Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Florida: Clay. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUFL2009-097 | BRICKLAYER | $20.00 | $0.00 |
| SUFL2009-097 | CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $14.14 | $0.00 |
| SUFL2009-097 | CEMENT MASON/CONCRETE FINISHER | $12.97 | $0.00 |
| SUFL2009-097 | DRYWALL FINISHER/TAPER | $16.13 | $0.00 |
| SUFL2009-097 | DRYWALL HANGER | $12.35 | $0.00 |
| SUFL2009-097 | ELECTRICIAN | $11.79 | $0.00 |
| SUFL2009-097 | FLOOR LAYERCARPET | $10.00 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $0.00 |
| SUFL2009-097 | FORM WORKER | $12.00 | $0.46 |
| SUFL2009-097 | HVAC MECHANIC(INSTALLATION OF HVAC DUCT) | $13.99 | $0.00 |
| SUFL2009-097 | IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $9.00 | $0.00 |
| SUFL2009-097 | LABORERCOMMON OR GENERAL | $9.00 | $0.00 |
| SUFL2009-097 | LABORERASPHALT RAKER | $10.12 | $0.00 |
| SUFL2009-097 | LABORERLANDSCAPE AND IRRIGATION | $8.05 | $0.00 |
| SUFL2009-097 | LABORERMASON TENDER - BRICK | $11.51 | $0.00 |
| SUFL2009-097 | LABORERMASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 |
| SUFL2009-097 | LABORERPIPELAYER | $11.93 | $0.00 |
| SUFL2009-097 | LABORERROOF TEAROFF | $9.00 | $0.00 |
| SUFL2009-097 | LATHER | $14.20 | $0.00 |
| SUFL2009-097 | OPERATORSCREED | $10.93 | $0.00 |
| SUFL2009-097 | OPERATORLOADER | $12.75 | $0.00 |
| SUFL2009-097 | OPERATORROLLER | $10.59 | $0.00 |
| SUFL2009-097 | OPERATORTRACKHOE | $15.68 | $0.00 |
| SUFL2009-097 | OPERATORTRACTOR | $10.20 | $0.00 |
| SUFL2009-097 | OPERATORASPHALT PAVER | $11.63 | $0.00 |
| SUFL2009-097 | OPERATORBACKHOE/EXCAVATOR | $12.72 | $0.00 |
| SUFL2009-097 | OPERATORBACKHOE LOADER COMBO | $17.04 | $0.00 |
| SUFL2009-097 | OPERATORBULLDOZER | $12.40 | $0.00 |
| SUFL2009-097 | OPERATORDISTRIBUTOR | $11.41 | $0.00 |
| SUFL2009-097 | OPERATORFORKLIFT | $17.50 | $0.00 |
| SUFL2009-097 | OPERATORGRADER/BLADE | $15.50 | $0.00 |
| SUFL2009-097 | PAINTERINCLUDES BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $10.68 | $0.00 |
| SUFL2009-097 | PLASTERER | $15.10 | $0.00 |
| PLUM0234-003 | PLUMBER, INCLUDING HVAC PIPE INSTALLATION | $37.50 | $17.59 |
| ENGI0673-009 | POWER EQUIPMENT OPERATOR(CRAWLER CRANE, HYDRO CRANE, LOCOMOTIVE CRANE, TOWER CRANE, TRUCK CRANE) | $35.41 | $13.60 |
| ENGI0673-009 | POWER EQUIPMENT OPERATOROILER | $23.05 | $13.60 |
| ENGI0673-009 | POWER EQUIPMENT OPERATOR(GANTRY CRANE, BRIDGE CRANE) | $35.41 | $13.60 |
| SUFL2009-097 | ROOFERMETAL ROOF | $16.99 | $0.00 |
| SUFL2009-097 | ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS(EXCLUDES METAL ROOFS) | $9.68 | $0.00 |
| SHEE0435-001 | SHEET METAL WORKER(EXCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | $31.64 | $15.98 |
| SUFL2009-097 | TILE SETTER | $12.46 | $0.00 |
| SUFL2009-097 | TRUCK DRIVERLOWBOY TRUCK | $12.14 | $0.00 |
| SUFL2009-097 | TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.62 | $0.00 |