HEAT & FROST INSULATOR leads the building schedule for Franklin County, WA at $75.37 base plus $18.82 fringe. The active federal wage determinations covering building construction in Franklin County, WA list 90 classifications with published rates, base pay from $21.94 to $75.37 per hour. The determination was last modified May 20, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.51 | $22.89 | WA20260002 |
| BOILERMAKER | $43.83 | $32.56 | WA20260002 |
| BRICKLAYER | $39.57 | $20.50 | WA20260107 |
| BRICKLAYER | $38.48 | $20.09 | WA20260002 |
| CARPENTER |
The most recent modification to the governing determination is dated May 20, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
With 90 classifications carrying published rates, this is a comparatively deep schedule; most trades a building project needs appear without a conformance request.
This schedule mixes sources: 34% of lines carry union identifiers and the rest are survey-based. Two crews on one site can be governed by rates that update on entirely different rhythms.
A wage determination is cited as number plus modification, for example WA20260002 Mod dated May 20, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $44.21 |
| $17.28 |
| WA20260107 |
| CARPENTERMILLWRIGHT & MACHINE ERECTOR | $59.83 | $19.05 | WA20260002 |
| CARPENTERPILEDRIVER | $47.41 | $16.56 | WA20260002 |
| CARPENTERTENDERS | $51.73 | $16.56 | WA20260002 |
| CARPENTERDIVERS | $52.73 | $16.56 | WA20260002 |
| CARPENTERCARPENTERS | $45.86 | $16.56 | WA20260002 |
| CEMENT MASON/CONCRETE FINISHER(GROUP 3) Grinding, bushing or chipping of toxic materials or high density concrete; Operating of power tools on a scaffold | $40.68 | $17.04 | WA20260002 |
| CEMENT MASON/CONCRETE FINISHER(GROUP 1) Rodding, tamping, floating, troweling, patching, stoning, rubbing, sack rubbing; All exposed aggregate finishing and sealing. All architectural finishing, staining, stamping and coloring, washing and power washing of concrete, polymer, latex and composite materials; Setting of screeds, screeds forms, curb and gutter and sidewalk forms; Preparation of all concrete for caulking of the joints and the caulking of expansion joints; Preparation of concrete for the application of hardners, se | $39.55 | $17.04 | WA20260002 |
| CEMENT MASON/CONCRETE FINISHER(GROUP 2) Power troweling machine operator; Troweling of magnesite, torganal or material with epoxy bases of oxichloride base; All power grinders, bushing hammer, chipping gun; Gunite Nozzleman. All sandblasting for architectural finishes, patch preparation and exposing of aggregate for finish; Concrete sawing and cutting for concrete and expansion joints and scoring for decorative patterns; Operating of Clary-type floats, Longitudinal Floats, Rodding Machines and Belting Machines; Scarifiers; W | $40.17 | $17.04 | WA20260002 |
| CEMENT MASON/CONCRETE FINISHER | $21.94 | $0.00 | WA20260107 |
| DRYWALL FINISHER/TAPER | $35.45 | $18.13 | WA20260002 |
| ELECTRICIAN | $60.00 | $27.78 | WA20260107 |
| ELECTRICIANCABLE SPLICERS | $60.90 | $26.01 | WA20260002 |
| ELECTRICIANELECTRICIANS | $58.00 | $25.92 | WA20260002 |
| ELEVATOR MECHANIC. FOOTNOTEA. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $67.61 | $38.44 | WA20260107 |
| HEAT & FROST INSULATOR(INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 | WA20260107 |
| IRONWORKER | $43.40 | $32.77 | WA20260107 |
| IRONWORKER | $41.91 | $32.27 | WA20260002 |
| LABORERGRADE CHECKER | $40.21 | $16.90 | WA20260107 |
| LABORERPIPELAYER | $37.80 | $16.90 | WA20260107 |
| LABORERHOD CARRIER | $38.05 | $16.75 | WA20260107 |
| LABORERFORM STRIPPING | $50.38 | $16.96 | WA20260107 |
| LABORERJACKHAMMER | $51.52 | $16.99 | WA20260107 |
| LABORERNOZZLE PERSON | $52.31 | $17.01 | WA20260107 |
| LABORERFIRE WATCH | $40.56 | $15.60 | WA20260107 |
| LABORERGROUP 8 Powderman | $37.65 | $16.30 | WA20260002 |
| LABORERGROUP 9 Grade Checker | $38.03 | $16.30 | WA20260002 |
| LABORERGROUP 1- FLAGMAN, LANDSCAPE LABORER, SCALEMAN, TRAFFIC CONTROL SUPERVISOR, ASBESTOS ABATEMENT WORKER, BRICK PAVERS (TO INCLUDE THE INSTALLATION OF BRICK OR GRASS PAVERS FOR SIDEWALKS, DRIVEWAYS, STREETS, AND PARKING LOTS), BRUCH HOG FEEDER; CARPENTER TENDER; CEMENT HANDLER; CONCRETE SIGNALMAN; CONCRETE CREWMAN (TO INCLUDE STRIPPING OF FORMS, HAND OPERATING JACKS ON SLIP FORM CONSTRUCTION, APPLICATION OF CONCRETE CURING COMOUNDS, PUMPCRETE MACHINE, SIGNALING, HANDLING THE NOZZLE OF SQUEEZCRETE OR | $35.10 | $16.30 | WA20260002 |
| LABORERGROUP 5 SANDHOGS-[(32-38 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $310.95per shift | $16.30 | WA20260002 |
| LABORERGROUP 5 SANDHOGS-[(38-44 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $312.36per shift | $16.30 | WA20260002 |
| LABORERGROUP 6 Construction Specialist | $35.94 | $16.30 | WA20260002 |
| LABORERGROUP 7 Hod Carrier | $37.10 | $16.30 | WA20260002 |
| LABORERGROUP 5 SANDHOGS-[(22-26 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $305.37per shift | $16.30 | WA20260002 |
| LABORERGROUP 5 SANDHOGS-[(18-22 LBS),(6 HRS)] RATE PER SHIFT. (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $301.05per shift | $16.30 | WA20260002 |
| LABORERGROUP 5 SANDHOGS-[(14-18 LBS),(6 HRS)] RATE PER SHIFT(RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $300.77per shift | $16.30 | WA20260002 |
| LABORERGROUP 5 SANDHOGS-[(1-14 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $295.84per shift | $16.30 | WA20260002 |
| LABORERGROUP 5 OUTSIDE LOCK AND GAUGE TENDER (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $288.48per shift | $16.30 | WA20260002 |
| LABORERGROUP 4 Drills with dual masts, Miner, Class """"D""""(to include Raise and Shaft Miner, Laser Beam Operator on raises and shafts.) Welder, electric, manual or automatic, Remote Equipment Operator (to include HDPE or similar pipe and liner) | $36.06 | $16.30 | WA20260002 |
| LABORERGROUP 3- AIR AND HYDRAULIC TRACK DRILL, ASPHALT RAKER, BRUSH MACHINE (TO INCLUDE HORIZONTAL CONSTRUCTION JOINT CLEAN-UP BRUSH MACHINE, POWER PROPELLED); CAISSON WORKER, FREE AIR; CHAIN SAW OPERATOR AND FALLER; CONCRETE STACK (TO INCLUDE LABORERS WHEN WORKING ON FREE STANDING CONCRETE STACKS FOR SMOKE OR FUME CONTROL ABOVE 40 FT HIGH); FUNNITE (TO INCLUDE OPERATION OF MACHINE AND NOZZLE); GUNNITE (TO INCLUDE OPERATION OF MACHINE AND NOZZEL); HIGH SCALER; MINER, CLASS ""C"" (TO INCLUDE MINER, NOZZ | $35.74 | $16.30 | WA20260002 |
| LABORERGROUP 2- ASPHALT ROLLER, WALKING; CEMENT FINISHER TENDER; CONCRETE SAW, WALKING; DEMOLITION TORCH; DOPE POT FIREMAN, NON-MECHANICAL; DRILLER TENDER (WHEN REQUIRED TO MOVE AND POSITION MACHINE); FORM SETTER, PAVING; JACKHAMMER OPERATOR; MINER, CLASS ""B"" (TO INCLUDE BRAKEMAN, FINISHER, VIBRATOR, AND FORM SETTER); NOZZLEMAN (TO INCLUDE SQUEEZE AND FLOW-CRETE NOZZLE); NOZZLEMAN, WATER, (TO INCLUDE FIRE HOSE), AIR OR STEAM; PAVEMENT BREAKER (UNDER 90 LBS); PIPELAYER, CORRUGATED METAL AND MULTI-PLAT | $35.42 | $16.30 | WA20260002 |
| LABORERGROUP 5 SANDHOGS-[(26-32 LBS),(6 HRS)] RATE PER SHIFT (RATES INCREASES ARE COMPUTED BY MULTIPLYING THE INCREASE X 8 HOUR SHIFT AND ADD TOTAL TO THE PREVIOUS RATE.) | $307.99per shift | $16.30 | WA20260002 |
| LABORERMASON TENDER - CEMENT/CONCRETE | $29.14 | $12.05 | WA20260107 |
| LABORERCOMMON OR GENERAL | $35.51 | $1.50 | WA20260107 |
| LABORERCONCRETE SAW CHAIN | $35.03 | $10.86 | WA20260107 |
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 | WA20260107 |
| OPERATORBOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 | WA20260107 |
| OPERATOROILER | $36.39 | $16.62 | WA20260107 |
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $28.10 | $0.00 | WA20260107 |
| PAINTER | $41.24 | $14.70 | WA20260107 |
| PAINTER(SOFT FLOOR COVERS, GLAZIERS, SPRAY PAINTERS, STEEL PAINTERS, STEAM CLEAN AND ACID ETCHING, SIGN WRITERS) | $38.11 | $16.27 | WA20260002 |
| PIPEFITTER | $65.20 | $34.91 | WA20260107 |
| PLUMBER | $47.15 | $27.20 | WA20260107 |
| PLUMBER/PIPEFITTER | $62.95 | $33.76 | WA20260002 |
| POWER EQUIPMENT OPERATORGroup 1::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $38.17 | $23.40 | WA20260107 |
| POWER EQUIPMENT OPERATORGroup 3::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $39.31 | $23.40 | WA20260107 |
| POWER EQUIPMENT OPERATORGroup 4::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $39.51 | $23.40 | WA20260107 |
| POWER EQUIPMENT OPERATORGroup 5::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $39.71 | $23.40 | WA20260107 |
| POWER EQUIPMENT OPERATORGroup 6::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $40.05 | $23.40 | WA20260107 |
| POWER EQUIPMENT OPERATORGroup 8::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $42.36 | $23.40 | WA20260107 |
| POWER EQUIPMENT OPERATORGroup 7::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $40.39 | $23.40 | WA20260107 |
| POWER EQUIPMENT OPERATORGroup 9::Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic-90% of The Regu | $43.34 | $23.40 | WA20260107 |
| POWER EQUIPMENT OPERATORGROUP 8 Cranes(all cranes over 100 tons); Climbing, Rail and Tower Cranes over 45 tons ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft .50 hr. additional to classification Over 200 ft .80 hr. additional to classificaiton. ALL CRANE BOOMS, INCLUDING TOWER CRANES: Measure from center of rotation to center of shaft (radius): 130 ft TO 200 ft .50 hr. additional to classification Over 200 ft .80 hr. additional to classificaiton | $41.22 | $22.45 | WA20260002 |
| POWER EQUIPMENT OPERATORGROUP 6 Asphalt Plant Operator (Backhoes (1 yd to 3 yds); Blade (finish and bluetop) Automatic, CMI, ABC and similar when used as automatic; Boom Cats (side); Cableway Operators; Clamshell Operators (under 3 yds); Concrete Slip Form Paver; Cranes (over 25 tons, including 45 tons); Crusher, Grizzle and Screening Plant Operator; Draglines (under 3 yds); Elevating Belt (holland type); Gradall (1 yd to 3 yds); Loader Operator (front-end and overhead, 4 yards, including 8 yds); Mucking Machine; Quadt | $37.96 | $22.45 | WA20260002 |
| POWER EQUIPMENT OPERATORGROUP 5 Automatic Subgrader (Ditches and Trimmers) (Autograde, ABC, R.A. Hansen and similar on grade wire); Backhoe (under 1 yd); Batch Plant (over 4 units); Batch and Wet Mix Operator (mutiple units, 2 and including 4); Boat Operator; Cableway Controller (dispatcher); Concrete Pump Boom Truck; Conveyor Aggregate Placement Equipment; Cranes (25 tons and under); Derricks and Stifflegs (under 65 tons); Drill Doctor; Multiple Dozer Units with single blade; Paving Machine (asphalt and concrete); Pil | $37.64 | $22.45 | WA20260002 |
| POWER EQUIPMENT OPERATORGROUP 4 Blade Operator (motor patrol and attachments); Concrete Pumps (squeeze-crete, flow-crete, pump-crete, Whitman and similar); Drilling Equipment (8 inch bit and over) (Robbins, reverse circulation and similar); Drills (Churn, Core, Calyx, or Diamond); Equipment Serviceman, Greaser and Oiler; Hoe Ram; Hoist (2 or more drums or Tower Hoist); Loaders (overhead and front-end, under 4 yards R/T);Paving (Dual Drum) Rubber Tire; Refrigeration Plant Engineers (under 1000 ton); Signalman (Whileys, | $37.34 | $22.45 | WA20260002 |
| POWER EQUIPMENT OPERATORGROUP 3 A-Frame Truck (2 or more drums); Assistant Regrigeration Plant and Chiller Operator (over 1000 ton); Backfillers (Cleveland and similar); Batch Plant and Wet Mix Operator single unit (concrete); Belt-crete Conveyors with power pack or similar; Belt Laoder (Kocal or similar); Bend Machine; Bob Cat; Boring Machine (earth); Boring Machine (rock under 8 inch bit) (Quarry Master, Joy or similar); Bump Cutter (Wayne, Saginau or similar); Canal Lining Machine (concrete) Chipper (without crane), | $36.99 | $22.45 | WA20260002 |
| POWER EQUIPMENT OPERATORGROUP 2 A-Frame Truck (single drum); Assistant Refrigeration Plant (under 1000 ton); Assistant Plant Operator, Fireman or Pugmixer (asphalt); Bagley or Stationary Scraper; Belt Finishing Machine; Blower Operator (cement); Cement Hog; Compresor (2000 CFM or over, 2 or more, gas, diesel or electric power); Concrete Saw (multiple cut); Distributor Leverman; Ditch Witch or similar; Elevator, hoisting materials; Dope Pots (power agitated); Fork Lift or Lumber Stacker, Hydra-lift and similar; Gin Truc | $36.28 | $22.45 | WA20260002 |
| POWER EQUIPMENT OPERATORGROUP 1 Bit Grinders; Bolt Threading Machine; Compressors (under 2000 CFM, gas, diesel or electric power); Crusher Feeder (mechanical); Deck Hand; Drillers Tender; Fireman and Heater Tender; Grade Checker; Tender Mechanic, Welder H.D.; Hydro- seeder, Mulcher, Nozzleman; Oiler; Oiler and Cable Tender, Mucking Machine; Pumpman; Rollers, all types on subgrade (farm type, Case, John Deere and similar, or Compacting Vibrator), except when pulled by Dozer with operable blade; Steam Cleaner; Welding Ma | $35.91 | $22.45 | WA20260002 |
| POWER EQUIPMENT OPERATORGROUP 7 Backhoes (3 yds and over); Cranes (All Cranesover 45 tons, including 100 tons) Climbing, Rail and Tower Cranes up to including 45 tons; Clamshell Operator (3 yds. and over); Derricks and Stifflegs (65 tons and over); Draglines (3 yds and over); Lead Water Well Driller; Loader (360 degrees revolving Koehring Scooper or similar); Loaders (overhead and front-end, over 8 yds); Shovels (3 yds and over); Whirleys and Hammerheads, all; Vacuum Blasting Machine Operator; HD Mechanic/welder ALL CR | $39.11 | $22.45 | WA20260002 |
| ROOFER(INCLUDING WATERPROOFER AND KETTLEMAN) | $34.72 | $13.31 | WA20260002 |
| ROOFER, EXCLUDES METAL ROOFS | $35.64 | $14.89 | WA20260107 |
| SHEET METAL WORKER | $47.76 | $27.70 | WA20260002 |
| SHEETMETAL WORKER(INCLUDING METAL ROOFING) | $50.00 | $28.41 | WA20260107 |
| SPRINKLER FITTER | $41.33 | $28.58 | WA20260002 |
| TILE FINISHER | $27.26 | $11.99 | WA20260107 |
| TILE SETTER | $36.35 | $14.57 | WA20260107 |
| TRUCK DRIVERGROUP 1 Escort Driver or Pilot Car tender and swamper, Pickup Hauling Employees or Materials | $33.83 | $21.81 | WA20260002 |
| TRUCK DRIVERGROUP 8 Lowboy, over 50 tons; Prime movers & stinger truck; Transit Mixers and truck hauling concrete, over 20 yards; Trucks, side, end bottom and articulated end dump, over 100 yards | $37.88 | $21.81 | WA20260002 |
| TRUCK DRIVERGROUP 7 Dumps, semi-end; Flagerty Spreader Box Driver; Flowboys; Fork lift, 16,000 lbs and over; Lowboy, 50 tons and under; Mechanic, Field; Oil Distributors Driver (road, bootperson, leverperson); and Oil Tank Driver; Self-Loading Roll Off and Dumpster over 6 yds; Stringer Truck (cable operated trailer); Tractor with Steer Trailer; Transfer Truck & Trailer; Transit Mixers & Truck Hauling Concrete: over 6 yards to and including 20 yards; Truck & Pup; Trucks, side, end, bottom, & articulated end | $37.56 | $21.81 | WA20260002 |
| TRUCK DRIVERGROUP 6 A-Frame; Service Greaser; Tireperson; Truck, side, end, and bottom & articulated end dump (up to and including 12 yds); Water Tank Truck, 4001 to 8000 gallons, Warehouseperson, to include shipping and receiving | $37.22 | $21.81 | WA20260002 |
| TRUCK DRIVERGROUP 5 Auto Crane, 2000 lbs capacity; Dumptor (6 yds and under); Flat Bed Truck (with hydraulic system); Fork Lift (3001-16,000 lbs); Fuel Truck Driver, steam cleaner and washer; Rubber-tired Tunnel Jumbo; Scissors Truck; Slurry Truck Driver; Transite Mixers & mixers hauling concrete 3 yd to and including 6 yd.; Wrecker and Tow Trucks | $37.02 | $21.81 | WA20260002 |
| TRUCK DRIVERGROUP 4 Buggy Mobile and similar; Bulk Cement Tanks and Spreader; Power Operated Sweeper; Straddle Carrier (Ross, Hyster and similar); Water Tank Truck, 1801-4000 gallons | $36.91 | $21.81 | WA20260002 |
| TRUCK DRIVERGROUP 3 Bus Driver or Employee Haul Driver; Flat Bed Truck, dual rear axle; Power Boat hauling employees or material | $36.58 | $21.81 | WA20260002 |
| TRUCK DRIVERGROUP 2 Flat Bed Truck, single rear axle; Fork Lift, 3000 lbs and under; Leverperson Loading Trucks at Bunkers; Seeder and Mulcher; Stationary Fuel Operator; Team Driver; Tractor (small rubber tired, pulling trailer or similar equipment); Trailer Mounted hydro Seeder and Mulcher; Water Tank Truck, up to 1800 gallons | $36.47 | $21.81 | WA20260002 |
| TRUCK DRIVERCONCRETE TRUCK | $55.43 | $27.52 | WA20260107 |
| TRUCK DRIVERDUMP TRUCK | $37.22 | $20.93 | WA20260107 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.