POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY leads the building schedule for New York County, NY at $117.60 base plus $38.95 fringe. The active federal wage determination covering building construction in New York County, NY lists 118 classifications with published rates, base pay from $29.29 to $117.60 per hour. The determination was last modified August 13, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | NY20260003 |
| BOILERMAKER FOOTNOTEA. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE | $68.88 | $49.83 | NY20260003 |
| BRICKLAYER | $67.39 | $35.90 | NY20260003 |
Across the 118 published classifications for building work in New York County, NY, base pay spans $29.29 to $117.60 per hour with a median of $59.05.
The most recent modification to the governing determination is dated August 13, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
100% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example NY20260003 Mod dated August 13, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov August 15, 2026. The wage determination incorporated into your contract is the legally operative document.
| BRICKLAYER(MARBLE POLISHERS) |
| $52.32 |
| $36.25 |
| NY20260003 |
| CARPENTERHEAVY & HIGHWAY (RICHMOND COUNTY) | $61.59 | $55.84 | NY20260003 |
| CARPENTERHEAVY & HIGHWAY (QUEENS COUNTY) | $61.59 | $55.84 | NY20260003 |
| CARPENTERHEAVY & HIGHWAY (BRONX AND NEW YORK COUNTIES) | $61.59 | $55.84 | NY20260003 |
| CARPENTERHEAVY & HIGHWAY (KINGS COUNTY) | $61.59 | $55.84 | NY20260003 |
| CARPENTER, BUILDING & RESIDENTIAL(RICHMOND COUNTY) | $59.05 | $48.08 | NY20260003 |
| CARPENTER, BUILDING & RESIDENTIAL(QUEENS COUNTY) | $59.05 | $48.08 | NY20260003 |
| CARPENTER, BUILDING & RESIDENTIAL(BRONX AND NEW YORK COUNTIES) | $59.05 | $48.08 | NY20260003 |
| CARPENTER, BUILDING & RESIDENTIAL(KINGS COUNTY) | $59.05 | $48.08 | NY20260003 |
| CARPENTERS(TIMBERMEN) | $55.59 | $55.41 | NY20260003 |
| CARPENTERS(SOFT FLOOR LAYERS) | $59.05 | $48.08 | NY20260003 |
| CEMENT MASON/CONCRETE FINISHER | $59.87 | $41.81 | NY20260003 |
| DIVER | $75.46 | $55.84 | NY20260003 |
| DIVER TENDER | $55.00 | $55.84 | NY20260003 |
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | NY20260003 |
| ELECTRICIAN(JOBBING, AND MAINTENANCE AND REPAIR WORK) PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $32.00 | $27.16 | NY20260003 |
| ELECTRICIAN PAID HOLIDAYSA. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $62.00 | $65.81 | NY20260003 |
| ELEVATOR MECHANIC(MODERNIZATION AND REPAIR) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURL | $59.09 | $45.56 | NY20260003 |
| ELEVATOR MECHANIC(ELEVATOR CONSTRUCTOR) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RA | $75.14 | $47.45 | NY20260003 |
| GLAZIER | $49.20 | $57.20 | NY20260003 |
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | NY20260003 |
| IRONWORKER(METALLIC LATHERS AND REINFORCING IRONWORKERS) | $57.00 | $32.96 | NY20260003 |
| IRONWORKER(STONE DERRICKMAN) | $60.40 | $60.14 | NY20260003 |
| IRONWORKERORNAMENTAL | $48.15 | $67.62 | NY20260003 |
| LABORER(CEMENT AND CONCRETE WORKERS) | $49.28 | $27.05 | NY20260003 |
| LABORER, BUILDING CONSTRUCTIONDEMOLITION LABORERS (INTERIOR) (Tier B- RESPONSIBLE FOR SHOVELING OF DEBRIS INTO CONTAINER, PUSHING CONTAINERS FROM THE INSIDE TO THE OUTSIDE OF THE BUILDING) | $29.29 | $20.29 | NY20260003 |
| LABORER, BUILDING CONSTRUCTIONDEMOLITION LABORERS (INTERIOR) (Tier A- RESPONSIBLE FOR THE REMOVAL OF ALL INTERIOR PETITIONS AND STRUCTURAL PETITIONS THAT CAN CONSIST OF SHEET ROCK, BLOCK OR MASONRY. ALSO AL STRUCTURAL SLAB OPENINGS AND EXTERIOR WALLS WHERE THE BUILDING IS NOT BEING COMPLETELY DEMOLITIONED) | $40.22 | $25.17 | NY20260003 |
| LABORER, BUILDING CONSTRUCTIONMASON TENDER/GENERAL LABORER | $44.70 | $29.55 | NY20260003 |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION LABORER(ASBESTOS, LEAD, HAZARDOUS WASTE REMOVAL (INCLUDING SOIL)/CEMENT/CONCRETE | $44.50 | $52.08 | NY20260003 |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION UTILITY LABORER PAID HOLIDAYSLABOR DAY AND THANKSGIVING DAY | $44.35 | $52.08 | NY20260003 |
| LABORERSASBESTOS (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION) | $41.15 | $20.90 | NY20260003 |
| LABORERSFREE AIR & TUNNEL MAINTENANCE MEN, INSIDE MUCK LOCK TENDERS, PUMP MEN, ELECTRICIANS, CEMENT FINISHERS, CAULKERS, HYDRAULIC MEN, SHIELD MEN, MONORAIL OPERATORS, MOTOR MEN, CONVEYOR MEN, POWDER CARRIERS, PAN MEN, RIGGERS, CHUCK TENDERS, TRACK MEN PAINTERS, NIPPERS, BRAKEMEN, CABLE MEN, HOSE MEN, GROUT MEN, GRAVEL MEN, FORM WORKERS, CONCRETE WORKERS, TUNNEL LABORERS, MOLE NIPPER (ONE (1) MOLE SIPPER PER WORKING SHAFT PER SHIFT FOR UP TO AND INCLUDING TWO (2) MOLES | $64.08 | $54.00 | NY20260003 |
| LABORERS, HEAVY (JACKHAMMERS, CHIPPERS, SPADERS, CONCRETE BREAKERS, ALL OTHER PNEUMATIC TOOLS, WALK BEHIND SELF-PROPELLED HYDRAULIC ASPHALT AND CONCRETE BREAKER) | $44.50 | $52.08 | NY20260003 |
| LABORERSHEAVY (HYDRAULIC TRAC DRILL) | $51.85 | $52.08 | NY20260003 |
| LABORERSHEAVY (BLASTERS (HYDRAULIC TRAC DRILL)) | $51.85 | $52.08 | NY20260003 |
| LABORERSHEAVY (BLASTERS) | $57.71 | $52.08 | NY20260003 |
| LABORERSHEAVY (POWDER CARRIERS) | $44.50 | $52.08 | NY20260003 |
| LABORERSSMALL EQUIPMENT OPERATOR (NOT OPERATING ENGINEER) (HIGHWAY CONSTRUCTION) FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS | $46.33 | $54.04 | NY20260003 |
| LABORERSSLURRY/SEALCOATER/PLAY EQUIPMENT INSTALLER (HIGHWAY CONSTRUCTION) FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS | $46.33 | $54.04 | NY20260003 |
| LABORERSMAINTENANCE SAFETY SURFACE (HIGHWAY CONSTRUCTION) FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS | $46.33 | $54.04 | NY20260003 |
| LABORERSLANDSCAPE PLANTING & MAINTENANCE (HIGHWAY CONSTRUCTION) FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS | $46.33 | $54.04 | NY20260003 |
| LABORERSLABORERS (HIGHWAY CONSTRUCTION) FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS | $46.33 | $54.04 | NY20260003 |
| LABORERSFORMSETTERS (HIGHWAY CONSTRUCTION) FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS | $50.80 | $54.04 | NY20260003 |
| LABORERSFENCE INSTALLER & REPAIRER (HIGHWAY CONSTRUCTION) FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS | $46.33 | $54.04 | NY20260003 |
| LABORERSSMALL POWER TOOLS OPERATOR (HIGHWAY CONSTRUCTION) FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS | $46.33 | $54.04 | NY20260003 |
| LABORERS-ASPHALT CONSTRUCTION(SHOVELER (PRODUCTION PAVING ONLY)) | $46.33 | $54.05 | NY20260003 |
| LABORERS-ASPHALT CONSTRUCTION(SCREEDPERSON) | $50.80 | $54.05 | NY20260003 |
| LABORERS-ASPHALT CONSTRUCTION(RAKER) | $50.20 | $54.05 | NY20260003 |
| LABORERS-ASPHALT CONSTRUCTION(MICRO PAVER) | $50.80 | $54.05 | NY20260003 |
| LABORERS-ASPHALT CONSTRUCTION(SMALL EQUIPMENT OPERATOR (ASPHALT)) | $46.33 | $54.05 | NY20260003 |
| LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLEINSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT: LINEMAN AND CABLE SPLICER (QUEENS COUNTY) | $70.57 | $39.19 | NY20260003 |
| LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLEINSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT: GROUNDMAN (QUEENS COUNTY) | $42.34 | $30.05 | NY20260003 |
| LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLEINSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT: HEAVY EQUIPMENT OPERATOR (QUEENS COUNTY) | $56.46 | $34.63 | NY20260003 |
| MARBLE FINISHER | $49.99 | $37.54 | NY20260003 |
| MARBLE MASON | $63.92 | $40.20 | NY20260003 |
| MASON - STONE | $69.91 | $44.02 | NY20260003 |
| MILLWRIGHT | $60.83 | $58.03 | NY20260003 |
| PAINTER(PAINTERS, DRYWALL FINISHERS, LEAD ABATEMENT WORKER) | $44.75 | $44.11 | NY20260003 |
| PAINTER(SPRAY, SCAFFOLD AND SANDBLASTING) | $47.75 | $44.11 | NY20260003 |
| PAINTERS(STRUCTURAL STEEL AND BRIDGE) | $56.25 | $55.14 | NY20260003 |
| PAINTERS(DRYWALL TAPERS/POINTERS) | $48.47 | $35.91 | NY20260003 |
| PLASTERER | $48.51 | $32.78 | NY20260003 |
| PLASTERER(KINGS AND QUEENS COUNTIES) | $48.51 | $32.78 | NY20260003 |
| PLUMBERMECHANICAL EQUIPMENT AND SERVICE (ANY REPAIR AND/OR REPLACEMENT OF THE PRESENT PLUMBING SYSTEM THAT DOES NOT CHANGE THE EXISTING ROUGHING) | $48.90 | $22.26 | NY20260003 |
| PLUMBER | $73.00 | $32.81 | NY20260003 |
| PLUMBERSERVICE FITTERS (SERVICE FITTER WORK SHALL CONSIST OF ALL REPAIR, SERVICE AND MAINTENANCE WORK ON DOMESTIC, COMMERICAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS ETC., INCLUDING BUTNOT EXCLUSIVELY FOR CHARGING, EVACUATION, LEAK TESTING AND ASSEMBLING FOR ALL MACHINES FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND HEATING APPARATUS. ALSO, WORK SHALL INCLUDE ADJUSTING, INCLUDING CAPACITY ADJUSTM | $47.85 | $23.96 | NY20260003 |
| PLUMBERSPRINKLER FITTERS, STEAMFITTERS | $70.36 | $54.24 | NY20260003 |
| POINTER, CLEANER AND CAULKER | $63.69 | $32.42 | NY20260003 |
| POWER EQUIPMENT OPERATORUTILITY: UTILITY COMPRESSORS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $57.14 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATORUTILITY: HORIZONTAL BORING RIG FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $86.61 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATORUTILITY: OFF SHIFT COMPRESSORS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $71.98 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 1(BUILDING & RESIDENTIAL) DOUBLE DRUM FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $92.32 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 1(HEAVY AND HIGHWAY) CHERRYPICKERS 20 TONS AND OVER AND LOADERS (RUBBER-TIRED AND/OR TRACTOR TYPE WITH A MANFUFACTURER'S RATED CAPACITY OF SIX CUBIC YARDS AND OVER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PRO | $74.65 | $38.00 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 1(BUILDING) OILER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $65.94 | $32.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 2(BUILDING & RESIDENTIAL) STONE DERRICK, CRANES, HYDRAULIC CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $97.79 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 2(HEAVY AND HIGHWAY) RUBBER TIRE BACKHOES UP TO AND INCLUDING 37,000 LBS, BASIN MACHINES, GROOVER, MECHANICAL SWEEPERS, BOBCAT, BOOM TRUCK, BARRIER TRANSPORT (BARRIER MOVER) AND MACHINES OF A SIMILAR NATURE, BOAT CAPTAINS, BOAT OPERATORS, OPERATION OF CHURN DRILLS AND MACHINES OF A SIMILAR NATURE, STETCO SILENT HOIST AND MACHINES OF A SIMILAR NATURE, VAC-ALLS, MEYERS MACHINES, JOHN BEAM AND MACHINES OF A SIMILAR NATURE, ROSS CARRIERS AND TRAVEL LIFTS AND MACHINES OF A SIMILAR NATURE, BULLDOZERS, | $72.40 | $38.00 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 2(BUILDING) OILERS ON CRAWLER CRANES, BACKHOES, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $63.98 | $32.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 3(BUILDING & RESIDENTIAL) 4 POLE HOIST, SINGLE DRUM HOISTS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $79.70 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 3(HEAVY AND HIGHWAY) MINOR EQUIPMENT SUCH AS TRACTORS, POST HOLE DIGGERS AND DRIVERS, DITCH WITCH (WALK BEHIND), ROAD FINISHING MACHINES, ROLLERS (FIVE (5) TONS AND UNDER), TUGGER HOISTS, DUAL PURPOSE TRUCKS, FORK LIFTS AND DEMPSEY DUMPSTERS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETER | $68.62 | $38.00 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 3(BUILDING) GRADALLS: CONCRETE PUMPS, POWER HOUSES - ALL EQUIPMENT IN SAME IS MANNED BY TWO (2) MEN ONLY, DRIVING TRUCK CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $57.42 | $32.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 4(BUILDING & RESIDENTIAL) FORK LIFT, HOUSE CARS, PLASTER (PLATFORM MACHINE), PLASTER BUCKET, CONCRETE PUMP AND ALL OTHER EQUIPMENT USED FOR HOISTING MATERIAL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $72.46 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 4(HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) GRADALLS AND CONCRETE PUMPS OR SIMILARLY EQUIPMENT MANNED BY TWO-MEN PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRIST | $64.82 | $38.00 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 5(BUILDING & RESIDENTIAL) COMPRESSORS, WELDING MACHINES (CUTTING CONCRETE WORK), PAINT SPRAYING, SAND BLASTING, PUMPS (WITH THE EXCLUSION OF CONCRETE PUMPS), HOUSE CAR (SETTLEMENT BASIS ONLY), ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILIARY EQUIPMENT, AIR, HYDRAULIC, ETC., BOILERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED T | $54.12 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR GROUP 5(HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) SHOVELS, CRANES (DRAGLINES), BACKHOES, PAVERS, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMB | $44.45 | $38.00 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 13 VIBRATORY FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $81.97 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 12 CONCRETE BREAKING MACHINE, HOISTS (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $81.38 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 11 ELEVATORS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $79.62 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 10 CONCRETE MIXERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $85.21 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 8 MIXERS (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $91.04 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE (OTHER THAN ABOVE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $88.72 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE | $93.74 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 6 ALL DRILLS, AND MACHINES OF A SIMILAR NATURE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $92.01 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 5 PILEDRIVERS, DERRICK BOATS, TUNNEL SHOVELS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $95.83 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 4 GRADALLS, KEYSTONES, CRANES (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS D | $97.75 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $100.18 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 2 RUBBER TIRE BACKHOES OVER 37,000 LBS, TRACK BACKHOES, POWER SHOVEL, HYDRAULIC CLAM SHELLS, MOLES AND MACHINES OF A SIMILAR TYPE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $97.06 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 1 TOWER CRANE PREMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $117.60 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 15 BOILERS, (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; TH | $57.52 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAYGROUP 14 COMPRESSORS (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $61.87 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAYASPHALT PLANTS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $75.01 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAYASPHALT SPREADER | $91.04 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAYASPHALT ROLLER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $88.72 | $38.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTIONTHREE DRUM DERRICKS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $100.14 | $36.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTIONCOMPRESSORS, WELDING MACHINES | $56.34 | $36.95 | NY20260003 |
| POWER EQUIPMENT OPERATOR, STEEL ERECTIONCRANES, HYDRAULIC CRANES, 2 DRUM DERRICKS, FORKLIFTS, BOOM TRUCKS | $96.26 | $36.95 | NY20260003 |
| ROOFER | $50.25 | $32.62 | NY20260003 |
| SHEET METAL WORKER(BUILDING CONSTRUCTION) | $53.60 | $60.74 | NY20260003 |
| SHEET METAL WORKER(RESIDENTIAL CONSTRUCTION) | $35.79 | $25.37 | NY20260003 |
| TERRAZZO FINISHER | $49.59 | $34.25 | NY20260003 |
| TERRAZZO WORKER/SETTER | $64.62 | $37.63 | NY20260003 |
| TILE FINISHER | $49.59 | $34.25 | NY20260003 |
| TILE LAYER | $64.40 | $37.13 | NY20260003 |
| TRUCK DRIVERASPHALT FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK | $46.12 | $59.65 | NY20260003 |
| TRUCK DRIVERHIGH RISE FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK | $65.43 | $53.15 | NY20260003 |
| TRUCK DRIVER EUCLIDS & TURNAPULLS FOOTNOTESPAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK | $49.38 | $57.65 | NY20260003 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.