Heavy prevailing wage rates for Northumberland County, PA | PrevailWage
Heavy prevailing wage rates for Northumberland County, PA
LINE CONSTRUCTION leads the heavy schedule for Northumberland County, PA at $68.06 base plus $31.43 fringe. The active federal wage determinations covering heavy construction in Northumberland County, PA list 193 classifications with published rates, base pay from $8.69 to $68.06 per hour. The determination was last modified September 17, 2026.
The highest published base on this schedule belongs to LINE CONSTRUCTION at $68.06 per hour plus $31.43 fringe; the schedule's median base is $37.13.
The most recent modification to the governing determination is dated September 17, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
98% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
Using these rates
Read the modification number
A wage determination is cited as number plus modification, for example PA20260028 Mod dated September 17, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Put the WD in your bid file
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
Check rates the Friday before payroll
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
Match classifications by duties, not titles
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
Fringe crediting basics
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
Statement of Compliance wording
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Questions
Which wage determination applies to my project in Northumberland County?
The wage determination incorporated into your contract is the one that governs, per 29 CFR 1.6. For new heavy work in Northumberland County, PA, the current active determination is PA20260028. Verify with your contracting officer before bidding or paying.
How often do these rates change?
DOL publishes wage determination modifications weekly, generally on Fridays. The determination behind this page was last modified September 17, 2026.
What is the difference between the base rate and the fringe rate?
The base rate is the minimum hourly wage; the fringe amount is an additional hourly benefit obligation you can meet with bona fide benefit contributions or pay in cash. On this schedule the median fringe is about 64% of base.
My classification is not listed for Northumberland County. What do I do?
If the work classification you need is not on the determination, the contractor requests a conformance (additional classification and rate) through the contracting agency using Standard Form 1444. Do not substitute a similar-sounding classification.
What counts as heavy construction?
Heavy covers projects that are not building, residential, or highway, such as water and sewer lines, dams, and flood control. Agencies sometimes split it further; the contract states which schedule applies.
CARPENTER & SOFT FLOOR LAYER(COLUMBIA, SCHUYLKILL, AND LOWER PART OF LUZERNE COUNTY; IN CARBON COUNTY BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TOWNSHIPS AND THAT PART OF PENN FOREST TOWNSHIP, NORTH OF ROUTE 903)
CARPENTER & SOFT FLOOR LAYER(LUZERNE (EXCEPT BLACK CREEK, BUTLER, DENNISON, FOSTER, FREELAND, HANLE, HAZLETON, HOLLENBACK, NESPECK, THE LOWER PART OF SALEM, AND SUGARLOAF), SULLIVAN, RED ROCK AIR BASE), AND WYOMING (WEST OF THE SUSQUEHANNA RIVER) COUNTIES)
CEMENT MASON/CONCRETE FINISHER(BERKS (NORTHEASTERN PART LYING NORTH OF A LINE STARTING FROM THE SOUTHERN BOUNDARY LINE OF LEHIGH COUNTY CONTINUING THROUGH HUFFS CHURCH, FREDERICKSVILLE, DRYVILLE, LYON STATION, KUTZTOWN, KRUMSVILLE, AND STONEY RUN IN BERKS COUNTY TO THE LEHIGH COUNTY LINE), CARBON, LEHIGH, NORTHAMPTON (NORTHWEST PART INCLUDING THE TOWNS OF WALNUTPORT, BATH, AND NORTHAMPTON) COUNTIES)
CEMENT MASON/CONCRETE FINISHER(BERKS (NORTHEASTERN PART LYING NORTH OF A LINE STARTING FROM THE SOUTHERN BOUNDARY LINE OF LEHIGH COUNTY CONTINUING THROUGH HUFFS CHURCH, FREDERICKSVILLE, DRYVILLE, LYON STATION, KUTZTOWN, KRUMSVILLE, AND STONEY RUN IN BERKS COUNTY TO THE LEHIGH COUNTY LINE))
ELECTRICIAN(BRADFORD (AREA EAST OF THE SUSQUEHANNA RIVER); LACKAWANNA; LUZERNE (AREA EAST OF A LINE FOLLOWING THE SUSQUEHANNA RIVER SOUTH TO THE CITY OF PITTSON, EAST AND SOUTH ON THE LIMITS OF PITTSON BUT EXCLUDING IT, TO U.S. HIGHWAY 11, EAST ON 11 TO DUPONT BUROUGH AND HIGHWAY 215, AND SOUTHEAST ON 215. ALSO THE PORTION OF LUZERNE COUNTY SOUTH AND EAST OF A LINE FOLLOWING THORNHURST ROAD, SOUTHWEST TO STATE HIGHWAY 115 AND SOUTHEAST ON 115 TO MONROE COUNTY LINE); MONROE (BARRETT, COOLBAU
ELECTRICIAN(BERKS (BETHEL, MARION, AND TULPEHOCKEN TOWNSHIPS); CUMBERLAND; DAUPHIN; JUNIATA; LANCASTER (THAT PORTION NORTHWEST OF A LINE EXTENDING FROM THE SUSQUHANNA RIVER TO THE INTERSECTION OF STATE HIGHWAYS 441 AND 241 ALONG 241 TO THE BOROUGH OF ELIZABETHTOWN, AROUND THE LIMITS OF ELIZABETHTOWN ON THE WEST AND NORTH SIDE, INCLUDING THE MASONIC HOMES IN ELIZABETHTOWN, CONTINIUING ALONG STATE HIGHWAY 241 TO LEBANON COUNTY AND THAT PORTION NORTH OF THE PENNSYLVANIA TURNPIKE, INCLUDING ALL BUILDINGS ON TH
ELECTRICIAN(BRADFORD AND WYOMING (WEST OF THE SUSQUEHANNA RIVER) COLUMBIA COUNTY (BERWICK BOROUGH ONLY IN BRIAR CREEK TOWNSHIP),LACKAWANNA COUNTY: (THAT PORTION OF LEHIGH, WEST OF HIGHWAY 215 (DUPONT THORNHURST ROAD) AND NORTH OF THE THORNHURST STODDARTSVILLE ROAD; LUZERNE COUNTY: FAIRMONT, ROSS, LAKE, DALLA, NESCOPECK, DENISON, HOLLENBACH, BLACK CREEK, SUGARLOAF, HAZEL, BUTLER, FOSTER, FRANKLIN, EXETER, KINGSTON, JACKSON, LEHMAN, PLYMOUTH, HUNLOCK, UNION, HUNTINGTON, SALEM, CONYNGHAM, NEWPORT, SLOCUM, DOR
ELECTRICIAN(BERKS (HEREFORD, LONGSWAMP, AND WASHINGTON TOWNSHIPS; AND THE PORTION OF MAXATOWNEY TOWNSHIP EAST OF SACONY CREEK);(NORTHAMPTON (ALLEN, HANOVER, LEHIGH TOWNSHIPS BOROUGHS OF BATH, FREEMANSBURG, HELLERTOWN AND THE CITY OF BETHLEHEM, THE PORTION OF MOORE TOWNSHIP OF STATE HIGHWAY 946 AND WEST OF STATE HIGHWAY 987. CITY OF BETHLEHEM; THE PORTION OF MOORE TOWNSHIP SOUTH OF STATE HIGHWAY 946 AND WEST OF STATE HIGHWAY 987. EAST ALLEN TOWNSHIP EXCEPT THE PART NORTH OF BATH BOROUGH AND EAST OF STATE HI
ELECTRICIAN(COLUMBIA (EXCEPT BERWICK BOROUGH); MONTOUR; NORTHUMBERLAND (REMAINDER); SCHUYLKILL (REMAINDER); SNYDER (NORTH OF HWY 522); AND UNION (EAST BUFFALO, LEWISBURG, AND UNION TWPS.) COUNTIES)
ELECTRICIAN(SULLIVAN COUNTY (BRADFORD (ARMENIA AND CANTON TOWNSHIPS); AND SULLIVAN (THE PORTION WEST OF THE LINE DRAWN SOUTH OF U.S. HIGHWAY #220, FROM BRADFORD-SULLIVAN COUNTY LINE TO THE DUSHORE BOROUGH, THEN WEST, SOUTH AND EAST AROUND THE WESTERN LIMITS OF DUSHORE AND WEST AROUND THE EASTERN LIMITS OF LAPORTS BACK TO HIGHWAY #220; HENCE SOUTH ON HIGHWAY #220 TO NORDMONT-EMMANS ROAD, (MARKED ""55"" ON THE 1931 DEPARTMENT OF HIGHWAY MAY OF SULLIVAN COUNTY;) THEN IN A SOUTHERLY DIRECTION TO THE SULLIVAN-C
ELECTRICIAN(BRADFORD COUNTY (BRADFORD (ARMENIA AND CANTON TOWNSHIPS); AND SULLIVAN (THE PORTION WEST OF THE LINE DRAWN SOUTH OF U.S. HIGHWAY #220, FROM BRADFORD-SULLIVAN COUNTY LINE TO THE DUSHORE BOROUGH, THEN WEST, SOUTH AND EAST AROUND THE WESTERN LIMITS OF DUSHORE AND WEST AROUND THE EASTERN LIMITS OF LAPORTS BACK TO HIGHWAY #220; HENCE SOUTH ON HIGHWAY #220 TO NORDMONT-EMMANS ROAD, (MARKED ""55"" ON THE 1931 DEPARTMENT OF HIGHWAY MAY OF SULLIVAN COUNTY;) THEN IN A SOUTHERLY DIRECTION TO THE SULLIVAN-C
ELECTRICIAN(NORTHUMBERLAND (DELAWARE, LEWIS, AND TURBOT TOWNSHIPS, AND THE BOROUGH OF MILTON) AND UNION (EXCEPT EAST BUFFALO AND UNION TOWNSHIPS AND LEWISBURG BOROUGH) COUNTIES)
LABORERGROUP 4 CAISSON-OPEN AIR BELOW 8 FEET, COFFERDAM OPEN AIR BELOW 8 FEET WHERE EXCAVATIONS FOR CIRCULAR CAISSONS AND COFFERDAMS 8 FT AND BELOW LEVEL OF NATURAL GRADE ADJACENT TO STARTING POINT, FORM SETTERS (ROAD) WAGON DRILL DIAMOND POINT DRILL, GUNITE NOZZLE OPERATORS, CONCRETE RUBBERS, BLASTER
LABORERGROUP 5 FORM SETTER, REINFORCED STEEL PLACER, BONDING ALIGNING AND SECURING AND BURNING AND WELDING IN CONJUNCTION WTH REBAR, AND CONCRETE SURFACER.
LABORERGROUP 8 MINERS, DRILLERS, BLASTERS, PNEUMATIC SHIELD OPERATORS, LINING, SPOTTING AND TIMBER WORKMEN, REBAR STEEL PLACER, BONDING AND SECURING, WELDERS, AND CONCRETE SURFACERS (FREE AIR TUNNELS AND ROCK SHAFTS)
LABORERHEAVY CONSTRUCTION: GROUP 5 FORM SETTER, REINFORCED STEEL PLACER, BONDING ALIGNING AND SECURING AND BURNING AND WELDING IN CONJUNCTION WTH REBAR, AND CONCRETE SURFACER.
LABORERHEAVY CONSTRUCTION: GROUP 8 MINERS, DRILLERS, BLASTERS, PNEUMATIC SHIELD OPERATORS, LINING, SPOTTING AND TIMBER WORKMEN, REBAR STEEL PLACER, BONDING AND SECURING, WELDERS, AND CONCRETE SURFACERS (FREE AIR TUNNELS AND ROCK SHAFTS)
LABORERHEAVY CONSTRUCTION: GROUP 4 CAISSON-OPEN AIR BELOW 8 FEET, COFFERDAM OPEN AIR BELOW 8 FEET WHERE EXCAVATIONS FOR CIRCULAR CAISSONS AND COFFERDAMS 8 FT AND BELOW LEVEL OF NATURAL GRADE ADJACENT TO STARTING POINT, FORM SETTERS (ROAD) WAGON DRILL DIAMOND POINT DRILL, GUNITE NOZZLE OPERATORS, WALK BEHIND ROLLERS AND CONCRETE RUBBERS, BLASTER
MILLWRIGHT(CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMENSING, PENN FOREST. EVERYTHING SOUTH OF ROUTE 903 AND EAST TO THE KIDDER TOWNSHIP LINE. BOROUGHS: HAUTO, NESQUEHONING, LANSFORD, SUMMIT HILL, JIM THORPE, WEISSPORT, BOWNMANSTOWN, PALMERTON, LEHIGHTON, AND PARRYVILLE) , LEHIGH AND NORTHAMPTON COUNTIES)
MILLWRIGHT(CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMENSING, PENN FOREST. EVERYTHING SOUTH OF ROUTE 903 AND EAST TO THE KIDDER TOWNSHIP LINE. BOROUGHS: HAUTO, NESQUEHONING, LANSFORD, SUMMIT HILL, JIM THORPE, WEISSPORT, BOWNMANSTOWN, PALMERTON, LEHIGHTON, AND PARRYVILLE) , LEHIGH AND NORTHAMPTON COUNTIES)
MILLWRIGHT(ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND PART OF PENN FOREST TOWNSHIP NORTH OF ROUTE 903), COLUMBIA, CUMBERLAND, DAUPHIN, JUANIATA, LACKAWANNA, LANCASTER, LEBANON, LUZERNE (LOWER PART OF), LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY,PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG STATE AIRPORT) COUNTIES)
MILLWRIGHT(ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND PART OF PENN FOREST TOWNSHIP NORTH OF ROUTE 903) COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LUZERNE (LOWER PART OF) MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG STATE AIRPORT) COUNTIES)
PLUMBER AND STEAMFITTER(COLUMBIA (REMAINDER OF COUNTY), CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON (WEST OF ROUTE 501), MONTOUR, NORTHUMBERLAND, PERRY, SNYDER, YORK, BRADFORD COUNTY (WESTERN HALF), SULLIVAN, TIOGA AND UNION COUNTIES)
POWER EQUIPMENT OPERATORHIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 4 FIREMAN AND GREASE TRUCK BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICAT
POWER EQUIPMENT OPERATORHIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 5 OILERS AND DECK HANDS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATION
POWER EQUIPMENT OPERATORHIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 6A ALL MACHINES WITH BOOMS (INCLUDING JIBS, MASTS, LEADS, ETC.) 100 FEET 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES
POWER EQUIPMENT OPERATORHIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1 PILE DRIVERS, ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, PAVER (BLACKTOP AND CONCRETE), GRADALLS, ALL FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPES BACKHOES, BOAT CAPTAINS, BATCH PLANT WITH MIXER, DRILL SELF CONTAINED (DRILL-MASTER TYPE), CMI AUTOGRADE, MILLING MACHINE, VEMEER SAW, CONVEYOR LOADER (EUCLID TYPE) SCRAPER AND TOURN
POWER EQUIPMENT OPERATORHIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 2 SPREADERS, ASPHALT PLANT ENGINEERS, ROLLERS (HIGH GRADE FINISHING), MACHINE SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT, AND FORKLIFTS 20FT AND OVER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER
POWER EQUIPMENT OPERATORHIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 3 WELDING MACHINE, WELL POINTS, COMPRESSORS, PUMP HEATERS, FARM TRACTORS, FORM LINE GRADERS, DITCH WITCH TYPE TRENCHER, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, MISCELLANEOUS EQUIPMENT OPERATOR, SEAMAN PULVERIZING MIXER, POWER BROOM, SEEDING SPREADER, TIREMAN - (FOR POWER EQUIPMENT ) CONVEYORS, LOADERS OTHER THAN EUC TYPE, CONVEYORS, DRILLER SECOND CLASS, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE
POWER EQUIPMENT OPERATORHIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; SINGLE PERSON OPERATION TRUCK CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT D
POWER EQUIPMENT OPERATORHIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 6 ALL MACHINES WITH BOOMS (INCLUDING JIBS, MASTS, LEADS, ETC.) L00 FT. AND OVER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOV
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 2 ALL TYPES OF CRANES (EXCEPT CRANES DOING HOOK WORK) BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, HOIST WITH TWO TOWERS, PAVERS 21E AND OVER, OVERHEAD CRANES, BUILDING HOISTS (DOUBLE DRUM) GRADALLS, MUCKING MACHINES IN TUNNELS, FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPE BACKHOES, BOAT CAPTAINS, BATCH PLANT OPERATORS CONCRETE DRILLS, SELF-CONTAINED ROTARY DRILLS, FORK LIFTS, 20FT, LIFT AND OVER, SCRAPERS, TOUR
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 6 OILERS AND DECK HANDS (PERSONNEL BOATS) (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 5 FIREMAN (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 4 WELDING MACHINES, WELL POINTS, COMPRESSORS, PUMPS, HEATERS, FARM TRACTORS, FORM LINE GRADERS, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, SEAMAN PULVERZING MIXER, POWER BOOM, SEEDING SPREADER, TIREMAN (FOR POWER EQUIPMENT), GROUT PUMP 4"" AND UP, POWER BROOM, POWER SWEEPER, SEEDING SPREADER (SELF-PROPELLED) MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, CORE DRILL OPERATORS, FORKLIFT TRUCKS UNDER 20FT. LIFT, FINE GRADE MACHINES, DIRECTIONAL DRILL MACHINE 7"" OR LESS, HYDRAULIC PIPE PUSHER 7"" OR LESS, SKID-STEER FORKLIFT, MACHINES WITH CONCRETE MIXER ATTACHMENT, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT, MISCELLANEOUS EQUIPMENT OPERATOR. (LACKAWANNA, LUZER
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; EQUIPMENT 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS 97 FEET OR BOOM LENGTH OR LESS (150 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 1 MACHINES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, CABLE SPINNING MACHINES, HELICOPTERS, LULLTYPE FORKLIFT WITH BOOM ATTACHMENT, CONCRETE BOOM. TRUCK, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY.
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLEWAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WIINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, CORE DRILL OPERATORS, FORKLIFT TRUCKS UNDER 20FT. LIFT, FINE GRADE MACHINES, MACHINES SIMILAR TO THE ABOVE. (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOT
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 1 MACHINES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, CABLE SPINNING MACHINES, HELICOPTERS, MACHINES SIMILAR TO THE ABOVE, ALL TYPES OF CRANES, CABLEWAYS, AND DRAGLINES. (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLEWAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON,
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; EQUIPMENT 15 AND OVER FACTORY RATING; CONCRETE PUMPS 92 FEET OF BOOM LENGTH OR LESS (150 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL,
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 6 OILERS AND DECK HANDS (PERSONNEL BOATS) (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZ
POWER EQUIPMENT OPERATORBUILDING CONSTRUCTION: GROUP 5 FIREMAN. (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20%
POWER EQUIPMENT OPERATORHEAVY CONSTRUCTION: GROUP 5 FIREMAN. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2
POWER EQUIPMENT OPERATORHEAVY CONSTRUCTION: GROUP 6 OILERS AND DECK HANDS (PERSONNEL BOATS). FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS
POWER EQUIPMENT OPERATORHEAVY CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLE WAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE
POWER EQUIPMENT OPERATORHEAVY CONSTRUCTION: GROUP 1 MACHINES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, CABLE SPINNING MACHINES, HELICOPTERS, MACHINES SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT, ALL TYPES OF CRANES, CABLEWAYS, AND DRAGLINES. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEA
POWER EQUIPMENT OPERATORHEAVY CONSTRUCTION: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; EQUIPMENT 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE D
POWER EQUIPMENT OPERATORHEAVY CONSTRUCTION: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, DRILL OPERATORS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, SECOND CLASS DRILLER, FORKLIFT TRUCK UNDER 20FT. LIFT, STUMP GRINDER, TIREMAN (FOR POWER EQUIPMENT), MACHINES SIMILAR TO ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS TH
POWER EQUIPMENT OPERATORHEAVY CONSTRUCTION: GROUP 4 WELDING MACHINES, WELL POINTS, COMPRESSORS, PUMPS, HEATERS, FARM TRACTORS, FORM LINE GRADERS, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, SEAMAN PULVERZING MIXER, POWER BOOM, SEEDING SPREADER, CHIPPER WITHOUT BOOM, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND TH
ROOFER(BRADFORD, LACKAWANNA, LUZERNE (NORTH OF INTERSTATE 80 WITH THE EXCEPTION OF WHITE HAVEN TWP.) MONROE (TOBYHANNA ARMY DEPOT ONLY), PIKE, SULLIVAN, TIOGA, WAYNE, AND WYOMING COUNTIES)
SHEET METAL WORKER(ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES). FOOTNOTES: PAID HOLIDAY: ELECTION DAY
TRUCK DRIVERGROUP 1 FLAT BED TRUCK (SINGLE-AXLE), DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE), STAKE BODY TRCK (SINGLE AXLE), DUMPSTER (SINGLE AXLE) (BRADFORD AND TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE
TRUCK DRIVERGROUP 3 EUCLID-TYPE, OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS), STRADDLE TRUCKS, PUSHER, ARTICULATE DUMPED TRUCKS, LOW BOY TRAILERS, SEMI TRAILERS (BRADFORD AND TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE
TRUCK DRIVERGROUP 2 DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS, READY-MIX AND DUMPCRETE TYPE VEHICLES, ASPHALT DISTRIBUTORS (WHEN USED FOR TRANSPORTATION), STAKE BODY TRUCK (TANDEM) (BRADFORD AND TIOGA COUNTIES)
TRUCK DRIVERGROUP 3 EUCLID TYPE OFF-HIGHWAY EQUIPMENT - BACK OR BELLY DUMP TRUCKS AND DOUBLE-HITCHED EQUIPMENT, STRADDLE (ROSS) CARRIER, LOW-BED TRAILERS (BRADFORD AND TIOGA COUNTIES)
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.
Does the federal rate or the Pennsylvania state prevailing wage apply?
They are separate systems. Davis-Bacon rates apply to federally funded or assisted work; a state prevailing wage law can apply to state-funded work. A project can be covered by both, in which case the higher rate for each classification effectively controls. This page shows the federal determination only.
Is the WH-347 form mandatory?
The WH-347 itself is optional; what is mandatory on covered work is submitting weekly certified payroll with the same information and a signed Statement of Compliance. Most contractors use the WH-347 layout because agencies expect it.
· modified September 17, 2026
Synced from SAM.gov September 26, 2026. The wage determination incorporated into your contract is the legally operative document.