Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Connecticut: Fairfield. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0326-018 | CARPENTER | $42.03 | $29.19 |
| SUCT2002-002 | CEMENT MASON/CONCRETE FINISHER | $17.89 | $0.00 |
| ELEC0003-004 | ELECTRICIAN(DARIEN, GREENWICH, NEW CANAAN, STAMFORD AND THE PORTION OF NORWALK LYING WEST OF FIVE MILE RIVER) | $45.00 | $36.63 |
| ELEC0488-006 | ELECTRICIAN(BETHEL, BRIDGEPORT, BROOKFIELD, DANBURY, EASTON, FAIRFIELD, MONROE, NEW FAIRFIELD, NEWTOWN, NORWALK, REDDING, RIDGEFIELD, SHELTON, SHERMAN, STRATFORD, TRUMBALL, WESTON, WESTPORT AND WILTON TOWNSHIPS) | $47.40 | $36.74 |
| PAIN0011-012 | GLAZIER A. PAID HOLIDAYSLABOR DAY AND CHRISTMAS DAY | $41.18 | $24.55 |
| SUCT2002-002 | LABORERSLANDSCAPE | $14.96 | $4.63 |
| SUCT2002-002 | LABORERSCOMMON OR GENERAL | $13.13 | $4.24 |
| PAIN0011-016 | PAINTERBRUSH AND ROLLER | $38.07 | $25.70 |
| PLUM0777-005 | PLUMBER/PIPEFITTER(INCLUDING HVAC PIPE INSTALLATION) | $50.58 | $35.85 |
| ENGI0478-006 | POWER EQUIPMENT OPERATORLOADER (UNDER 3 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $48.67 | $29.80 |
| ENGI0478-006 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR 2 CUBIC YARDS AND OVER A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 |
| ENGI0478-006 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR UNDER 2 CUBIC YARDS; RUBBER TIRE BACKHOE/EXCAVATOR A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $52.92 | $29.80 |
| ENGI0478-006 | POWER EQUIPMENT OPERATORBULLDOZER FINE GRADE A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 |
| ENGI0478-006 | POWER EQUIPMENT OPERATORBULLDOZER (ROUGH GRADE DOZER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 |
| ENGI0478-006 | POWER EQUIPMENT OPERATORCOMBINATION HOE AND LOADER A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.63 | $29.80 |
| ENGI0478-006 | POWER EQUIPMENT OPERATORLOADER (3 CUBIC YARDS UP TO 7 CUBIC YARDS) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 |
| ENGI0478-006 | POWER EQUIPMENT OPERATORLOADER (7 CUBIC YARDS OR OVER) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 |
| ROOF0012-003 | ROOFERSLATE & TILE ROOF A. PAID HOLIDAYS: JULY 4TH, LABOR DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE IS EMPLOYED 15 DAYS PRIOR TO THE HOLIDAY | $44.50 | $24.80 |
| SUCT2002-002 | ROOFER, EXCLUDES SLATE, AND TILE ROOFS | $23.39 | $7.87 |
| SHEE0038-003 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $34.95 | $22.70 |
| SFCT0676-002 | SPRINKLER FITTERFIRE SPRINKLERS A. PAID HOLIDAYS: MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS BEEN IN THE EMPLOYMENT OF A CONTRACTOR 20 WORKING DAYS PRIOR TO ANY SUCH PAID HOLIDAY | $49.98 | $33.44 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.