ELECTRICIAN leads the building schedule for Woods County, OK at $41.40 base plus $13.14 fringe. The active federal wage determination covering building construction in Woods County, OK lists 31 classifications with published rates, base pay from $10.17 to $41.40 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BOILERMAKER | $33.70 | $24.41 | OK20260066 |
| BRICKLAYER | $26.92 | $13.09 | OK20260066 |
| CARPENTER(DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $14.16 | $0.00 | OK20260066 |
| CARPENTER(FORM WORK ONLY) | $15.34 | $5.50 | OK20260066 |
Across the 31 published classifications for building work in Woods County, OK, base pay spans $10.17 to $41.40 per hour with a median of $19.34.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
This schedule mixes sources: 48% of lines carry union identifiers and the rest are survey-based. Two crews on one site can be governed by rates that update on entirely different rhythms.
A wage determination is cited as number plus modification, for example OK20260066 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $12.79 | $0.00 | OK20260066 |
| CEMENT MASON/CONCRETE FINISHER | $16.10 | $0.00 | OK20260066 |
| ELECTRICIAN | $41.40 | $13.14 | OK20260066 |
| ELECTRICIAN(LOW VOLTAGE WIRING AND ALARM INSTALLATION ONLY) | $24.26 | $9.76 | OK20260066 |
| IRONWORKER, STRUCTURAL | $32.10 | $17.38 | OK20260066 |
| LABORERPIPELAYER | $13.03 | $0.00 | OK20260066 |
| LABORERPLASTER TENDER | $10.17 | $0.00 | OK20260066 |
| LABORERCOMMON OR GENERAL | $11.00 | $0.00 | OK20260066 |
| LABORERMASON TENDER - BRICK | $11.88 | $0.00 | OK20260066 |
| LABORERMASON TENDER - CEMENT/CONCRETE | $13.04 | $0.00 | OK20260066 |
| OPERATORROLLER | $13.80 | $0.94 | OK20260066 |
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $19.34 | $0.74 | OK20260066 |
| PAINTERDRYWALL FINISHING/TAPING | $12.00 | $0.00 | OK20260066 |
| PAINTERBRUSH, ROLLER AND SPRAY | $12.18 | $0.00 | OK20260066 |
| PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $41.00 | $16.03 | OK20260066 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $19.00 | $0.00 | OK20260066 |
| PLASTERER | $33.62 | $14.18 | OK20260066 |
| PLUMBER(EXCLUDES HVAC PIPE INSTALLATION) | $41.00 | $16.03 | OK20260066 |
| POWER EQUIPMENT OPERATORGROUP 10 OILER | $27.25 | $19.05 | OK20260066 |
| POWER EQUIPMENT OPERATORGROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | OK20260066 |
| POWER EQUIPMENT OPERATORGROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | OK20260066 |
| POWER EQUIPMENT OPERATORGROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | OK20260066 |
| POWER EQUIPMENT OPERATORGROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | OK20260066 |
| POWER EQUIPMENT OPERATORGROUP 8 FORKLIFT | $28.77 | $19.05 | OK20260066 |
| ROOFER | $15.00 | $0.29 | OK20260066 |
| SHEET METAL WORKER(HVAC DUCT AND UNIT INSTALLATION ONLY) | $33.38 | $16.36 | OK20260066 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $16.32 | $0.00 | OK20260066 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.