PIPEFITTER leads the building schedule for Okanogan County, WA at $75.21 base plus $33.88 fringe. The active federal wage determination covering building construction in Okanogan County, WA lists 39 classifications with published rates, base pay from $11.30 to $75.21 per hour. The determination was last modified May 18, 2026.
CEMENT MASON/CONCRETE FINISHERZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE
Across the 39 published classifications for building work in Okanogan County, WA, base pay spans $11.30 to $75.21 per hour with a median of $42.51.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
79% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
Using these rates
Read the modification number
A wage determination is cited as number plus modification, for example WA20260035 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Put the WD in your bid file
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
Check rates the Friday before payroll
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
Match classifications by duties, not titles
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
Fringe crediting basics
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
Statement of Compliance wording
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Questions
Which wage determination applies to my project in Okanogan County?
The wage determination incorporated into your contract is the one that governs, per 29 CFR 1.6. For new building work in Okanogan County, WA, the current active determination is WA20260035. Verify with your contracting officer before bidding or paying.
How often do these rates change?
DOL publishes wage determination modifications weekly, generally on Fridays. The determination behind this page was last modified May 18, 2026.
What is the difference between the base rate and the fringe rate?
The base rate is the minimum hourly wage; the fringe amount is an additional hourly benefit obligation you can meet with bona fide benefit contributions or pay in cash. On this schedule the median fringe is about 46% of base.
My classification is not listed for Okanogan County. What do I do?
If the work classification you need is not on the determination, the contractor requests a conformance (additional classification and rate) through the contracting agency using Standard Form 1444. Do not substitute a similar-sounding classification.
What counts as building construction?
Building covers sheltered enclosures with walk-in access, such as offices, schools, and warehouses, including incidental site work. Single-family and low-rise residential work uses the residential schedule instead.
Does the federal rate or the Washington state prevailing wage apply?
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE
POWER EQUIPMENT OPERATORGROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)
POWER EQUIPMENT OPERATORGROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)
POWER EQUIPMENT OPERATORGROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)
POWER EQUIPMENT OPERATORGROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)
POWER EQUIPMENT OPERATORGROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)
POWER EQUIPMENT OPERATORGROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)
POWER EQUIPMENT OPERATORGROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)
POWER EQUIPMENT OPERATORGROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)
POWER EQUIPMENT OPERATORGROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)
POWER EQUIPMENT OPERATORGROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)
POWER EQUIPMENT OPERATORGROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.
They are separate systems. Davis-Bacon rates apply to federally funded or assisted work; a state prevailing wage law can apply to state-funded work. A project can be covered by both, in which case the higher rate for each classification effectively controls. This page shows the federal determination only.
Is the WH-347 form mandatory?
The WH-347 itself is optional; what is mandatory on covered work is submitting weekly certified payroll with the same information and a signed Statement of Compliance. Most contractors use the WH-347 layout because agencies expect it.