Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Colorado: Larimer. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUCO2013-010 | ACOUSTICAL CEILING MECHANIC | $21.08 | $0.00 |
| SUCO2013-010 | BRICKLAYER | $21.96 | $0.00 |
| SUCO2013-010 | CARPENTER(EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, AND DRYWALL HANGING) | $21.87 | $4.83 |
| SUCO2013-010 | CARPENTER(DRYWALL HANGING ONLY) | $16.91 | $0.00 |
| SUCO2013-010 | CARPENTER(DRYWALL FINISHING/TAPING ONLY) | $17.49 | $0.00 |
| SUCO2013-010 | CEMENT MASON/CONCRETE FINISHER | $21.44 | $10.23 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC0068-002 | ELECTRICIAN | $46.80 | $19.53 |
| ELEV0025-001 | ELEVATOR MECHANIC FOOTNOTEA.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $56.57 | $38.44 |
| PAIN0419-002 | FLOOR LAYERCARPET ONLY | $16.25 | $14.33 |
| SUCO2013-010 | INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $18.46 | $3.10 |
| IRON0024-009 | IRONWORKERORNAMENTAL | $39.21 | $12.50 |
| IRON0024-010 | IRONWORKER, STRUCTURAL | $39.21 | $12.50 |
| SUCO2013-010 | LABORERCOMMON OR GENERAL | $13.87 | $2.80 |
| SUCO2013-010 | LABORERPIPELAYER | $16.96 | $3.68 |
| SUCO2013-010 | LABORERMASON TENDER - CEMENT/CONCRETE | $16.00 | $0.00 |
| SUCO2013-010 | LABORERMASON TENDER - BRICK | $15.99 | $0.00 |
| SUCO2013-010 | OPERATORGRADER/BLADE | $21.50 | $0.00 |
| SUCO2013-010 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $18.58 | $2.42 |
| SUCO2013-010 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $20.78 | $5.78 |
| PAIN0079-009 | PAINTER(SPRAY) | $27.41 | $11.56 |
| SUCO2013-010 | PAINTER(BRUSH AND ROLLER) | $17.00 | $1.81 |
| PLUM0208-011 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC DUCT INSTALLATION) | $45.55 | $23.26 |
| PLUM0003-010 | PLUMBER(EXCLUDES HVAC DUCT AND PIPE INSTALLATION) | $47.23 | $21.68 |
| ENGI0009-017 | POWER EQUIPMENT OPERATORCRANE (50 TONS AND UNDER) | $35.78 | $15.20 |
| ENGI0009-017 | POWER EQUIPMENT OPERATORCRANE (91 TO 140 TONS) | $37.34 | $15.20 |
| ENGI0009-017 | POWER EQUIPMENT OPERATORCRANE (51 TO 90 TONS) | $36.09 | $15.20 |
| ENGI0009-017 | POWER EQUIPMENT OPERATORCRANE (141 TONS AND OVER) | $39.80 | $15.20 |
| SUCO2013-010 | ROOFER | $16.03 | $0.00 |
| SHEE0009-007 | SHEET METAL WORKER(INCLUDES HVAC DUCT INST24ALLATION; EXCLUDES HVAC PIPE INSTALLATION) | $43.05 | $22.65 |
| SUCO2013-010 | TRUCK DRIVERDUMP TRUCK | $17.34 | $0.00 |