Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Connecticut: Middlesex. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRCT0001-001 | BRICKLAYER | $45.56 | $36.94 |
| BRCT0001-002 | BRICK POINTER/CAULKER/CLEANER | $45.56 | $36.94 |
| CARP0326-027 | CARPENTER(SCAFFOLD BUILDER) | $42.03 | $29.19 |
| CARP0326-034 | CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 |
| BRCT0001-005 | CEMENT MASON/CONCRETE FINISHER | $45.56 | $36.94 |
| PAIN0011-023 | DRYWALL FINISHER/TAPER | $40.32 | $26.75 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC0035-014 |
| ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING) |
| $48.25 |
| $36.67 |
| ELEV0091-002 | ELEVATOR MECHANIC FOOTNOTEA.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $66.72 | $38.44 |
| CARP0326-024 | FLOOR LAYERCARPET ONLY | $42.03 | $29.19 |
| CARP0326-025 | FLOOR LAYERHARDWOOD FLOORS ONLY | $42.03 | $29.19 |
| PAIN0011-014 | GLAZIER | $43.13 | $26.75 |
| ASBE0033-002 | HEAT & FROST INSULATOR(INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $48.81 | $33.65 |
| IRON0015-010 | IRONWORKERREINFORCING, STRUCTURAL, ORNAMENTAL | $45.25 | $43.62 |
| LABO0230-001 | LABORERCOMMON OR GENERAL | $35.70 | $28.85 |
| LABO0230-001 | LABORERMASON TENDER-CEMENT/CONCRETE | $35.70 | $28.85 |
| PAIN0011-021 | PAINTERBRUSH AND ROLLER | $39.57 | $26.75 |
| PLUM0777-003 | PIPEFITTER | $50.58 | $35.85 |
| PLUM0777-001 | PLUMBER | $50.58 | $35.85 |
| PLUM0777-004 | PLUMBERHVAC PIPE INSTALLATION | $50.58 | $35.85 |
| ENGI0478-004 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 |
| ENGI0478-012 | POWER EQUIPMENT OPERATORCRANE UNDER 100 TON RATED CAPACITY) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 |
| ENGI0478-016 | POWER EQUIPMENT OPERATORLOADER - 7 CUBIC YARDS OR OVER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 |
| ENGI0478-005 | POWER EQUIPMENT OPERATOR, BULLDOZERFINEGRADE (SLOPES, SHAPING, LASER OR GPS, ETC.) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 |
| ENGI0478-005 | POWER EQUIPMENT OPERATOR, BULLDOZERROUGH GRADE DOZER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 |
| ROOF0009-001 | ROOFERCOMPOSITION | $45.15 | $23.53 |
| ROOF0009-001 | ROOFERSLATE AND TILE | $45.65 | $23.53 |
| ROOF0009-002 | ROOFER(INSTALLATION OF METAL ROOFS ONLY) | $45.15 | $23.53 |
| SHEE0040-001 | SHEET METAL WORKER(INCLUDING HVAC UNIT INSTALLATION) | $44.70 | $44.50 |
| SHEE0040-002 | SHEET METAL WORKER(METAL FLASHING AND HVAC DUCT INSTALLATION ONLY) | $44.70 | $44.50 |
| SFCT0669-002 | SPRINKLER FITTER | $53.76 | $33.44 |
| TEAM0191-001 | TRUCK DRIVERDUMP TRUCK | $36.39 | $32.68 |