Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Arizona: Maricopa. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRAZ0003-001 | BRICKLAYER | $32.29 | $9.97 |
| CARP1912-001 | CARPENTER | $33.19 | $19.20 |
| SUAZ2019-002 | CEMENT MASON/CONCRETE FINISHER | $22.41 | $0.00 |
| SUAZ2019-002 | DRYWALL HANGER | $20.02 | $0.00 |
| ELEC0640-002 | ELECTRICIAN | $39.09 | $15.53 |
| IRON0075-012 | IRONWORKER | $33.00 | $19.91 |
| SUAZ2019-002 | LABORERPIPELAYER | $16.77 | $1.05 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUAZ2019-002 | LABORERMASON TENDER - CEMENT/CONCRETE | $18.11 | $3.64 |
| SUAZ2019-002 | LABORERCOMMON OR GENERAL | $17.95 | $3.97 |
| SUAZ2019-002 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $24.61 | $3.42 |
| SUAZ2019-002 | OPERATORROLLER | $23.62 | $6.44 |
| SUAZ2019-002 | OPERATORLOADER | $17.53 | $5.08 |
| SUAZ2019-002 | PAINTER | $19.85 | $3.54 |
| PLUM0469-010 | PIPEFITTER | $51.15 | $21.00 |
| PLUM0469-010 | PLUMBER | $51.15 | $21.00 |
| ENGI0428-016 | POWER EQUIPMENT OPERATORBULLDOZER | $31.69 | $13.52 |
| ENGI0428-016 | POWER EQUIPMENT OPERATORCRANE | $36.04 | $13.52 |
| SHEE0359-001 | SHEET METAL WORKER | $49.39 | $19.86 |
| SUAZ2019-002 | TILE SETTER | $21.50 | $0.00 |