PIPEFITTER leads the building schedule for Mora County, NM at $43.07 base plus $16.60 fringe. The active federal wage determination covering building construction in Mora County, NM lists 43 classifications with published rates, base pay from $10.25 to $43.07 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ACOUSTICAL CEILING MECHANIC | $12.00 | $0.00 | NM20260031 |
| BOILERMAKER | $21.77 | $3.98 | NM20260031 |
| BRICKLAYER | $20.80 | $5.10 | NM20260031 |
| CARPENTERDRYWALL HANGING ONLY (QUAY) | $24.08 | $10.79 | NM20260031 |
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
With 43 classifications carrying published rates, this is a comparatively deep schedule; most trades a building project needs appear without a conformance request.
Most rate lines here carry SU or state-adopted identifiers, meaning they come from wage surveys rather than negotiated agreements. Survey rates change less often but can jump when a new survey publishes.
A wage determination is cited as number plus modification, for example NM20260031 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| CARPENTERDRYWALL HANGING ONLY (CIBOLA) |
| $29.09 |
| $16.20 |
| NM20260031 |
| CARPENTERDRYWALL HANGING ONLY (GUADALUPE, HARDING, MORA, AND TAOS) | $24.08 | $10.79 | NM20260031 |
| CARPENTER(BATT INSULATION ONLY) | $26.07 | $5.96 | NM20260031 |
| CARPENTER(FORM WORK ONLY) | $18.80 | $5.61 | NM20260031 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORM WORK | $19.27 | $4.29 | NM20260031 |
| CEMENT MASON/CONCRETE FINISHER | $16.27 | $3.94 | NM20260031 |
| DRYWALL FINISHER/TAPER | $18.34 | $4.38 | NM20260031 |
| ELECTRICIAN(ZONE 1). ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. ZONE 2: EXTENDING UP TO 20 MILES BEYOND ZONE 1, EXCEPT ALBURQUELECTRICIAN (ZONE 1). ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. ZONE 2: EXTENDING UP TO 20 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE | $40.30 | $13.41 | NM20260031 |
| FLOOR LAYERCARPET | $18.05 | $4.49 | NM20260031 |
| GLAZIER | $20.15 | $3.63 | NM20260031 |
| IRONWORKERSTRUCTURAL AND ORNAMENTAL | $28.05 | $18.11 | NM20260031 |
| IRONWORKER, REINFORCING | $19.75 | $8.71 | NM20260031 |
| LABORERCOMMON OR GENERAL | $12.99 | $3.56 | NM20260031 |
| LABORERPIPELAYER | $13.78 | $2.20 | NM20260031 |
| LABORERASPHALT RAKER | $10.25 | $0.00 | NM20260031 |
| LABORERMASON TENDER - CEMENT/CONCRETE | $11.51 | $0.85 | NM20260031 |
| LABORERLANDSCAPE & IRRIGATION | $12.42 | $1.47 | NM20260031 |
| LABORER, MASON TENDER BRICK | $23.69 | $7.89 | NM20260031 |
| OPERATORFORKLIFT | $20.86 | $4.60 | NM20260031 |
| OPERATORLOADER (FRONT END) | $19.76 | $4.84 | NM20260031 |
| OPERATORBACKHOE | $18.79 | $3.47 | NM20260031 |
| OPERATORCRANE | $24.38 | $4.60 | NM20260031 |
| OPERATORGRADER/BLADE | $20.33 | $4.94 | NM20260031 |
| PAINTERBRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING | $24.00 | $7.00 | NM20260031 |
| PAINTERSPRAY (EXCLUDES DRYWALL FINISHING/TAPING) | $15.47 | $2.09 | NM20260031 |
| PIPEFITTERINCLUDING HVAC PIPE INSTALLATION | $43.07 | $16.60 | NM20260031 |
| PLASTERER | $17.65 | $5.29 | NM20260031 |
| PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $43.07 | $16.60 | NM20260031 |
| POWER EQUIPMENT OPERATOR((4) BOBCAT/SKID LOADER) | $27.70 | $4.65 | NM20260031 |
| POWER EQUIPMENT OPERATOR((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | $4.65 | NM20260031 |
| ROOFER | $18.84 | $0.00 | NM20260031 |
| SHEET METAL WORKER(HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | NM20260031 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 | NM20260031 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $20.00 | $4.16 | NM20260031 |
| TILE FINISHER | $14.02 | $0.00 | NM20260031 |
| TILE SETTER | $14.30 | $1.02 | NM20260031 |
| TRUCK DRIVERDUMP TRUCK | $11.00 | $0.00 | NM20260031 |
| TRUCK DRIVERPICKUP TRUCK | $15.91 | $3.13 | NM20260031 |
| TRUCK DRIVERWATER TRUCK | $15.16 | $4.69 | NM20260031 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.