ELEVATOR CONSTRUCTORS leads the building schedule for Park County, WY at $58.95 base plus $43.59 fringe. The active federal wage determination covering building construction in Park County, WY lists 34 classifications with published rates, base pay from $12.46 to $58.95 per hour. The determination was last modified June 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS REMOVAL, ABATEMENT AND DEMOLITION | $23.00 | $0.00 | WY20260041 |
| BLINDS/WINDOW-COVERING INSTALLER | $12.46 | $0.00 | WY20260041 |
| BOILERMAKER | $44.37 | $28.26 | WY20260041 |
| BRICKLAYERS AND MASONS | $33.61 | $5.22 | WY20260041 |
The most recent modification to the governing determination is dated June 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
With 34 classifications carrying published rates, this is a comparatively deep schedule; most trades a building project needs appear without a conformance request.
Most rate lines here carry SU or state-adopted identifiers, meaning they come from wage surveys rather than negotiated agreements. Survey rates change less often but can jump when a new survey publishes.
A wage determination is cited as number plus modification, for example WY20260041 Mod dated June 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| CARPENTERS AND JOINERS |
| $35.04 |
| $12.39 |
| WY20260041 |
| CARPET, LINOLEUM AND RESILIENT TILE LAYERS | $34.63 | $0.00 | WY20260041 |
| CEMENT MASONS/PLASTERERS | $26.00 | $2.41 | WY20260041 |
| ELECTRICIANS | $38.47 | $10.96 | WY20260041 |
| ELEVATOR CONSTRUCTORS | $58.95 | $43.59 | WY20260041 |
| FIRE SPRINKLER INSTALLERS | $34.02 | $7.76 | WY20260041 |
| FIRE SYSTEM INSTALLERS(NON-WATER) | $30.88 | $3.97 | WY20260041 |
| GENERAL LABORERSGROUP 1 AXMEN, HAND FALLER; BIN WALL INSTALLER; BITUMINOUS CURB BUILDER; BURNER (CUTTING TORCH); CAR OR TRUCK LOADER; CONCRETE SAW; CONCRETE VIBRATOR; CONCRETE WORKER; CREOSOTE MATERIAL HANDLER; DUMPMAN; ERECTOR/INSTALLER (INCLUDES FENCES, GUARDRAIL, GUIDEPOSTS, ETC.); FLAGMAN; FORM SETTER; FORM STRIPPER; GENERAL LABORER; HAND OPERATED VIBRATOR ROLLER; JACKHAMMER/PAVEMENT BREAKER; LANDSCAPER; MATERIAL HANDLER; MECHANICAL FORM CLEANER; MORTARMAN; NOZZLEMAN; PIPE SETTER; PIPE WRAPPER; POWER SAW OP | $22.83 | $0.00 | WY20260041 |
| GLAZIERS | $24.03 | $0.00 | WY20260041 |
| IRONWORKER | $30.66 | $10.16 | WY20260041 |
| LIMITED ELECTRICIANS(90 VOLT OR LESS) | $35.54 | $7.66 | WY20260041 |
| MARBLE, TILE AND TERRAZZO SETTERS | $33.00 | $10.00 | WY20260041 |
| MECHANICAL, HEAT AND FROST INSULATION | $32.08 | $6.36 | WY20260041 |
| MILLWRIGHT MACHINERY WORKERS | $39.10 | $21.87 | WY20260041 |
| OPERATING ENGINEERSGROUP 1 A-FRAME TRUCK; AIR COMPRESSOR; ASPHALT PLANT FIREMAN/OILER; AUGER MACHINE (POST HOLE DIGGER); BRAKEMAN; BROOM OPERATOR; BUMP GRINDER OPERATOR; CABLEWAY SIGNALMAN; CHIP SPREADER OPERATOR; CONCRETE MIXER (UP TO 1 YARD); CONCRETE SAW OPERATOR; FARM TYPE TRACTOR; FORKLIFT OPERATOR; FORM GRADER; GENERATOR OPERATOR; GUNITE AND GRANITE MACHINE; HEATER OPERATOR; HEAVY DUTY REPAIRMAN; HOPPERMAN; JOINT MACHINE OPERATOR; LOCOMOTIVE FIREMAN; LONGITUDINAL FLOAT OPERATOR; LUBRICATION & SERVICE ENGINEE | $27.69 | $4.33 | WY20260041 |
| OPERATING ENGINEERSGROUP 2 ASPHALT PLANT OPERATOR; BACKHOE OPERATOR; CABLEWAY OPERATOR; CMI MACHINE & SIMILAR OPERATOR; COMPACTOR OPERATOR; CONCRETE BATCH PLANT OPERATOR; CRUSHING PLANT OPERATOR; DOUBLE DRUM HOIST; DRILLING MACHINERY OPERATOR; ELEVATING GRADER; FRONT-END LOADER (UP TO 1.5 YARDS); HYDRO-BLAST OPERATOR; JUMBO FORM OPERATOR; KOLMAN TYPE LOADER; LOCOMOTIVE ENGINEER; MAN LIFT ELEVATOR OPERATOR; MIXER OPERATOR (OVER 1 YARD); MUCKING MACHINE OPERATOR; PAVING MACHINE OPERATOR; PUMPCRETE OPERATOR (OVER 4 I | $29.95 | $4.33 | WY20260041 |
| OPERATING ENGINEERSGROUP 3 DOZER/PUSHCAT; DUAL DRUM MIXER; HYDRO CRANE (UNDER 15 TONS); MOTOR PATROL-GENERAL; SCRAPER; SIDEBOOM CAT OPERATOR; RIGGER; PUGMILL EQUIPMENT OPERATOR | $29.95 | $4.33 | WY20260041 |
| OPERATING ENGINEERSGROUP 4 FINISHER DOZER OPERATOR; HYDRO CRANE (15 TO 30 TONS); LOADER OPERATOR (1.5 YARDS TO 4 YARDS); PILEDRIVER; SHOVEL, DRAGLINE & CLAMSHELL (2 YARDS) | $33.93 | $5.88 | WY20260041 |
| OPERATING ENGINEERSGROUP 5 CARRY LIFT OPERATOR; CRANES (UNDER 25 TONS); GRADE-ALL; INSTRUMENT MAN; LOADER OPERATOR (4 TO 8 YARDS); MOLE OPERATOR; MOTOR PATROL-FINISHER; PUMPCRETE-MOBILE CRANE OR TRUCK | $50.00 | $5.88 | WY20260041 |
| OPERATING ENGINEERSGROUP 6 CRANES (25 TO 50 TONS); FOUR DRUM HOIST; HEAVY DUTY REPAIRMAN, WELDER; HYDROCRANE (30 TO 50 TONS); LOADER OPERATOR (OVER 8 YARDS); SCRAPER OPERATOR, TANDEM | $50.00 | $16.00 | WY20260041 |
| OPERATING ENGINEERSGROUP 7 CRANES (OVER 50 TONS); SHOVELS, DRAGLINES, & CLAMSHELLS (OVER 2 YARDS); WHEEL EXCAVATOR | $50.00 | $16.00 | WY20260041 |
| PAINTERS AND ALLIED TRADES | $24.03 | $0.00 | WY20260041 |
| PLUMBERS AND PIPEFITTERS | $39.95 | $11.70 | WY20260041 |
| ROOFERS | $24.89 | $3.14 | WY20260041 |
| SEMI-SKILLED LABORERSGROUP 2 ASPHALT RAKER & TAMPER; BRAKEMAN AND VIBRATOR MAN; GUNITE NOZZLEMAN; HIGH SCALAR; MUCKER & BULL GANG LABORER; SANDBLASTER NOZZLEMAN; SEWER PIPE INSTALLER | $23.73 | $4.28 | WY20260041 |
| SHEETMETAL WORKERS | $33.76 | $5.98 | WY20260041 |
| SHEETROCK AND DRYWALL INSTALLERS | $33.41 | $17.12 | WY20260041 |
| TENDERSGROUP 4 TENDERS BLASTER/POWDERMAN; CARPENTER TENDER; CEMENT MASON TENDER; CHUCK TENDER; DRILL OPERATORS FOR BLASTING & GROUTING; FORK LIFT OPERATOR; HOD CARRIERS; NIPPER; PILING/CAISSON WORKER; PLASTERER TENDER; SCAFFOLD BUILDER; SPADERS; TERRAZZO TENDERS; TILE SETTER TENDERS; TOP MAN OR TOP LANDER; TUGGERS; TUNNER & UNDERGROUND WORKER | $27.50 | $6.91 | WY20260041 |
| TRUCK DRIVERSGROUP 1 CEMENT TRUCK (UNDER 10 YARDS); DUMP TRUCK (UNDER 13 CUBIC YARDS); FLAT RACK TRUCK; FLEX BOOM-SINGLE AXLE & TWIN SCREW; FORKLIFT OPERATOR; FUEL/GREASE TRUCK; GREASE/SERVICE PERSON; LUMBER CARRIER; MATERIAL CHECKER; PICKUP TRUCK DRIVER; TRUCK DRIVER DISTRIBUTOR; TRUCK MECHANIC; WAREHOUSE PERSON; WATER TRUCK (SINGLE AXLE) | $24.75 | $5.05 | WY20260041 |
| TRUCK DRIVERSGROUP 2 CARDEX PERSON; CEMENT MIXER (OVER 10 YARDS); DUMP TRUCK (OVER 13 CUBIC YARDS); DUMPSTER TYPE EQUIPMENT; EXPEDITOR; HIGHBOY, LOWBOY, FLOATS, SEMI-TRUCK; LEAD WAREHOUSE PERSON; SCALE PERSON/CHECKER/SPOTTER; SNOW PLOW; TIRE REPAIRMAN; TRUCK/DIESEL MECHANIC; WATER TRUCK (SEMI, TANDEM AXLE, EUCLID); WINCH POLE-A-FRAME | $27.88 | $5.05 | WY20260041 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.