Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Florida: Columbia. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUFL2009-042 | CARPENTER, INCLUDES FORM WORK | $15.00 | $0.36 |
| SUFL2009-042 | CEMENT MASON/CONCRETE FINISHER | $15.00 | $0.00 |
| ELEC1205-004 | ELECTRICIAN | $33.50 | $13.85 |
| IRON0597-004 | IRONWORKERSTRUCTURAL AND REINFORCING | $29.50 | $12.98 |
| SUFL2009-042 | LABORERCOMMON OR GENERAL | $10.81 | $0.00 |
| SUFL2009-042 | LABORERPIPELAYER | $11.42 | $1.95 |
| ENGI0673-007 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| OPERATORCRANE (TOWER CRANE; LOCOMOTIVE CRANE; CRAWLER CRANE; TRUCK CRANE; & HYDRO CRANE) |
| $35.41 |
| $13.60 |
| ENGI0673-007 | OPERATORCRANE (GANTRY CRANE & BRIDGE CRANE) | $35.41 | $13.60 |
| SUFL2009-042 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $9.58 | $0.00 |
| SUFL2009-042 | OPERATORBACKHOE/EXCAVATOR | $13.19 | $0.00 |
| SUFL2009-042 | PAINTERBRUSH, ROLLER AND SPRAY | $10.42 | $0.00 |
| SUFL2009-042 | PLUMBER | $12.27 | $3.33 |
| SUFL2009-042 | ROOFERBUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY | $12.00 | $0.00 |
| SHEE0435-005 | SHEET METAL WORKERINCLUDES HVAC DUCT INSTALLATION A: HOLIDAY PAY: NEW YEAR'S DAY, MEMORIAL DAY, JULY FOURTH, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY | $31.64 | $15.98 |
| SUFL2009-042 | TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY | $8.00 | $0.15 |