Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 10 counties in Colorado: Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Rio Blanco, Routt, Summit. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP9901-009 | CARPENTER(EXCLUDES FORM WORK) | $33.11 | $12.17 |
| SUCO2011-008 | CARPENTER, FORM WORK ONLY(EAGLE, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $15.92 | $5.38 |
| SUCO2011-008 | CARPENTER, FORM WORK ONLY(GARFIELD) | $19.55 | $4.09 |
| SUCO2011-008 | CEMENT MASON/CONCRETE FINISHER(SUMMIT) | $15.55 | $2.85 |
| SUCO2011-008 | CEMENT MASON/CONCRETE FINISHER(EAGLE) | $17.59 | $2.85 |
| SUCO2011-008 | CEMENT MASON/CONCRETE FINISHER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $17.27 |
| $2.16 |
| SUCO2011-008 | CEMENT MASON/CONCRETE FINISHER(GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $18.23 | $2.85 |
| SUCO2011-008 | ELECTRICIANTRAFFIC SIGNALIZATION GROUNDSMAN (SUMMIT) | $16.75 | $4.10 |
| SUCO2011-008 | ELECTRICIANTRAFFIC SIGNALIZATION ELECTRICIAN (EAGLE, GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $28.24 | $8.52 |
| SUCO2011-008 | ELECTRICIAN(EXCLUDES TRAFFIC SIGNALIZATION) | $28.06 | $8.76 |
| SUCO2011-008 | ELECTRICIANTRAFFIC SIGNALIZATION GROUNDSMAN (EAGLE, GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $15.93 | $4.01 |
| SUCO2011-008 | GUARDRAIL INSTALLER(EAGLE) | $12.78 | $3.46 |
| SUCO2011-008 | GUARDRAIL INSTALLER(GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $12.78 | $3.31 |
| SUCO2011-008 | HIGHWAY/PARKING LOT STRIPINGPAINTER (EAGLE) | $13.85 | $3.07 |
| SUCO2011-008 | HIGHWAY/PARKING LOT STRIPINGPAINTER (GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMITT) | $13.97 | $3.07 |
| SUCO2011-008 | HIGHWAY/PARKING LOT STRIPINGTRUCK DRIVER (LINE STRIPING TRUCK) | $14.60 | $3.49 |
| IRON0024-006 | IRONWORKERSTRUCTURAL (GARFIELD COUNTY ONLY) | $39.21 | $12.50 |
| SUCO2011-008 | IRONWORKERREINFORCING (EXCLUDES GUARDRAIL INSTALLATION) | $16.94 | $6.77 |
| SUCO2011-008 | IRONWORKERSTRUCTURAL (EXCLUDES GUARDRAIL INSTALLATION) | $22.22 | $6.01 |
| SUCO2011-008 | LABORERTRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS)(EXCLUDES FLAGGERS) (JACKSON) | $12.93 | $3.22 |
| SUCO2011-008 | LABORERMASON TENDER-CEMENT/CONCRETE (EAGLE, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMITT) | $12.44 | $3.10 |
| SUCO2011-008 | LABORERMASON TENDER-CEMENT/CONCRETE (GARFIELD) | $14.87 | $3.10 |
| SUCO2011-008 | LABORERTRAFFIC CONTROL (FLAGGER) | $9.42 | $3.21 |
| SUCO2011-008 | LABORERTRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS)(EXCLUDES FLAGGERS) (EAGLE, GARFIELD, GRAND, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $12.39 | $3.20 |
| SUCO2011-008 | LABORERASPHALT RAKER (EAGLE) | $16.36 | $3.26 |
| SUCO2011-008 | LABORERASPHALT RAKER (GARFIELD) | $18.66 | $3.53 |
| SUCO2011-008 | LABORERASPHALT RAKER (GRAND) | $17.90 | $3.02 |
| SUCO2011-008 | LABORERASPHALT RAKER (JACKSON, LAKE, MOFFAT, ROUTT) | $17.75 | $3.75 |
| SUCO2011-008 | LABORERASPHALT RAKER (PITKIN) | $17.50 | $3.75 |
| SUCO2011-008 | LABORERASPHALT RAKER (RIO BLANCO) | $18.97 | $3.75 |
| SUCO2011-008 | LABORERASPHALT RAKER (SUMMIT) | $16.77 | $3.26 |
| SUCO2011-008 | LABORERCOMMON OR GENERAL (EAGLE, GARFIELD, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO. ROUTT, SUMMITT) | $12.44 | $3.53 |
| SUCO2011-008 | LABORERCOMMON OR GENERAL (GRAND) | $19.14 | $3.53 |
| SUCO2011-008 | LABORERCONCRETE SAW (HAND HELD) | $16.00 | $6.14 |
| SUCO2011-008 | LABORERLANDSCAPE AND IRRIGATION (EAGLE) | $14.84 | $3.16 |
| SUCO2011-008 | LABORERLANDSCAPE AND IRRIGATION (PITKIN) | $14.16 | $3.16 |
| SUCO2011-008 | LABORERLANDSCAPE AND IRRIGATION (SUMMIT) | $13.09 | $3.16 |
| SUCO2011-008 | LABORER, LANDSCAPE AND IRRIGATION(GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, RIO BLANCO, ROUTT) | $13.54 | $3.16 |
| SUCO2011-008 | PAINTERSPRAY ONLY (SUMMIT) | $19.96 | $3.52 |
| SUCO2011-008 | PAINTERSPRAY ONLY (GARFIELD, GRAND. JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $17.54 | $3.52 |
| SUCO2011-008 | PAINTERSPRAY ONLY (EAGLE) | $17.49 | $3.52 |
| ENGI0009-013 | POWER EQUIPMENT OPERATOR(5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER) | $35.41 | $15.20 |
| ENGI0009-013 | POWER EQUIPMENT OPERATOR(3)- DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR) | $35.03 | $15.20 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORGRADE CHECKER | $23.82 | $9.22 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORLOADER (FRONT END) (GARFIELD) | $21.93 | $9.22 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORLOADER (FRONT END) (GRAND, PITKIN) | $22.67 | $8.72 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORLOADER (FRONT END) (JACKSON, LAKE, MOFFATT, ROUTT) | $24.07 | $7.92 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORLOADER (FRONT END) (RIO BLANCO) | $23.67 | $9.22 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORLOADER (FRONT END) (SUMMIT) | $25.88 | $7.01 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORMECHANIC (EAGLE, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $23.31 | $3.93 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORMECHANIC (GARFIELD) | $19.80 | $4.20 |
| SUCO2011-008 | POWER EQUIPMENT OPERATOROILER (EAGLE) | $23.82 | $7.62 |
| SUCO2011-008 | POWER EQUIPMENT OPERATOROILER (GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $24.04 | $7.77 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (RIO BLANCO) | $23.67 | $9.22 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (EAGLE, GARFIELD, GRAND, JACKSON, LAKE, MOFFAT, PITKIN, ROUTT) | $22.72 | $5.98 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (SUMMIT) | $24.38 | $6.11 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORROTOMILL (EAGLE) | $18.86 | $4.41 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORROTOMILL (GARFIELD, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $20.70 | $4.41 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORROTOMILL (GRAND) | $23.48 | $4.41 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORROTOMILL (SUMMIT) | $16.28 | $4.41 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORSCRAPER | $20.60 | $7.99 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORSCREED (EAGLE) | $17.04 | $3.98 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORSCREED (GARFIELD, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, SUMMIT) | $23.76 | $5.05 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORSCREED (GRAND) | $23.29 | $4.05 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORTRACTOR | $15.08 | $2.95 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORASPHALT LAYDOWN (EAGLE, SUMMIT) | $22.67 | $8.72 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORASPHALT LAYDOWN (GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, ROUTT) | $24.09 | $7.93 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORASPHALT LAYDOWN (RIO BLANCO) | $23.67 | $9.22 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORASPHALT PAVER | $22.67 | $8.72 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORASPHALT PLANT | $19.27 | $4.47 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORASPHALT ROLLER (EAGLE) | $23.01 | $8.72 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORASPHALT ROLLER (GARFIELD, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $23.15 | $8.07 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORASPHALT ROLLER (GRAND) | $22.67 | $8.72 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORASPHALT SPREADER | $25.61 | $6.96 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBACKHOE/TRACKHOE (EAGLE) | $22.56 | $7.02 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBACKHOE/TRACKHOE (GARFIELD) | $19.40 | $4.42 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBACKHOE/TRACKHOE (GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $22.92 | $6.15 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBACKHOE/TRACKHOE (SUMMIT) | $24.30 | $5.75 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBOBCAT/SKID LOADER (EAGLE) | $18.25 | $4.32 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBOBCAT/SKID LOADER (GARFIELD) | $24.63 | $0.00 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBOBCAT/SKID LOADER (GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT) | $21.04 | $5.18 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBOBCAT/SKID LOADER (SUMMIT) | $19.77 | $4.28 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBROOM/SWEEPER (EAGLE) | $23.35 | $7.78 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBROOM/SWEEPER (GARFIELD, JACKSON, LAKE, MOFFATT, PITKIN, ROUTT) | $21.92 | $7.66 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBROOM/SWEEPER (GRAND) | $21.67 | $8.22 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBROOM/SWEEPER (RIO BLANCO) | $21.66 | $0.00 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBROOM/SWEEPER (SUMMIT) | $22.67 | $8.72 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORBULLDOZER | $26.78 | $7.05 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORCHIPPER | $22.04 | $8.26 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORCRANE | $23.82 | $9.22 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORDRILL | $20.84 | $2.66 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORFORKLIFT | $18.30 | $5.01 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORGRADER/BLADE | $23.05 | $6.45 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORGUARDRAIL/POST DRIVER | $16.07 | $4.41 |
| SUCO2011-008 | POWER EQUIPMENT OPERATORLOADER (FRONT END) (EAGLE) | $24.98 | $7.55 |
| ELEC0068-017 | TRAFFIC SIGNALIZATIONTRAFFIC SIGNAL INSTALLATION ZONE 1 (SUMMIT COUNTY) TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS ZONE 1 SHALL BE A 35 MILE RADIUS, MEASURED FROM THE FOLLOWING ADDRESSES IN EACH OF THE FOLLOWING CITIES: COLORADO SPRINGS - NEVADA & BIJOU DENVER - ELLSWORTH AVENUE & BROADWAY FT. COLLINS - PROSPECT & COLLEGE GRAND JUNCTION - 12TH & NORTH AVENUE PUEBLO - I-25 & HIGHWAY 50 ALL WORK OUTSIDE OF THESE AREAS SHALL BE PAID ZONE 2 RATES | $26.42 | $9.93 |
| ELEC0068-017 | TRAFFIC SIGNALIZATIONTRAFFIC SIGNAL INSTALLATION ZONE 2 (SUMMIT COUNTY) TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS ZONE 1 SHALL BE A 35 MILE RADIUS, MEASURED FROM THE FOLLOWING ADDRESSES IN EACH OF THE FOLLOWING CITIES: COLORADO SPRINGS - NEVADA & BIJOU DENVER - ELLSWORTH AVENUE & BROADWAY FT. COLLINS - PROSPECT & COLLEGE GRAND JUNCTION - 12TH & NORTH AVENUE PUEBLO - I-25 & HIGHWAY 50 ALL WORK OUTSIDE OF THESE AREAS SHALL BE PAID ZONE 2 RATES | $29.42 | $10.08 |
| SUCO2011-008 | TRUCK DRIVERLOWBOY TRUCK (EAGLE) | $18.89 | $4.56 |
| SUCO2011-008 | TRUCK DRIVERLOWBOY TRUCK (GARFIELD, GRAND, JACKSON, LAKE, MOFFATT, PITKIN, RIO BLANCO, ROUTT, SUMMIT) | $18.43 | $4.56 |
| SUCO2011-008 | TRUCK DRIVERMECHANIC | $17.79 | $3.51 |
| SUCO2011-008 | TRUCK DRIVERMULTI-PURPOSE SPECIALTY & HOISTING TRUCK | $14.60 | $3.49 |
| SUCO2011-008 | TRUCK DRIVERPICKUP AND PILOT CAR | $14.04 | $3.49 |
| SUCO2011-008 | TRUCK DRIVERSEMI | $20.72 | $0.00 |
| SUCO2011-008 | TRUCK DRIVERWATER TRUCK (EAGLE) | $23.05 | $2.90 |
| SUCO2011-008 | TRUCK DRIVERWATER TRUCK (GARFIELD) | $21.00 | $5.88 |
| SUCO2011-008 | TRUCK DRIVERWATER TRUCK (GRAND) | $21.19 | $3.01 |
| SUCO2011-008 | TRUCK DRIVERWATER TRUCK (JACKSON, LAKE, MOFFATT, PTIKIN, ROUTT, SUMMIT) | $20.39 | $3.43 |
| SUCO2011-008 | TRUCK DRIVERWATER TRUCK (RIO BLANCO) | $17.25 | $3.75 |
| SUCO2011-008 | TRUCK DRIVERDISTRIBUTOR (EAGLE, GARFIELD, GRAND, JACKSON, LAKE, MOFFAT, PITKIN, ROUTT, SUMMIT) | $19.07 | $4.35 |
| SUCO2011-008 | TRUCK DRIVERDISTRIBUTOR (RIO BLANCO) | $15.80 | $5.27 |
| SUCO2011-008 | TRUCK DRIVERDUMP TRUCK (EAGLE) | $16.17 | $3.83 |
| SUCO2011-008 | TRUCK DRIVERDUMP TRUCK (GARFIELD) | $16.29 | $3.83 |
| SUCO2011-008 | TRUCK DRIVERDUMP TRUCK (GRAND, JACKSON, LAKE, MOFFATT, ROUTT) | $17.79 | $4.02 |
| SUCO2011-008 | TRUCK DRIVERDUMP TRUCK (PITKIN) | $20.13 | $4.15 |
| SUCO2011-008 | TRUCK DRIVERDUMP TRUCK (RIO BLANCO) | $17.26 | $4.63 |
| SUCO2011-008 | TRUCK DRIVERDUMP TRUCK (SUMMIT) | $15.27 | $5.27 |