MACHINIST leads the building schedule for Allendale County, SC at $54.00 base plus $10.70 fringe. The active federal wage determinations covering building construction in Allendale County, SC list 51 classifications with published rates, base pay from $10.62 to $54.00 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS ABATEMENT WORKER/HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $16.00 | $0.25 | SC20260002 |
| ASBESTOS WORKER/INSULATOR(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $32.00 | $22.49 | SC20260002 |
| BOILERMAKER | $34.21 | $24.26 | SC20260002 |
The highest published base on this schedule belongs to MACHINIST at $54.00 per hour plus $10.70 fringe; the schedule's median base is $28.74.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
Most rate lines here carry SU or state-adopted identifiers, meaning they come from wage surveys rather than negotiated agreements. Survey rates change less often but can jump when a new survey publishes.
A wage determination is cited as number plus modification, for example SC20260018 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| BRICKLAYER |
| $29.70 |
| $16.85 |
| SC20260002 |
| CARPENTER | $34.15 | $15.44 | SC20260002 |
| CARPENTER, EXCLUDES FORM WORK | $15.42 | $0.00 | SC20260018 |
| CEMENT MASON | $28.74 | $16.73 | SC20260002 |
| ELECTRICIAN(CABLE SPLICER) | $37.00 | $17.74 | SC20260002 |
| ELECTRICIAN(LINEMAN) | $35.75 | $17.74 | SC20260002 |
| ELECTRICIAN(GROUNDMAN) | $24.31 | $17.74 | SC20260002 |
| ELECTRICIAN | $19.99 | $4.04 | SC20260018 |
| ELEVATOR CONSTRUCTOR | $51.11 | $40.04 | SC20260002 |
| FORM WORKER | $14.08 | $0.00 | SC20260018 |
| GLAZIER | $29.27 | $14.55 | SC20260002 |
| IRONWORKER | $35.72 | $15.72 | SC20260002 |
| LABORERPIPELAYER | $12.50 | $1.23 | SC20260018 |
| LABORERCOMMON OR GENERAL | $10.62 | $0.55 | SC20260018 |
| LABORERS(MORTAR MIXER) | $22.82 | $13.22 | SC20260002 |
| LABORERS(CONCRETE & BUILDING) | $22.57 | $13.22 | SC20260002 |
| LABORERS(HAZARDOUS WASTE VERIFIER) | $23.32 | $13.22 | SC20260002 |
| LABORERS(NOZZLEPERSON) | $23.07 | $13.22 | SC20260002 |
| LABORERS(PIPELAYER) | $22.82 | $13.22 | SC20260002 |
| LABORERS(PNEUMATIC CONCRETE GUN OPERATOR) | $23.07 | $13.22 | SC20260002 |
| LABORERS(PNEUMATIC TOOL OPERATOR) | $22.82 | $13.22 | SC20260002 |
| LABORERS(TOOL FACILITY OPERATOR) | $23.32 | $13.22 | SC20260002 |
| MACHINIST | $54.00 | $10.70 | SC20260002 |
| MILLWRIGHT | $35.05 | $20.09 | SC20260002 |
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $16.39 | $1.83 | SC20260018 |
| PAINTER(COMPOSITE RATE APPLIES TO ALL WORK PERFORMED BY JOURNEYMAN PAINTERS AND SIGN PAINTERS EXCEPT WHEN ENGAGED IN INDUSTRIAL PREMIUM WORK.) | $29.27 | $14.55 | SC20260002 |
| PAINTERBRUSH, ROLLER AND SPRAY | $13.50 | $0.00 | SC20260018 |
| PILEDRIVER | $34.40 | $15.44 | SC20260002 |
| PIPEFITTER | $39.06 | $17.41 | SC20260002 |
| PIPEFITTER | $18.95 | $3.39 | SC20260018 |
| PLASTERER | $28.74 | $16.73 | SC20260002 |
| PLUMBER | $16.99 | $2.17 | SC20260018 |
| POWER EQUIPMENT OPERATORS(BACKHOE; CENTRAL MIXING PLANT; CONCRETE PLACING MACHINE; CRANE, DERRICK, DRAGLINE; HOIST, 2-DRUM; MOTOR GRADER; SHOVEL; SIDEBOOM TRACTOR; TOWER/PEDESTAL CRANE; HOIST, 1-DRUM (HOISTING PERSONNEL); MECHANIC (DIESEL & GAS); MAXI GRINDER) | $36.00 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(AIR COMPRESSOR; CONCRETE MIXER (10 S OR LESS); CONVEYOR; ELEVATOR; HOIST, 1-DRUM; LIGHT PLANT; MOTOR CRANE DRIVER AND OILER; ROLLER; TRACTOR (50 HP AND OVER)) | $29.88 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(BATCH PLANT; BULLDOZER; CONCRETE MIXER (OVER 10 S); DISTRIBUTOR (BITUMINOUS SURFACES); END LOADER; FORK LIFT TRUCK; LEAD OILER; PAN SCRAPER; PAVING MACHINE; PUMPCRETE; TRENCHING MACHINE; WELL DRILL) | $33.12 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(FIREMAN (BOILER)) | $26.28 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(MECHANIC (DIESEL & GAS)) | $36.00 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(OILER) | $26.28 | $18.42 | SC20260002 |
| POWER EQUIPMENT OPERATORS(PUMP (2-1/2 IN. AND OVER); TRACTOR (UNDER 50 HP); FIREPERSON (BOILER); OILER) | $26.28 | $18.42 | SC20260002 |
| ROOFER(BUILT-UP, COMPOSITION AND WATERPROOFING) | $29.00 | $9.90 | SC20260002 |
| SHEET METAL WORKER | $37.00 | $18.11 | SC20260002 |
| SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $19.15 | $1.15 | SC20260018 |
| SPRINKLER FITTER | $37.22 | $24.25 | SC20260002 |
| TILE SETTER | $29.70 | $16.85 | SC20260002 |
| TRUCK DRIVER | $12.76 | $2.04 | SC20260018 |
| TRUCK DRIVERSUNDER 2-1/2 TONS FOOTNOTE: HEALTH & WELFARE WEEKLY RATE: $393.90 | $31.51 | $12.68 | SC20260002 |
| TRUCK DRIVERSOILER (LIGHT EQUIPMENT & GARAGE ATTENDANT) FOOTNOTE: HEALTH & WELFARE WEEKLY RATE: $393.90 | $31.79 | $12.68 | SC20260002 |
| TRUCK DRIVERS2-1/2 TONS & OVER, AND SPECIAL EQUIPMENT FOOTNOTE: HEALTH & WELFARE WEEKLY RATE: $393.90 | $32.14 | $12.68 | SC20260002 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.