Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Delaware: Sussex. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUDE2022-003 | CARPENTER | $39.67 | $5.08 |
| SUDE2022-003 | CEMENT MASON/CONCRETE FINISHER | $30.41 | $3.28 |
| SUDE2022-003 | ELECTRICIAN | $65.86 | $0.00 |
| SUDE2022-003 | FORM WORKER | $38.65 | $5.45 |
| SUDE2022-003 | IRONWORKER, REINFORCING | $49.64 | $0.00 |
| LABO0199-001 | LABORER(ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR) | $31.15 | $16.50 |
| SUDE2022-003 | LABORERMASON TENDER - CEMENT/CONCRETE |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $43.30 |
| $2.06 |
| SUDE2022-003 | LABORERCOMMON OR GENERAL | $34.94 | $5.91 |
| SUDE2022-003 | OPERATORBULLDOZER | $35.18 | $14.27 |
| SUDE2022-003 | OPERATORMECHANIC | $28.11 | $11.18 |
| SUDE2022-003 | OPERATORMILLING MACHINE | $34.01 | $12.25 |
| SUDE2022-003 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $35.07 | $17.17 |
| SUDE2022-003 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $30.52 | $13.47 |
| SUDE2022-003 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $34.34 | $14.93 |
| SUDE2022-003 | OPERATORLOADER | $38.36 | $4.31 |
| ENGI0542-006 | POWER EQUIPMENT OPERATORCRANE | $45.81 | $31.38 |
| ENGI0542-006 | POWER EQUIPMENT OPERATORDRILL | $43.76 | $30.77 |
| ENGI0542-006 | POWER EQUIPMENT OPERATORPOUNDER | $43.76 | $30.77 |
| ENGI0542-006 | POWER EQUIPMENT OPERATORROLLER | $43.40 | $30.66 |
| SUDE2022-003 | TRAFFIC CONTROLFLAGGER | $40.33 | $0.00 |
| SUDE2022-003 | TRUCK DRIVERDUMP TRUCK | $28.07 | $7.38 |