ELEVATOR MECHANIC FOOTNOTE leads the building schedule for Chippewa County, WI at $62.52 base plus $38.44 fringe. The active federal wage determination covering building construction in Chippewa County, WI lists 33 classifications with published rates, base pay from $8.73 to $62.52 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | $55.34 | $34.03 | WI20260006 |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR | $25.36 | $8.37 | WI20260006 |
| BOILERMAKER(BOILERMAKER) | $46.52 | $34.63 | WI20260006 |
| BRICKLAYER & TILE SETTER |
The highest published base on this schedule belongs to ELEVATOR MECHANIC FOOTNOTE at $62.52 per hour plus $38.44 fringe; the schedule's median base is $41.43.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
85% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example WI20260006 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $39.50 |
| $28.69 |
| WI20260006 |
| CARPENTER(INCLUDING ACOUSTICAL WORK, DRYWALL HANGING & PILEDRIVERMAN; EXCLUDING BATT INSULATION) | $41.43 | $29.99 | WI20260006 |
| CEMENT MASON/CONCRETE FINISHER | $37.25 | $27.84 | WI20260006 |
| DRYWALL FINISHER/TAPER | $24.61 | $12.15 | WI20260006 |
| ELECTRICIAN | $44.29 | $25.21 | WI20260006 |
| ELECTRICIANSTELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK) | $31.17 | $20.08 | WI20260006 |
| ELEVATOR MECHANIC FOOTNOTEA.PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $62.52 | $38.44 | WI20260006 |
| GLAZIER | $42.72 | $11.93 | WI20260006 |
| IRONWORKER | $46.35 | $36.86 | WI20260006 |
| LABORERASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS NOTE: MASON TENDER $1.00 OVER GENERAL LABORER | $36.65 | $19.97 | WI20260006 |
| LABORER, GENERAL. NOTEMASON TENDER $1.00 OVER GENERAL LABORER | $37.70 | $19.97 | WI20260006 |
| LABORERSLANDSCAPE | $8.73 | $4.90 | WI20260006 |
| LABORERSCONCRETE WORKER | $16.34 | $3.59 | WI20260006 |
| MILLWRIGHT | $42.00 | $28.85 | WI20260006 |
| PAINTER | $24.11 | $12.15 | WI20260006 |
| PLASTERER | $39.75 | $25.10 | WI20260006 |
| PLUMBER/PIPEFITTER(INCLUDING HVAC WORK) | $50.94 | $25.98 | WI20260006 |
| POWER EQUIPMENT OPERATORGROUP 5 TRACTOR, BULLDOZER, OR ENDLOADER (UNDER 40 HP); TAMPERS -COMPACTORS, RIDING TYPE; STUMP CHIPPER, LARGE; ROLLER, RUBBER TIRE; BACKFILLER; TRENCHER, CHAIN TYPE (BUCKET UNDER 8 INCH); CONCRETE AUTO BREAKER, LARGE; CONCRETE FINISHING MACHINE (ROAD TYPE); CONCRETE BATCH HOPPER; CONCRETE CONVEYOR SYSTEMS; CONCRETE MIXERS, 14S OR OVER; PUMPS, SCREW TYPE AND GYPSUM); HYDROHAMMERS, SMALL; BROOMS AND SWEEEPRS; LIFT SLAB MACHINE; ROLLER UNDER 5 TONS; INDUSTRIAL LOCOMOTIVES; FIREMAN (PILE DRIVERS AN | $43.13 | $27.89 | WI20260006 |
| POWER EQUIPMENT OPERATORGROUP 6 SHOULDERING MACHINE OPERATOR; FARM OR INDUSTRIAL TRACTOR MOUNTED EQUIPMENT; POST HOLE DIGGER; AUGER (VERTICAL AND HORIZONTAL); SKID STEER LOADER WITH OR WITHOUT ATTACHMENTS; ROBOTIC TOOL CARRIER WITH OR WITHOUT ATTACHMENTS; POWER PACK VIBRATORY/ULTRA SOUND DRIVER AND EXTRACTOR; FIREMAN (ASPHALT PLANTS); SCREED OPERATOR; STONE CRUSHERS AND SCREENING PLANTS; AIR, ELECTRIC, HYDRAULIC JACKS (SLIP FORM); PRESTRESS MACHINES; AIR COMPRESSOR, 400 CFM OR OVER; REFRIGERATION PLANT/FREESE MACHINE; | $41.60 | $27.89 | WI20260006 |
| POWER EQUIPMENT OPERATORGROUP 4 HYDRAULIC BACKHOE (TRACTOR OR TRUCK MOUNTED); HYDRAULIC CRANE, 10 TONS OR LESS; TRACTOR, BULLDOZER, OR END LOADER (OVER 40 HP); MOTOR PATROL; SCRAPER OPERATOR; BITUMINOUS PLANT AND PAVER OPERATOR; SCREED-MILLING MACHINE; ROLLER OVER 5 TONS; CONCRETE PUMPS 46 METER & UNDER; GROUT PUMPS; ROTEC TYPE MACHINE; HYDRO BLASTER, 10,000 PSI AND OVER; ROTARY DRILL OPERATOR; PERCUSSION DRILLING MACHINE; AIR TRACK DRILL WITH OR WITHOUT INTEGRAL HAMMER; BLASTER; BORING MACHINE (VERTICAL OR HORIZONTAL) | $45.20 | $27.89 | WI20260006 |
| POWER EQUIPMENT OPERATORGROUP 3 BACKHOES (EXCAVATORS) WEIGHING UNDER 130,000 LBS; TRAVELLING CRANE (BRIDGE TYPE); MILLING MACHINE; CONCRETE PAVER OVER 27 E; CONCRETE SPREADER AND DISTRIBUTOR; CONCRETE LASER SCREED; CONCRETE GRINDER AND PLANING MACHINE; SLIPFORM CURB AND GUTTER MACHINE; BORING MACHINE (DIRECTIONAL); DREDGE OPERATOR; SKID RIGS; OVER 46 METER CONCRETE PUMP. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER | $45.73 | $27.89 | WI20260006 |
| POWER EQUIPMENT OPERATORGROUP 2 BACKHOES (EXCAVATORS) WEIGHING 130,000 LBS & OVER; CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF 100 TONS OR LESS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS 175 FT OR LESS; CAISSON RIGS; PILE DRIVER HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $49.28 | $27.89 | WI20260006 |
| POWER EQUIPMENT OPERATORGROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $50.53 | $27.89 | WI20260006 |
| ROOFER | $18.01 | $3.28 | WI20260006 |
| SHEET METAL WORKER(INCLUDING HVAC DUCT WORK AND TECHNICIANS) | $42.00 | $31.56 | WI20260006 |
| SOFT FLOOR LAYER | $41.43 | $29.99 | WI20260006 |
| SPRINKLER FITTER | $51.68 | $29.73 | WI20260006 |
| TILE & MARBLE FINISHER | $13.89 | $8.25 | WI20260006 |
| TRUCK DRIVER(1 & 2 AXLES) | $39.57 | $28.70 | WI20260006 |
| TRUCK DRIVER(3 OR MORE AXLES) | $39.72 | $28.70 | WI20260006 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.