Pulling the wage determination…
Revision 3 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in District of Columbia: Washington, D.C.. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 3). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0024-008 | ASBESTOS WORKERHAZARDOUS MATERIAL HANDLER INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $24.46 | $10.19 |
| ASBE0024-007 | ASBESTOS WORKER/HEAT & FROST INSULATOR(INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 |
| BRDC0001-002 | BRICKLAYER | $38.80 | $15.17 |
| CARP0197-011 | CARPENTERINCLUDES DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYING-CARPET |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $34.41 |
| $14.33 |
| PLAS0891-006 | CEMENT MASON/CONCRETE FINISHER | $30.50 | $14.23 |
| ELEC0026-017 | ELECTRICAL INSTALLER(SOUND & COMMUNICATION SYSTEMS) SCOPE OF WORK: INCLUDES LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, VSAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). WORK EXCLUDED: THE INSTALLATI | $34.16 | $13.54 |
| ELEC0026-016 | ELECTRICIANINCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $59.50 | $23.06 |
| ELEV0010-001 | ELEVATOR MECHANIC A. PAID HOLIDAYSNEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATIONS: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $57.16 | $38.44 |
| ASBE0024-014 | FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUNDPENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDER TO PREVENT THE PASAGE OF FIRE, SMOKE OF OTHER GASES. THE APPLICATION INCLUDES ALL COMPONENTS INVOLVED IN CREATING THE RATED BARRIER AT PERIMETER SLAB EDGES AND EXTERIOR CAVITIES, THE HEAD OF GYPSUM BOARD OR CONCRETE WALLS, JOINTS BETWEEN RATED WALL OR FLOOR COMPONENTS, SEALING OF PENETRATING ITEMS AND BLANK OPENINGS. A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERA | $30.21 | $10.43 |
| PAIN0051-014 | GLAZIER(GLAZING CONTRACTS OVER $2 MILLION) | $36.65 | $14.46 |
| PAIN0051-014 | GLAZIERGLAZING CONTRACTS $2 MILLION AND UNDER | $32.41 | $14.46 |
| IRON0005-005 | IRONWORKERSTRUCTURAL AND ORNAMENTAL | $37.86 | $25.86 |
| IRON0005-012 | IRONWORKER, REINFORCING | $31.88 | $23.78 |
| LABO0011-009 | LABORERSKILLED | $30.47 | $8.70 |
| SUDC2009-003 | LABORERMASON TENDER - CEMENT/CONCRETE | $15.40 | $2.85 |
| SUDC2009-003 | LABORERMASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT | $11.67 | $0.00 |
| SUDC2009-003 | LABORERCOMMON OR GENERAL | $13.04 | $2.80 |
| MARB0002-004 | MARBLE/STONE MASON INCLUDING POINTING, CAULKING AND CLEANING OF ALL TYPES OFMASONRY, BRICK, STONE AND CEMENT EXCEPT POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT (RESTORATION WORK) | $45.65 | $21.21 |
| CARP0219-001 | MILLWRIGHT | $39.50 | $17.32 |
| PAIN0051-015 | PAINTERBRUSH, ROLLER, SPRAY AND DRYWALL FINISHER | $29.16 | $11.86 |
| CARP0474-006 | PILEDRIVERMAN | $36.60 | $14.47 |
| PLUM0602-008 | PIPEFITTERINCLUDES HVAC PIPE INSTALLATION A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY | $55.00 | $24.46 |
| PLAS0891-005 | PLASTERER(INCLUDING FIREPROOFING) | $32.86 | $10.46 |
| PLUM0005-010 | PLUMBER A. PAID HOLIDAYSLABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY AND THE FOURTH OF JULY | $53.30 | $23.71 |
| SUDC2009-003 | POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES(RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT | $18.88 | $0.00 |
| ROOF0030-016 | ROOFER | $36.26 | $14.91 |
| SHEE0100-015 | SHEET METAL WORKERINCLUDING HVAC DUCT INSTALLATION A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $53.42 | $23.20 |
| SFDC0669-002 | SPRINKLER FITTER(FIRE SPRINKLERS) | $45.22 | $27.69 |
| MARB0003-007 | TERRAZZO FINISHER | $28.85 | $12.55 |
| MARB0003-006 | TERRAZZO WORKER/SETTER | $34.34 | $14.20 |
| MARB0003-009 | TILE FINISHER | $28.85 | $12.55 |
| MARB0003-008 | TILE SETTER | $34.34 | $14.20 |