00 |
| SUFL2009-111 | CEMENT MASON/CONCRETE FINISHER | $10.11 | $0.00 |
| SUFL2009-111 | ELECTRICIAN | $11.47 | $0.00 |
| SUFL2009-111 | INSULATOR - BLOWN | $15.61 | $0.00 |
| SUFL2009-111 | IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $9.00 | $0.00 |
| SUFL2009-111 | LABORERCOMMON OR GENERAL |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $8.65 |
| $0.00 |
| SUFL2009-111 | LABORERMASON TENDER - BRICK | $11.51 | $0.00 |
| SUFL2009-111 | LABORERMASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 |
| SUFL2009-111 | LABORERROOF TEAROFF | $9.00 | $0.00 |
| SUFL2009-111 | LABORERPIPELAYER | $10.08 | $0.00 |
| SUFL2009-111 | LABORERLANDSCAPE AND IRRIGATION | $8.06 | $0.00 |
| SUFL2009-111 | OPERATORROLLER | $10.59 | $0.00 |
| SUFL2009-111 | OPERATORTRACKHOE | $15.68 | $0.00 |
| SUFL2009-111 | OPERATORTRACTOR | $10.20 | $0.00 |
| SUFL2009-111 | OPERATORLOADER | $12.28 | $0.00 |
| SUFL2009-111 | OPERATORSCREED | $10.93 | $0.00 |
| SUFL2009-111 | OPERATORASPHALT PAVER | $11.63 | $0.00 |
| SUFL2009-111 | OPERATORBACKHOE/EXCAVATOR | $12.72 | $0.00 |
| SUFL2009-111 | OPERATORBACKHOE LOADER COMBO | $17.04 | $0.00 |
| SUFL2009-111 | OPERATORBULLDOZER | $12.40 | $0.00 |
| SUFL2009-111 | OPERATORDISTRIBUTOR | $11.41 | $0.00 |
| SUFL2009-111 | OPERATORFORKLIFT | $17.50 | $0.00 |
| SUFL2009-111 | OPERATORGRADER/BLADE | $15.50 | $0.00 |
| SUFL2009-111 | PAINTERBRUSH, ROLLER AND SPRAY | $10.00 | $0.00 |
| PLUM0234-007 | PLUMBER | $37.50 | $17.59 |
| ENGI0487-032 | POWER EQUIPMENT OPERATORGROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 |
| ENGI0487-032 | POWER EQUIPMENT OPERATORGROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES. | $38.01 | $16.85 |
| ENGI0487-032 | POWER EQUIPMENT OPERATORGROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 |
| SUFL2009-111 | ROOFERMETAL ROOF | $16.99 | $0.00 |
| SUFL2009-111 | ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS(EXCLUDES METAL ROOFS) | $11.07 | $0.00 |
| SHEE0015-003 | SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION | $25.75 | $16.92 |
| SUFL2009-111 | TRUCK DRIVERLOWBOY TRUCK | $12.14 | $0.00 |
| SUFL2009-111 | TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.62 | $0.00 |