MACHINIST leads the heavy schedule for Allendale County, SC at $54.00 base plus $10.70 fringe. The active federal wage determinations covering heavy construction in Allendale County, SC list 80 classifications with published rates, base pay from $7.25 to $54.00 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS ABATEMENT WORKER/HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $16.00 | $0.25 | SC20260002 |
| ASBESTOS WORKER/INSULATOR(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $32.00 | $22.49 | SC20260002 |
| BOILERMAKER(TANK WORK) | $12.96 | $3.32 | SC20260001 |
Across the 80 published classifications for heavy work in Allendale County, SC, base pay spans $7.25 to $54.00 per hour with a median of $23.20.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
Most rate lines here carry SU or state-adopted identifiers, meaning they come from wage surveys rather than negotiated agreements. Survey rates change less often but can jump when a new survey publishes.
A wage determination is cited as number plus modification, for example SC20260001 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| BOILERMAKER | $34.21 | $24.26 | SC20260002 |
| BRICKLAYER | $7.25 | $0.00 | SC20260001 |
| BRICKLAYER | $29.70 | $16.85 | SC20260002 |
| CARPENTER | $7.42 | $0.00 | SC20260001 |
| CARPENTER | $34.15 | $15.44 | SC20260002 |
| CEMENT MASON | $28.74 | $16.73 | SC20260002 |
| CEMENT MASON/CONCRETE FINISHER | $7.25 | $0.00 | SC20260001 |
| COOK(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $8.11 | $1.73 | SC20260004 |
| DECKHAND(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $7.77 | $1.73 | SC20260004 |
| DREDGING, HYDRAULIC DREDGES OVER 20"": CLASS B2: CERTIFIED WELDER. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR | $39.46 | $14.73 | SC20260004 |
| DREDGING, HYDRAULIC DREDGES OVER 20"": CLASS A2: CRANE OPERATOR (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT T | $43.20 | $14.99 | SC20260004 |
| DREDGING, HYDRAULIC DREDGES OVER 20"":CLASS A1: DECK CAPTAIN, LEVERMAN, MECHANICAL DREDGE OPERATOR. LICENSED TUG OPERATOR OVER 1000 HP. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHR | $48.48 | $15.34 | SC20260004 |
| DREDGING, HYDRAULIC DREDGES OVER 20"": CLASS B1: DERRICK OPERATOR (180 SWING), SPIDER/SPILL BARGE OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTI | $41.93 | $14.90 | SC20260004 |
| DREDGING, HYDRAULIC DREDGES OVER 20"": CLASS D: SHOREMAN, DECKHAND, RODMAN, SCOWMAN, COOK, MESSMAN, OILER, JANITOR, DRILL OILER. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS | $30.86 | $14.15 | SC20260004 |
| DREDGING, HYDRAULIC DREDGES OVER 20"": CLASS C2: BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR AL | $37.15 | $14.57 | SC20260004 |
| DREDGING, HYDRAULIC DREDGES OVER 20"": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD | $38.38 | $14.66 | SC20260004 |
| ELECTRICIAN(GROUNDMAN) | $24.31 | $17.74 | SC20260002 |
| ELECTRICIAN(LINEMAN) | $35.75 | $17.74 | SC20260002 |
| ELECTRICIAN(CABLE SPLICER) | $37.00 | $17.74 | SC20260002 |
| ELEVATOR CONSTRUCTOR | $51.11 | $40.04 | SC20260002 |
| ENGINEER(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $9.59 | $1.73 | SC20260004 |
| GLAZIER | $29.27 | $14.55 | SC20260002 |
| IRONWORKER | $10.98 | $0.00 | SC20260001 |
| IRONWORKER | $35.72 | $15.72 | SC20260002 |
| LABORERS(CHAIN SAW) | $7.25 | $0.00 | SC20260001 |
| LABORERS(PIPELAYER) | $7.25 | $0.00 | SC20260001 |
| LABORERSGENERAL | $7.25 | $0.00 | SC20260001 |
| LABORERS(HAZARDOUS WASTE VERIFIER) | $23.32 | $13.22 | SC20260002 |
| LABORERS(PNEUMATIC CONCRETE GUN OPERATOR) | $23.07 | $13.22 | SC20260002 |
| LABORERS(PNEUMATIC TOOL OPERATOR) | $22.82 | $13.22 | SC20260002 |
| LABORERS(TOOL FACILITY OPERATOR) | $23.32 | $13.22 | SC20260002 |
| LABORERS(CONCRETE & BUILDING) | $22.57 | $13.22 | SC20260002 |
| LABORERS(MORTAR MIXER) | $22.82 | $13.22 | SC20260002 |
| LABORERS(NOZZLEPERSON) | $23.07 | $13.22 | SC20260002 |
| LABORERS(PIPELAYER) | $22.82 | $13.22 | SC20260002 |
| LAUNCHMAN(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $8.19 | $1.73 | SC20260004 |
| LEVERMAN(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $10.03 | $1.73 | SC20260004 |
| LINE CONSTRUCTIONLINE TECHNICIAN | $10.08 | $0.00 | SC20260001 |
| MACHINIST | $54.00 | $10.70 | SC20260002 |
| MANHOLE BUILDER | $7.25 | $0.00 | SC20260001 |
| MATE(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $8.82 | $1.73 | SC20260004 |
| MESS COOK(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $7.71 | $1.73 | SC20260004 |
| MESSMAN & JANITOR(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $7.53 | $1.73 | SC20260004 |
| MILLWRIGHT | $35.05 | $20.09 | SC20260002 |
| OILER & FIREMAN(HYDRAULIC DREDGES UNDER 20"") | $8.11 | $1.73 | SC20260004 |
| PAINTER(COMPOSITE RATE APPLIES TO ALL WORK PERFORMED BY JOURNEYMAN PAINTERS AND SIGN PAINTERS EXCEPT WHEN ENGAGED IN INDUSTRIAL PREMIUM WORK.) | $29.27 | $14.55 | SC20260002 |
| PILEDRIVER | $34.40 | $15.44 | SC20260002 |
| PIPEFITTER | $9.09 | $0.00 | SC20260001 |
| PIPEFITTER | $39.06 | $17.41 | SC20260002 |
| PLASTERER | $28.74 | $16.73 | SC20260002 |
| POWER EQUIPMENT OPERATORSMECHANIC | $7.25 | $0.00 | SC20260001 |
| POWER EQUIPMENT OPERATORSFRONT END LOADER | $7.25 | $0.00 | SC20260001 |
| POWER EQUIPMENT OPERATORS(PAN SCRAPER) | $7.25 | $0.00 | SC20260001 |
| POWER EQUIPMENT OPERATORSMOTOR GRADER | $7.25 | $0.00 | SC20260001 |
| POWER EQUIPMENT OPERATORSBULLDOZER | $7.25 | $0.00 | SC20260001 |
| POWER EQUIPMENT OPERATORSCRANE | $7.98 | $0.00 | SC20260001 |
| POWER EQUIPMENT OPERATORSDRAGLINE | $7.25 | $0.00 | SC20260001 |
| POWER EQUIPMENT OPERATORS(BACKHOE) | $7.25 | $0.00 | SC20260001 |
| POWER EQUIPMENT OPERATORS(BATCH PLANT; BULLDOZER; CONCRETE MIXER (OVER 10 S); DISTRIBUTOR (BITUMINOUS SURFACES); END LOADER; FORK LIFT TRUCK; LEAD OILER; PAN SCRAPER; PAVING MACHINE; PUMPCRETE; TRENCHING MACHINE; WELL DRILL) | $33.12 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(OILER) | $26.28 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(PUMP (2-1/2 IN. AND OVER); TRACTOR (UNDER 50 HP); FIREPERSON (BOILER); OILER) | $26.28 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(BACKHOE; CENTRAL MIXING PLANT; CONCRETE PLACING MACHINE; CRANE, DERRICK, DRAGLINE; HOIST, 2-DRUM; MOTOR GRADER; SHOVEL; SIDEBOOM TRACTOR; TOWER/PEDESTAL CRANE; HOIST, 1-DRUM (HOISTING PERSONNEL); MECHANIC (DIESEL & GAS); MAXI GRINDER) | $36.00 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(FIREMAN (BOILER)) | $26.28 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(AIR COMPRESSOR; CONCRETE MIXER (10 S OR LESS); CONVEYOR; ELEVATOR; HOIST, 1-DRUM; LIGHT PLANT; MOTOR CRANE DRIVER AND OILER; ROLLER; TRACTOR (50 HP AND OVER)) | $29.88 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(MECHANIC (DIESEL & GAS)) | $36.00 | $18.42 | SC20260002 |
| ROOFER(BUILT-UP, COMPOSITION AND WATERPROOFING) | $29.00 | $9.90 | SC20260002 |
| SHEET METAL WORKER | $37.00 | $18.11 | SC20260002 |
| SHOREMAN(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $7.82 | $1.73 | SC20260004 |
| SPIDER BARGE OPERATOR(HYDRAULIC DREDGES UNDER 20"").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE | $8.68 | $1.73 | SC20260004 |
| SPILL BARGE OPERATOR(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $8.68 | $1.73 | SC20260004 |
| SPRINKLER FITTER | $37.22 | $24.25 | SC20260002 |
| TILE SETTER | $29.70 | $16.85 | SC20260002 |
| TRUCK DRIVER | $7.25 | $0.00 | SC20260001 |
| TRUCK DRIVERSUNDER 2-1/2 TONS FOOTNOTE: HEALTH & WELFARE WEEKLY RATE: $393.90 | $31.51 | $12.68 | SC20260002 |
| TRUCK DRIVERSOILER (LIGHT EQUIPMENT & GARAGE ATTENDANT) FOOTNOTE: HEALTH & WELFARE WEEKLY RATE: $393.90 | $31.79 | $12.68 | SC20260002 |
| TRUCK DRIVERS2-1/2 TONS & OVER, AND SPECIAL EQUIPMENT FOOTNOTE: HEALTH & WELFARE WEEKLY RATE: $393.90 | $32.14 | $12.68 | SC20260002 |
| WELDER(HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIV | $9.79 | $1.73 | SC20260004 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.