DOL marked wage determination NY20260011 modified July 30, 2026 (revision 3). Verify against the source below before filing.
DOL modified the wage determination for heavy work in Niagara County, NY within the last 30 days. The active federal wage determinations covering heavy construction in Niagara County, NY list 80 classifications with published rates, base pay from $20.53 to $64.59 per hour. The determination was last modified July 30, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BOILERMAKER | $39.35 | $33.18 | NY20260011 |
| BRICKLAYER, STONEMASON | $37.44 | $32.71 | NY20260011 |
| CARPENTER | $41.19 | $29.81 | NY20260011 |
| CARPENTERPILEDRIVER | $41.19 | $31.55 | NY20260011 |
Across the 80 published classifications for heavy work in Niagara County, NY, base pay spans $20.53 to $64.59 per hour with a median of $38.55.
The governing determination was modified July 30, 2026, within the last 30 days. Contractors mid-bid in Niagara County should re-check figures against the determination text before submitting.
100% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example NY20260001 Mod dated July 30, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov August 1, 2026. The wage determination incorporated into your contract is the legally operative document.
| CEMENT FINISHER |
| $33.55 |
| $34.17 |
| NY20260011 |
| DREDGINGCLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $ | $48.48 | $15.34 | NY20260001 |
| DREDGINGCLASS B2: CERTIFIED WELDER. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DEC | $39.46 | $14.73 | NY20260001 |
| DREDGINGCLASS B1: DERRICK OPERATOR (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; | $41.93 | $14.90 | NY20260001 |
| DREDGINGCLASS A2: CRANE OPERATOR (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $ | $43.20 | $14.99 | NY20260001 |
| DREDGINGCLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICAT | $38.38 | $14.66 | NY20260001 |
| DREDGINGCLASS C2: BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG $1.55; DECKHA | $37.15 | $14.57 | NY20260001 |
| DREDGINGCLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLAS | $30.86 | $14.15 | NY20260001 |
| ELECTRICIAN LINE CONSTRUCTIONLIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY B | $42.29 | $30.66 | NY20260011 |
| ELECTRICIAN LINE CONSTRUCTIONLIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMP | $47.57 | $31.03 | NY20260011 |
| ELECTRICIAN LINE CONSTRUCTIONLIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY | $31.72 | $29.87 | NY20260011 |
| ELECTRICIAN LINE CONSTRUCTIONLIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFOR | $52.86 | $35.60 | NY20260011 |
| ELECTRICIAN LINE CONSTRUCTIONLIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY | $42.29 | $30.66 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONLINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Substation:) | $49.25 | $31.15 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONCABLE SPLICER (Substation:) | $63.14 | $33.82 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONCABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Substation:) | $35.34 | $30.12 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 | NY20260011 |
| ELECTRICIAN, LINE CONSTRUCTIONLINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 | NY20260011 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION ANDMAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITE | $61.56 | $36.21 | NY20260011 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATIONGROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $49.25 | $31.15 | NY20260011 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARYINSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRE | $49.25 | $31.15 | NY20260011 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTGROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $20.53 | $6.39 | NY20260011 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTINSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $38.73 | $6.93 | NY20260011 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTCABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.81 | $6.99 | NY20260011 |
| ELECTRICIANS | $44.20 | $32.90 | NY20260011 |
| GLAZIER | $34.68 | $27.64 | NY20260011 |
| IRONWORKER | $36.25 | $33.12 | NY20260011 |
| IRONWORKERS(SHEETER) | $36.25 | $33.12 | NY20260011 |
| LABORER COMPRESSED AIR GROUP 1 TOP LABORERS FOOTNOTEA. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.00 | $35.96 | NY20260011 |
| LABORER GROUP 1(HEAVY & HIGHWAY CLASSIFICATIONS) COMMON LABORERS, MULTI-TRADE TENDER, DECONTAMINATION OF ALL MACHINES, HORIZONTAL DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES WITH ATTACHMENTS/ALL WHEEL OR TRACK TYPES FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.00 | $35.96 | NY20260011 |
| LABORER GROUP 2(HEAVY & HIGHWAY CLASSIFICATIONS) POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS, JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW; POWDER MONKEY; BLACK TOP RAKERS; SCALERS; DRILL TENDERS; MORTAR MIXERS; CONCRETE POLISHING MACHINE; OPERATION & MAINTENANCE OF ALL ROBOTIC REMOTE SYSTEMS IN HAZARDOUS ENVIRONMENT; MEN WORKING FROM SWINGING SCAFFOLD BO'SNS CHAIR, SUSPENDED CAGE OR BUCKET; ALL OTHER OPERATORS OF MECHANICAL TOOLS, INCLUDING VIBRATORS REGARDLESS OF TYPE OF POWER AND BOAT MEN; OPERATION | $26.30 | $35.96 | NY20260011 |
| LABORER GROUP 3(HEAVY & HIGHWAY CLASSIFICATIONS) RESPIRATOR REQUIRED FOR BUSTING FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.50 | $35.96 | NY20260011 |
| LABORER GROUP 4(HEAVY & HIGHWAY CLASSIFICATIONS) FORM SETTER; ROAD FINISHER; GUNNITE NOZZLEMAN; SANDBLASTERS; BURNING TORCH; CONCRETE SAW OPERATORS; UTILITY PILE DRIVER; TREE TOPPER; GROUT MACHINE AND GROUT PUMP OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.60 | $35.96 | NY20260011 |
| LABORER GROUP 5(HEAVY & HIGHWAY CLASSIFICATIONS) LASER BEAM OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $26.85 | $35.96 | NY20260011 |
| LABORER GROUP 6(HEAVY & HIGHWAY CLASSIFICATIONS) WELDERS; WAGON DRILL & AIR TRACK DRILL; SELF CONTAINED DRILL; RESPIRATOR REQUIRED DUE TO ATMOSPHERIC CONDITIONS (EXCLUDING RESPIRATORS REQUIRED FOR HAZARDOUS WASTE & TOXIC MATERIALS, ASBESTOS ABATEMENT OR LEAD ABATEMENT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $27.00 | $35.96 | NY20260011 |
| LABORER GROUP 7(HEAVY & HIGHWAY CLASSIFICATIONS) CHEMICAL WASTE - MEN WORKING WITH HAZARDOUS WASTE & TOXIC MATERIALS OR IN AREAS OF RADIOACTIVE MATERIAL & ASBESTOS; THE REMOVAL OF ASBESTOS FROM ROOFS, CEILINGS, PIPES, WALLS, BOILERS ETC., AND ALL MACHINERY, & THE RECOVERING OF SAME; REMOVAL OF LEAD FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $28.00 | $35.96 | NY20260011 |
| LABORER GROUP 8(HEAVY & HIGHWAY CLASSIFICATIONS) GRADE CHECKER & BLASTER FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $28.60 | $35.96 | NY20260011 |
| LABORER GROUP 9(HEAVY & HIGHWAY CLASSIFICATIONS) SUPPLIED AIR RESPIRATORS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY | $31.00 | $35.96 | NY20260011 |
| MARBLE MASON | $36.85 | $30.80 | NY20260011 |
| PAINTERSHEAVY & HIGHWAY CONSTRUCTION: BRUSH & ROLLER (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | NY20260011 |
| PAINTERSHEAVY & HIGHWAY CONSTRUCTION: WALLCOVERING (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | NY20260011 |
| PAINTERSHEAVY & HIGHWAY CONSTRUCTION: DRYWALL/TAPING (TOWNSHIPS OF HARTLAND, LOCKPORT NORTH TONAWANDA, NEWFANE, PENDLETON, ROYALTON, SOMERSET AND THE EASTERN HALVES OF CAMBRIA AND WILSON) | $34.00 | $28.51 | NY20260011 |
| PAINTERSSPRAYING, PAPERHANGERS, SAND-BLASTING, SWINGING SCAFFOLD (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | NY20260011 |
| PAINTERSPAINTERS (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) | $33.00 | $28.21 | NY20260011 |
| PAINTERSTAPERS (TOWNSHIPS OF LEWISTON, NIAGARA FALLS, PORTER, WHEATFIELD AND THE WESTERN HALVES OF CAMBRIA AND WILSON) | $34.00 | $28.51 | NY20260011 |
| PLUMBER AND STEAMFITTER(ZONE 1)PLUMBER AND STEAMFITTER (ZONE 1) | $42.20 | $29.80 | NY20260011 |
| POINTER, CLEANER AND CAULKER | $36.82 | $31.33 | NY20260011 |
| POWER EQUIPMENT OPERATORGROUP A HEAVY AND HIGHWAY CONSTRUCTION NOTES: HAZARDOUS WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.50 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (2.00 OVER GROUP A)POWER EQUIPMENT OPERATOR: GROUP A HEAVY AND HIGHWAY CONSTRUCTION NOTES: HAZARDOUS WASTE 2.50 ZONE PAY: CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.00 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (1.50 OVER GROUP A) CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT (2.00 OVER GROUP A) | $47.39 | $34.84 | NY20260011 |
| POWER EQUIPMENT OPERATOR, TUNNEL AND SHAFT: GROUP A1 CRANE (UNDERGROUND), FRONT END LOADER (TUNNEL AND SHAFT), HOIST (2 OR 3 DRUM), MAINTENANCE ENGINEER (TUNNEL AND SHAFT), MINING MACHINE (MOLE AND SIMILAR TYPES), MOTOR MAN, MUCKING MACHINE, SHOVEL, TRIPPER/MAINTENANCE ENGINEER (TUNNEL AND SHAFT), TUNNEL SHOVEL NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 3POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP A1 CRANE (UNDERGROUND), FRONT END LOADER (TUNNEL AND SHAFT), HOIST (2 OR 3 DRUM), MAINTENANCE ENGINEER (TUNNEL AND SHAFT), MINING MACHINE (MOLE AND SIMILAR TYPES), MOTOR MAN, MUCKING MACHINE, SHOVEL, TRIPPER/MAINTENANCE ENGINEER (TUNNEL AND SHAFT), TUNNEL SHOVEL NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $39.29 | $28.10 | NY20260011 |
| POWER EQUIPMENT OPERATOR, TUNNEL AND SHAFT: GROUP A NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYPOWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP A NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $36.29 | $28.10 | NY20260011 |
| POWER EQUIPMENT OPERATOR, TUNNEL AND SHAFT: GROUP B AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE (TOPSIDE), BORING MACHINE, COMPRESSORS (4 OR LESS, EXCEEDING 2,000 C.F.M. COMBINED CAPACITY, BUT NOT TO EXCEED 5,000 C.F.M. WITH A DISTANCE NOT TO EXCEED 1,500 FEET), CONCRETE PUMP, CRANE (TOPSIDE, FRONT END LOADER (TOPSIDE), GRAYCO EPOXY MACHINE, HOIST (2 OR 3 DRUM -- TOPSIDE), MAINTENANCE ENGINEER (TOPSIDE), MAINTENANCE GREASE MAN, PERSONNEL HOIST, PUMP CRETE, SHOTCRETE MACHINE, SHOVEL (TOPSIDE) NOTES: HAZMAT PREMIUM 3.0POWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP B AUTOMATED CENTRAL MIX CONCRETE PLANT, BACKHOE (TOPSIDE), BORING MACHINE, COMPRESSORS (4 OR LESS, EXCEEDING 2,000 C.F.M. COMBINED CAPACITY, BUT NOT TO EXCEED 5,000 C.F.M. WITH A DISTANCE NOT TO EXCEED 1,500 FEET), CONCRETE PUMP, CRANE (TOPSIDE, FRONT END LOADER (TOPSIDE), GRAYCO EPOXY MACHINE, HOIST (2 OR 3 DRUM -- TOPSIDE), MAINTENANCE ENGINEER (TOPSIDE), MAINTENANCE GREASE MAN, PERSONNEL HOIST, PUMP CRETE, SHOTCRETE MACHINE, SHOVEL (TOPSIDE) NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $34.58 | $28.10 | NY20260011 |
| POWER EQUIPMENT OPERATOR, TUNNEL AND SHAFT: GROUP C COMRPESSORS (4 NOT TO EXCEED 2,000 C.F.M. COMBINED CAPACITY OR 3 OR LESS WITH MORE THAN 1,200 C.F.M. BUT NOT TO EXCEED 2,000 C.F.M. WITH A DISTANCE FOR COMPRESSORS), DUST COLLECTORS, GENERATORS, PUMPS, WELDING MACHINES (4 OF ANY TYPE OR COMBINATION) WITH A DISTANCE NOT TO EXCEED 1,500 FEET; CONVEYOR, ELECTRIC PUMP USED INCONJUNCTION WITH WELL POINT SYSTEM GROUT PUMP OVER 5 CUBIC FEET (MANUFACTURER'S RATING), HYDRO-BLASTER, MOTORIZED FORM CARRIER, TRUCK CRANE OILER, WEPOWER EQUIPMENT OPERATOR:, TUNNEL AND SHAFT: GROUP C COMRPESSORS (4 NOT TO EXCEED 2,000 C.F.M. COMBINED CAPACITY OR 3 OR LESS WITH MORE THAN 1,200 C.F.M. BUT NOT TO EXCEED 2,000 C.F.M. WITH A DISTANCE FOR COMPRESSORS), DUST COLLECTORS, GENERATORS, PUMPS, WELDING MACHINES (4 OF ANY TYPE OR COMBINATION) WITH A DISTANCE NOT TO EXCEED 1,500 FEET; CONVEYOR, ELECTRIC PUMP USED INCONJUNCTION WITH WELL POINT SYSTEM GROUT PUMP OVER 5 CUBIC FEET (MANUFACTURER'S RATING), HYDRO-BLASTER, MOTORIZED FORM CARRIER, TRUCK CRANE OILER, WELL POINT NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | $28.53 | $28.10 | NY20260011 |
| POWER EQUIPMENT OPERATORTUNNEL AND SHAFT: MASTER MECHANIC NOTES: HAZMAT PREMIUM $3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TUNNEL AND SHAFT CLASSIFICATIONSPOWER EQUIPMENT OPERATOR: TUNNEL AND SHAFT: MASTER MECHANIC NOTES: HAZMAT PREMIUM $3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TUNNEL AND SHAFT CLASSIFICATIONS | $38.06 | $28.10 | NY20260011 |
| POWER EQUIPMENT OPERATOR GROUP A1(HEAVY AND HIGHWAY CONSTRUCTION) BACKFILLERS, BACKHOES, AUTOMATIC BATCH PLANT OPERATOR, BLACK-TOP SPREADERS, BULLDOZERS, CMI GRADING MACHINES, CABLEWAYS, CLAMBUCKETS, COMBINATION HOE BOOM OR SHOVEL BOOMATTACHED (EXCEPT FARM TYPE CRAWLER OR RUBBER TIRED TRACTOR UNLESS USED WITH HYDRAULIC BACK-HOE), COMPRESSOR (WITH PAING BREAKER ATTACHED), CONCRETE MIXERS (ONE YARD AND OVER), CONCRETE PLANNER, CONCRETE PUMP (TRUCK MOUNTED), CONCRETE SPREADER OPERATOR, CRANE WORK, CRANES (OVERHEAD OR BRIDGE), CRANPOWER EQUIPMENT OPERATOR GROUP A1 (HEAVY AND HIGHWAY CONSTRUCTION) BACKFILLERS, BACKHOES, AUTOMATIC BATCH PLANT OPERATOR, BLACK-TOP SPREADERS, BULLDOZERS, CMI GRADING MACHINES, CABLEWAYS, CLAMBUCKETS, COMBINATION HOE BOOM OR SHOVEL BOOMATTACHED (EXCEPT FARM TYPE CRAWLER OR RUBBER TIRED TRACTOR UNLESS USED WITH HYDRAULIC BACK-HOE), COMPRESSOR (WITH PAING BREAKER ATTACHED), CONCRETE MIXERS (ONE YARD AND OVER), CONCRETE PLANNER, CONCRETE PUMP (TRUCK MOUNTED), CONCRETE SPREADER OPERATOR, CRANE WORK, CRANES (OVERHEAD OR BRIDGE), CRANE OPERATOR (OVER 100, 200, 300 FEET BOOMS EARN PREMIUMS AS NOTED HEREIN), DERRICKS, DRAGLINES, EUCLID TYPE BELT LOADERS, FINISHING MACHINE OPERATORS, FORK-LIFTS AND HOISTS 9 WHEN LIFTING MATERIAL AT AN ELEVATION HIGHER THAN TWENTY-FIVE FEET), FORM PULLER, GENERATOR AND COMPRESSOR (POWER DRIVEN-WHEN USED SIMULTANEOUSLY AND FOR ANY MAKE OF PORTABLE CONCRETE BATCHING MACHINE), GRADERS, GRADERS (WITH BULLDOZER BLADES), HOISTS (MULTIPLE DRUM WITH AIR COMPRESOR WHEN U | $47.39 | $34.84 | NY20260011 |
| POWER EQUIPMENT OPERATOR GROUP B(HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESORS (OVER 165 CU. FT), BOBCAT TYPE SKID LOADER, COMPRESSORS WHEN USED IN BANKS OF TWO AND NOT OVER THREE WITHIN A FIFTY FOOT RADIUS AND IF FUEL IS STORED, IT WOULD BE STORED WITHIN THE SAME RADIUS, CONCRETE BLOWERS, CONCRETE PUMPS, CONVEYORS, CRAWLER OR RUBBER TIRE TRACTOR (SMALL FARM TYPEWITH BLADE OR BUCKET NOT TO EXCEED 0.5 YD CAPACITY), EARTH DRILLS (ALL), ELEVATORS (ALL), FORKLIFT WHILE USED TO LIFT MATERIAL NOT OVER 25 FT, GUNNITE MACHINES, HEATEPOWER EQUIPMENT OPERATOR GROUP B (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESORS (OVER 165 CU. FT), BOBCAT TYPE SKID LOADER, COMPRESSORS WHEN USED IN BANKS OF TWO AND NOT OVER THREE WITHIN A FIFTY FOOT RADIUS AND IF FUEL IS STORED, IT WOULD BE STORED WITHIN THE SAME RADIUS, CONCRETE BLOWERS, CONCRETE PUMPS, CONVEYORS, CRAWLER OR RUBBER TIRE TRACTOR (SMALL FARM TYPEWITH BLADE OR BUCKET NOT TO EXCEED 0.5 YD CAPACITY), EARTH DRILLS (ALL), ELEVATORS (ALL), FORKLIFT WHILE USED TO LIFT MATERIAL NOT OVER 25 FT, GUNNITE MACHINES, HEATERS (GASOLINE -USE IN BANKS OF TWO AND NOT OVER THREE WITHIN AN AREA OF ONE HUDNRED FOOT RADIUS, HIGHLIFT HOISTS WHILE USED TO LIFT MATERIAL NOT OVER 25 FT, MATERIAL HOISTS, SINGLE DRUM HOIST FOR HOISTING MATERIALS OTHER THAN STEEL, LATOURNEAU TURNATRAILERS, LIGHT AND POWER SYSTEMS 9 GAS OR DIESEL DRIVEN - TEMPORARY 25 KW CAPACITY OR OVER), LOADERS 9 SMALL FRONT OR BACK), LOCOMOTIVE, PARTS ROOM - WHEN A PARTS ROOM IS MANNED IT SHALL BE AN ENGINEER, PAVEMENT BUSTER | $42.89 | $34.84 | NY20260011 |
| POWER EQUIPMENT OPERATOR MASTER MECHANIC(HEAVY AND HIGHWAY CONSTRUCTION) NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TUNNEL AND SHAFT CLASSIFICATIONSPOWER EQUIPMENT OPERATOR MASTER MECHANIC (HEAVY AND HIGHWAY CONSTRUCTION) NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 TO GROUP A- LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY PROVIDED EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. TUNNEL AND SHAFT CLASSIFICATIONS | $48.46 | $34.84 | NY20260011 |
| ROOFERSCOMPOSITION | $34.96 | $26.03 | NY20260011 |
| ROOFERSSLATE & TILE | $35.11 | $26.03 | NY20260011 |
| SHEET METAL WORKER | $39.50 | $29.18 | NY20260011 |
| SPRINKLER FITTER | $47.85 | $28.94 | NY20260011 |
| TILE, MARBLE & TERRAZZO FINISHER | $34.71 | $17.54 | NY20260011 |
| TILE & TERRAZZO WORKER | $37.85 | $31.80 | NY20260011 |
| TRUCK DRIVERSINCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS (HEAVY & HIGHWAY) WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR. FOOTNOTE: A. PENSION $54.00 PER DAY B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY | $49.23 | $8.75 | NY20260011 |
| TRUCK DRIVERSDUMP TRUCK ONLY, EXCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND AFTER THE HOLIDAY | $32.00 | $0.00 | NY20260011 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.