Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Colorado: Clear Creek. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUCO2013-005 | BRICKLAYER | $21.96 | $0.00 |
| CARP0055-001 | CARPENTER(ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING ONLY) | $35.09 | $13.84 |
| SUCO2013-005 | CARPENTER(METAL STUD INSTALLATION ONLY) | $17.68 | $0.00 |
| SUCO2013-005 | CARPENTER(EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $21.78 | $6.17 |
| SUCO2013-005 | CEMENT MASON/CONCRETE FINISHER | $20.33 | $6.76 |
| PAIN0079-007 | DRYWALL FINISHER/TAPER | $28.11 | $11.56 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC0068-012 | ELECTRICIAN(INCLUDES LOW VOLTAGE WIRING) | $46.80 | $19.53 |
| ELEV0025-001 | ELEVATOR MECHANIC FOOTNOTEA.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $56.57 | $38.44 |
| PAIN0930-002 | GLAZIER | $37.26 | $13.15 |
| SUCO2013-005 | INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $23.12 | $7.97 |
| IRON0024-009 | IRONWORKERORNAMENTAL | $39.21 | $12.50 |
| IRON0024-010 | IRONWORKER, STRUCTURAL | $39.21 | $12.50 |
| SUCO2013-005 | LABORERMASON TENDER - CEMENT/CONCRETE | $16.00 | $0.00 |
| SUCO2013-005 | LABORERPIPELAYER | $16.96 | $3.68 |
| SUCO2013-005 | LABORERMASON TENDER - BRICK | $15.99 | $0.00 |
| SUCO2013-005 | LABORERCOMMON OR GENERAL | $14.86 | $4.98 |
| CARP1607-001 | MILLWRIGHT | $42.10 | $19.02 |
| SUCO2013-005 | OPERATORGRADER/BLADE | $21.50 | $0.00 |
| SUCO2013-005 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $20.78 | $5.78 |
| SUCO2013-005 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $19.10 | $3.89 |
| PAIN0079-006 | PAINTERBRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $27.41 | $11.56 |
| PLUM0208-008 | PIPEFITTER(INCLUDES HVAC PIPE AND UNIT INSTALLATION; EXCLUDES HVAC DUCT INSTALLATION) | $45.40 | $22.11 |
| PLUM0003-009 | PLUMBER(EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION) | $47.23 | $21.68 |
| ENGI0009-017 | POWER EQUIPMENT OPERATORCRANE (141 TONS AND OVER) | $39.80 | $15.20 |
| ENGI0009-017 | POWER EQUIPMENT OPERATORCRANE (91 TO 140 TONS) | $37.34 | $15.20 |
| ENGI0009-017 | POWER EQUIPMENT OPERATORCRANE (51 TO 90 TONS) | $36.09 | $15.20 |
| ENGI0009-017 | POWER EQUIPMENT OPERATORCRANE (50 TONS AND UNDER) | $35.78 | $15.20 |
| SUCO2013-005 | ROOFER | $16.96 | $0.00 |
| SHEE0009-004 | SHEET METAL WORKER(INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION) | $43.05 | $22.65 |
| PAIN0419-001 | SOFT FLOOR LAYER(VINYL AND CARPET) | $18.25 | $14.33 |
| SFCO0669-002 | SPRINKLER FITTER(FIRE SPRINKLERS) | $48.60 | $27.57 |
| SUCO2013-005 | TRUCK DRIVERDUMP TRUCK | $17.34 | $0.00 |
| SUCO2013-005 | WATERPROOFER | $16.94 | $0.00 |