ELECTRICIAN leads the building schedule for Venango County, PA at $51.45 base plus $29.77 fringe. The active federal wage determination covering building construction in Venango County, PA lists 38 classifications with published rates, base pay from $18.41 to $51.45 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR(INDUSTRIAL; MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $46.50 | $29.43 | PA20260070 |
| BOILERMAKER | $48.28 | $33.17 | PA20260070 |
| BRICKLAYERINCLUDING POINTING, CAULKING, CLEANING AND BRICK REFRACTORY WORK ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $34.14 | $22.77 | PA20260070 |
| CARPENTER(ACOUSTICAL CEILING INSTALLATION, FLOOR LAYING-HARDWOOD FLOORS, CARPET, AND VINYL) |
The highest published base on this schedule belongs to ELECTRICIAN at $51.45 per hour plus $29.77 fringe; the schedule's median base is $34.14.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
82% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example PA20260070 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $35.94 |
| $19.02 |
| PA20260070 |
| CARPENTER(SCAFFOLD BUILDING ONLY) | $35.94 | $19.02 | PA20260070 |
| CARPENTER(DRYWALL HANGING, METAL STUD INSTALLATION AND FORM WORK ONLY) | $31.95 | $17.09 | PA20260070 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND METALSTUD INSTALLATION, FLOOR LAYER - CARPET, HARDWOOD, AND VINYL, FORM WORK AND SCAFFOLD BUILDING | $25.57 | $10.53 | PA20260070 |
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | PA20260070 |
| ELECTRICIAN(INCLUDES INSTALLATION OF SOUND AND COMMUNICATION SYSTEM AND LOW VOLTAGE WIRING; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION AND ALARM INSTALLATION) | $49.11 | $36.79 | PA20260070 |
| ELECTRICIAN(ALARM INSTALLATION ONLY) | $51.45 | $29.77 | PA20260070 |
| ELECTRICIAN(HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $29.05 | $16.89 | PA20260070 |
| GLAZIER | $28.30 | $10.73 | PA20260070 |
| IRONWORKER(REINFORCING, STRUCTURAL AND METAL ROOF INSTALLATION ONLY) | $36.26 | $28.16 | PA20260070 |
| LABORER(COMMON OR GENERAL; CONCRETE WORKER) | $26.82 | $19.39 | PA20260070 |
| LABORERMASON TENDER - CEMENT/CONCRETE | $18.41 | $6.45 | PA20260070 |
| MASON - STONE ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $34.14 | $22.77 | PA20260070 |
| MECHANICAL INSULATOR, INCLUDING DUCT AND PIPE AND EXCLUDING WORK ON INDUSTRIAL SITES | $30.60 | $17.16 | PA20260070 |
| MILLWRIGHT | $43.00 | $23.44 | PA20260070 |
| PAINTER(SPRAY ONLY, EXCLUDES WORK ON INDUSTRIAL SITES) | $27.95 | $16.12 | PA20260070 |
| PAINTERBRUSH AND ROLLER ONLY | $30.56 | $23.72 | PA20260070 |
| PAINTERDRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 | PA20260070 |
| PAINTER(INDUSTRIAL: SPRAY ONLY) | $36.01 | $23.72 | PA20260070 |
| PIPEFITTER(INDUSTRIAL) | $47.75 | $26.55 | PA20260070 |
| PIPEFITTER(EXCLUDES HVAC PIPE INSTALLATION AND WORK ON INDUSTRIAL SITES) | $40.02 | $26.55 | PA20260070 |
| PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $48.15 | $29.17 | PA20260070 |
| PLASTERER | $30.69 | $18.99 | PA20260070 |
| PLUMBER | $46.98 | $25.47 | PA20260070 |
| POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE* *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $36.87 | $21.32 | PA20260070 |
| POWER EQUIPMENT OPERATORROLLER, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $32.25 | $21.32 | PA20260070 |
| POWER EQUIPMENT OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE), BULLDOZER, DRILL RIG CAISSONS, FORKLIFT (LULL), MAN LIFT/OUTSIDE ELEVATOR | $36.87 | $21.32 | PA20260070 |
| POWER EQUIPMENT OPERATOROILER | $29.70 | $21.32 | PA20260070 |
| ROOFER, EXCLUDES INSTALLATION OF METAL ROOFS | $24.13 | $11.95 | PA20260070 |
| SHEET METAL WORKER(INCLUDES HVAC DUCT INSTALLATION, EXCLUDES METAL FLASHING INSTALLATION) | $39.50 | $30.79 | PA20260070 |
| SHEET METAL WORKER(METAL FLASHING INSTALLATION ONLY) | $31.43 | $20.05 | PA20260070 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $49.75 | $30.26 | PA20260070 |
| TILE FINISHER | $28.76 | $17.16 | PA20260070 |
| TILE SETTER | $35.64 | $21.63 | PA20260070 |
| TRUCK DRIVERDUMP TRUCK | $24.98 | $11.88 | PA20260070 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.