Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Arkansas: Pulaski. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUAR2015-053 | CARPENTER, INCLUDES FORM WORK | $16.46 | $0.00 |
| SUAR2015-053 | CEMENT MASON/CONCRETE FINISHER | $18.34 | $3.41 |
| SUAR2015-053 | ELECTRICIAN | $23.22 | $9.75 |
| SUAR2015-053 | LABORERCOMMON OR GENERAL | $12.16 | $0.00 |
| SUAR2015-053 | LABORERPIPELAYER | $13.39 | $2.19 |
| SUAR2015-053 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $18.03 | $0.00 |
| SUAR2015-053 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| OPERATORBULLDOZER |
| $16.32 |
| $1.65 |
| SUAR2015-053 | OPERATORCRANE | $24.21 | $6.79 |
| SUAR2015-053 | OPERATORLOADER | $15.43 | $0.00 |
| SUAR2015-053 | PAINTER(BRUSH AND ROLLER) | $18.00 | $0.00 |
| SUAR2015-053 | TRUCK DRIVERDUMP TRUCK | $13.71 | $0.00 |