DECKHAND leads the heavy schedule for Aransas County, TX at $16.85 base plus $0.00 fringe. The active federal wage determinations covering heavy construction in Aransas County, TX list 60 classifications with published rates, base pay from $8.60 to $16.85 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASPHALT DISTRIBUTOR OPERATOR | $12.57 | $0.00 | TX20260045 |
| ASPHALT PAVING MACHINE OPERATOR | $11.60 | $0.00 | TX20260045 |
| ASPHALT RAKER | $10.63 | $0.00 | TX20260045 |
| ASPHALT SHOVELER | $9.23 | $0.00 | TX20260045 |
| BROOM OR SWEEPER OPERATOR |
The highest published base on this schedule belongs to DECKHAND at $16.85 per hour plus $0.00 fringe; the schedule's median base is $12.97.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
Most rate lines here carry SU or state-adopted identifiers, meaning they come from wage surveys rather than negotiated agreements. Survey rates change less often but can jump when a new survey publishes.
A wage determination is cited as number plus modification, for example TX20260045 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Certified payroll uses the employee's name and an individually identifying number, normally the last four digits of the Social Security number. Full SSNs do not belong on submitted payrolls.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $9.32 |
| $0.00 |
| TX20260045 |
| BULLDOZER OPERATOR | $11.69 | $0.00 | TX20260045 |
| CARPENTER | $11.70 | $0.00 | TX20260045 |
| CONCRETE FINISHER, PAVING | $11.64 | $0.00 | TX20260045 |
| CONCRETE FINISHER, STRUCTURES | $10.23 | $0.00 | TX20260045 |
| CONCRETE RUBBER | $9.00 | $0.00 | TX20260045 |
| CRANE, CLAMSHELL, BACKHOE, DERRICK, DRAGLINE, SHOVEL OPERATOR | $12.00 | $0.00 | TX20260045 |
| DECKHAND(DREDGE UNDER 16"") | $16.85 | $0.00 | TX20260033 |
| DECKHAND(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| DERRICK OPERATOR | $16.85 | $0.00 | TX20260033 |
| DOZER OPERATOR | $16.85 | $0.00 | TX20260033 |
| DREDGE TENDER OPERATOR(DREDGE UNDER 16"") | $16.85 | $0.00 | TX20260033 |
| DREDGE TENDER OPERATOR(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| FIREMAN(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| FIRST ASSISTANT ENGINEER(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| FIRST COOK(HYDRAULIC DREDGING) | $16.85 | $0.00 | TX20260033 |
| FLAGGER | $8.60 | $0.00 | TX20260045 |
| FORM BUILDER/SETTER, STRUCTURES | $10.51 | $0.00 | TX20260045 |
| FORM SETTER, PAVING & CURB | $9.48 | $0.00 | TX20260045 |
| FOUNDATION DRILL OPERATOR, TRUCK MOUNTED | $14.58 | $0.00 | TX20260045 |
| FRONT END LOADER OPERATOR | $10.62 | $0.00 | TX20260045 |
| HANDYMAN(HYDRAULIC DREDGING) | $16.85 | $0.00 | TX20260033 |
| JANITOR - CABIN PERSON(HYDRAULIC DREDGING) | $16.85 | $0.00 | TX20260033 |
| LABORER, COMMON | $8.91 | $0.00 | TX20260045 |
| LABORER, UTILITY | $9.21 | $0.00 | TX20260045 |
| LEVERMAN(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| LEVERMAN(DREDGE UNDER 16"") | $16.85 | $0.00 | TX20260033 |
| MECHANIC(UNDEFINED) | $12.18 | $0.00 | TX20260045 |
| MESS PERSON(HYDRAULIC DREDGING) | $16.85 | $0.00 | TX20260033 |
| MOTOR GRADER OPERATOR FINE GRADE | $15.15 | $0.00 | TX20260045 |
| MOTOR GRADER OPERATOR ROUGH | $12.95 | $0.00 | TX20260045 |
| OILER(DREDGE UNDER 16"") | $16.85 | $0.00 | TX20260033 |
| OILER(MARSH BUGGY DRAGLINE) | $16.85 | $0.00 | TX20260033 |
| OILER(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| OPERATOR(MARSH BUGGY DRAGLINE) | $16.85 | $0.00 | TX20260033 |
| PAVEMENT MARKING MACHINE OPERATOR | $13.32 | $0.00 | TX20260045 |
| PIPELAYER | $9.71 | $0.00 | TX20260045 |
| ROLLER OPERATOR, PNEUMATIC, SELF-PROPELLED | $8.90 | $0.00 | TX20260045 |
| ROLLER OPERATOR, STEEL WHEEL, FLAT WHEEL/TAMPING | $9.30 | $0.00 | TX20260045 |
| ROLLER OPERATOR, STEEL WHEEL, PLANT MIX PAVEMENT | $10.59 | $0.00 | TX20260045 |
| SCRAPER OPERATOR | $9.85 | $0.00 | TX20260045 |
| SECOND ASSISTANT ENGINEER(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| SECOND COOK(HYDRAULIC DREDGING) | $16.85 | $0.00 | TX20260033 |
| SERVICER | $11.18 | $0.00 | TX20260045 |
| SHOREMAN(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| SPREADER BOX OPERATOR | $13.00 | $0.00 | TX20260045 |
| THIRD ASSISTANT ENGINEER(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| TRAVELING MIXER OPERATOR | $12.67 | $0.00 | TX20260045 |
| TRUCK DRIVER(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| TRUCK DRIVER, LOWBOY-FLOAT | $13.70 | $0.00 | TX20260045 |
| TRUCK DRIVER SINGLE AXLE HEAVY | $10.87 | $0.00 | TX20260045 |
| TRUCK DRIVER SINGLE AXLE, LIGHT | $10.85 | $0.00 | TX20260045 |
| TRUCK DRIVER, TANDEM AXLE, SEMI-TRAILER | $10.05 | $0.00 | TX20260045 |
| WELDER(DREDGE 16"" AND OVER) | $16.85 | $0.00 | TX20260033 |
| WELDER(DREDGE UNDER 16"") | $16.85 | $0.00 | TX20260033 |
| WORK ZONE BARRICADE SERVICERWORK ZONE BARRICADE SERVICER | $9.63 | $0.00 | TX20260045 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.