ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION leads the highway schedule for Roosevelt County, NM at $26.21 base plus $9.35 fringe. The active federal wage determination covering highway construction in Roosevelt County, NM lists 66 classifications with published rates, base pay from $10.62 to $26.21 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK(LEA) | $13.30 | $0.44 | NM20260036 |
| CARPENTER, INCLUDES FORM WORK(LUNA) | $13.11 | $0.44 | NM20260036 |
| CARPENTER, INCLUDES FORM WORK(CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $13.93 | $0.44 | NM20260036 |
| CEMENT MASON/CONCRETE FINISHER(LEA) |
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
With 66 classifications carrying published rates, this is a comparatively deep schedule; most trades a highway project needs appear without a conformance request.
Most rate lines here carry SU or state-adopted identifiers, meaning they come from wage surveys rather than negotiated agreements. Survey rates change less often but can jump when a new survey publishes.
A wage determination is cited as number plus modification, for example NM20260036 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Certified payroll uses the employee's name and an individually identifying number, normally the last four digits of the Social Security number. Full SSNs do not belong on submitted payrolls.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $13.74 |
| $0.68 |
| NM20260036 |
| CEMENT MASON/CONCRETE FINISHER(CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $14.17 | $0.55 | NM20260036 |
| ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION(LEA) | $24.90 | $8.56 | NM20260036 |
| ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION(CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $26.21 | $9.35 | NM20260036 |
| HIGHWAY/PARKING LOT STRIPINGINCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER | $15.93 | $0.35 | NM20260036 |
| INSTALLER(GUARDRAILS, HANDRAILS AND SIGNS) (LEA) | $14.62 | $0.30 | NM20260036 |
| INSTALLER(GUARDRAILS, HANDRAILS AND SIGNS) (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $13.58 | $0.35 | NM20260036 |
| IRONWORKER, REINFORCING(CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $21.66 | $6.03 | NM20260036 |
| IRONWORKER, REINFORCING(LEA) | $21.77 | $6.03 | NM20260036 |
| IRONWORKER, STRUCTURAL | $21.77 | $6.03 | NM20260036 |
| LABORER(POWER/AIR TOOL OPERATOR, INCLUDES JACK HAMMER) | $13.91 | $0.86 | NM20260036 |
| LABORER(ASPHALT RAKER) | $13.00 | $0.35 | NM20260036 |
| LABORER(PIPELAYER) | $19.28 | $0.00 | NM20260036 |
| LABORER(MASON TENDER-BRICK/CEMENT/CONCRETE) | $11.39 | $0.79 | NM20260036 |
| LABORER(GRADE CHECKER) | $16.18 | $1.60 | NM20260036 |
| LABORER(FLAGGER/CONE SETTER) | $12.56 | $0.35 | NM20260036 |
| LABORER, COMMON OR GENERAL(CATRON, CHAVES, CURRY, HIDALGO, LINCOLN, SIERRA, SOCORRO) | $11.67 | $0.35 | NM20260036 |
| LABORER, COMMON OR GENERAL(DEBACA) | $11.33 | $0.35 | NM20260036 |
| LABORER, COMMON OR GENERAL(EDDY) | $11.78 | $0.35 | NM20260036 |
| LABORER, COMMON OR GENERAL(GRANT) | $10.62 | $0.35 | NM20260036 |
| LABORER, COMMON OR GENERAL(LEA) | $11.61 | $0.35 | NM20260036 |
| LABORER, COMMON OR GENERAL(LUNA, ROOSEVELT) | $12.56 | $0.35 | NM20260036 |
| LABORER, COMMON OR GENERAL(OTERO) | $12.73 | $0.35 | NM20260036 |
| PAINTER(BRUSH, ROLLER, AND SPRAY) | $15.41 | $0.44 | NM20260036 |
| POWER EQUIPMENT OPERATOR(MILLING MACHINE) | $16.59 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATOR(ASPHALT/CONCRETE PAVER, LAYDOWN MACHINE, AND PLANT) | $15.42 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $19.92 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE (EDDY) | $14.87 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE (LEA) | $16.88 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORBOBCAT/SKID LOADER | $18.06 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATOR(BROOM) | $15.48 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORBULLDOZER | $16.25 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATOR(CRUSHER) | $16.53 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATOR(DISTRIBUTOR) | $14.50 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORFORKLIFT | $17.16 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORGRADER/BLADE | $18.02 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORLOADER (FRONT END) | $16.12 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORMECHANIC (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $19.44 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORMECHANIC (LEA) | $20.69 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATOROILER | $15.79 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATOR(PILEDRIVER) | $17.82 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (CATRON, CHAVES, CURRY, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $15.86 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (DEBACA) | $14.19 | $0.75 | NM20260036 |
| POWER EQUIPMENT OPERATORROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (LEA) | $17.41 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORSCRAPER | $15.91 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORSCREED | $15.70 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATORTRACTOR | $15.40 | $0.26 | NM20260036 |
| POWER EQUIPMENT OPERATOR(TRENCHER) | $16.31 | $0.26 | NM20260036 |
| TRUCK DRIVERDISTRIBUTOR (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LEA, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $13.81 | $0.26 | NM20260036 |
| TRUCK DRIVERDISTRIBUTOR (EDDY) | $13.70 | $0.26 | NM20260036 |
| TRUCK DRIVERDUMP TRUCK (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $14.60 | $0.26 | NM20260036 |
| TRUCK DRIVERDUMP TRUCK (LEA) | $14.61 | $0.26 | NM20260036 |
| TRUCK DRIVERFLATBED TRUCK (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, SIERRA, SOCORRO) | $12.96 | $0.26 | NM20260036 |
| TRUCK DRIVERFLATBED TRUCK (EDDY) | $12.71 | $0.26 | NM20260036 |
| TRUCK DRIVERFLATBED TRUCK (LEA) | $13.05 | $0.26 | NM20260036 |
| TRUCK DRIVERFLATBED TRUCK (ROOSEVELT) | $13.26 | $0.26 | NM20260036 |
| TRUCK DRIVERPICKUP AND PILOT CAR (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $12.70 | $0.26 | NM20260036 |
| TRUCK DRIVERPICKUP AND PILOT CAR (EDDY) | $12.60 | $0.26 | NM20260036 |
| TRUCK DRIVERPICKUP AND PILOT CAR (LEA) | $12.84 | $0.26 | NM20260036 |
| TRUCK DRIVER(SEMI-TRAILER TRUCK) | $16.58 | $0.26 | NM20260036 |
| TRUCK DRIVER(TRACTOR HAUL TRUCK) | $14.00 | $0.00 | NM20260036 |
| TRUCK DRIVERWATER TRUCK (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $14.39 | $0.26 | NM20260036 |
| TRUCK DRIVERWATER TRUCK (LEA) | $15.07 | $0.26 | NM20260036 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.