HEAT & FROST INSULATOR leads the building schedule for Spokane County, WA at $75.37 base plus $18.82 fringe. The active federal wage determination covering building construction in Spokane County, WA lists 43 classifications with published rates, base pay from $23.07 to $75.37 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BRICKLAYER | $39.57 | $20.50 | WA20260114 |
| CARPENTER | $44.21 | $17.28 | WA20260114 |
| CEMENT MASON/CONCRETE FINISHER | $40.89 | $18.64 | WA20260114 |
| DRYWALL FINISHER/TAPER | $37.46 | $18.42 | WA20260114 |
| DRYWALL HANGER |
Across the 43 published classifications for building work in Spokane County, WA, base pay spans $23.07 to $75.37 per hour with a median of $40.39.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
86% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example WA20260114 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $44.21 |
| $17.28 |
| WA20260114 |
| ELECTRICIAN | $49.55 | $19.09 | WA20260114 |
| ELEVATOR MECHANIC | $53.78 | $22.86 | WA20260114 |
| GLAZIER | $23.07 | $3.99 | WA20260114 |
| HEAT & FROST INSULATOR(INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 | WA20260114 |
| IRONWORKER | $43.40 | $32.77 | WA20260114 |
| LABORERCOMMON OR GENERAL | $37.13 | $16.90 | WA20260114 |
| LABORERGRADE CHECKER | $40.21 | $16.90 | WA20260114 |
| LABORERPIPELAYER | $37.80 | $16.90 | WA20260114 |
| LABORERHOD CARRIER | $38.05 | $16.75 | WA20260114 |
| LABORERFORM STRIPPING | $50.38 | $16.96 | WA20260114 |
| LABORERJACKHAMMER | $51.52 | $16.99 | WA20260114 |
| LABORERNOZZLE PERSON | $52.31 | $17.01 | WA20260114 |
| LABORERFIRE WATCH | $40.56 | $15.60 | WA20260114 |
| LABORERMASON TENDER - CEMENT/CONCRETE | $29.14 | $12.05 | WA20260114 |
| LABORERCONCRETE SAW CHAIN | $35.03 | $10.86 | WA20260114 |
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 | WA20260114 |
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE (45,000 GW & UNDER) | $39.71 | $23.40 | WA20260114 |
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE (OVER 110,000 GW) | $40.39 | $23.40 | WA20260114 |
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE (45,000 GW TO 110,000 GW) | $40.05 | $23.40 | WA20260114 |
| OPERATOROILER | $36.39 | $16.62 | WA20260114 |
| OPERATORBOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 | WA20260114 |
| PAINTER | $41.24 | $14.70 | WA20260114 |
| PIPEFITTER | $65.20 | $34.91 | WA20260114 |
| PLUMBER | $47.15 | $27.20 | WA20260114 |
| POWER EQUIPMENT OPERATORGroup 9::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $43.34 | $23.40 | WA20260114 |
| POWER EQUIPMENT OPERATORGroup 8::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $42.36 | $23.40 | WA20260114 |
| POWER EQUIPMENT OPERATORGroup 7::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $40.39 | $23.40 | WA20260114 |
| POWER EQUIPMENT OPERATORGroup 6::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $40.05 | $23.40 | WA20260114 |
| POWER EQUIPMENT OPERATORGroup 5::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $39.71 | $23.40 | WA20260114 |
| POWER EQUIPMENT OPERATORGroup 4::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $39.51 | $23.40 | WA20260114 |
| POWER EQUIPMENT OPERATORGroup 3::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $39.31 | $23.40 | WA20260114 |
| POWER EQUIPMENT OPERATORGroup 1::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $38.17 | $23.40 | WA20260114 |
| ROOFER, EXCLUDES METAL ROOFS | $35.64 | $14.89 | WA20260114 |
| SHEETMETAL WORKER(INCLUDING METAL ROOFING) | $45.83 | $27.92 | WA20260114 |
| TILE FINISHER | $27.26 | $11.99 | WA20260114 |
| TILE SETTER | $36.35 | $14.57 | WA20260114 |
| TRUCK DRIVERCONCRETE TRUCK | $55.43 | $27.52 | WA20260114 |
| TRUCK DRIVERDUMP TRUCK | $37.22 | $20.93 | WA20260114 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.