ELECTRICIAN leads the building schedule for Hudson County, NJ at $73.59 base plus $45.99 fringe. The active federal wage determination covering building construction in Hudson County, NJ lists 38 classifications with published rates, base pay from $28.37 to $73.59 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontaminationof personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of mat | $28.37 | $21.62 | NJ20260033 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR(Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement) | $51.74 | $46.20 |
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
With 38 classifications carrying published rates, this is a comparatively deep schedule; most trades a building project needs appear without a conformance request.
95% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example NJ20260033 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| NJ20260033 |
| BRICKLAYER(INCLUDING CAULKING, CLEANING AND Work on high stacks: 22% per hour additional. | $49.60 | $37.96 | NJ20260033 |
| CARPENTER(SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $57.42 | $34.17 | NJ20260033 |
| CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION) | $57.42 | $34.17 | NJ20260033 |
| CEMENT MASON/CONCRETE FINISHER | $54.64 | $30.95 | NJ20260033 |
| DRYWALL FINISHER/TAPER | $44.87 | $30.15 | NJ20260033 |
| ELECTRICIAN(INCLUDING LOW VOLTAGE Work on line voltage of 440 or 480 volts: 10% per hour Work from trusses, scaffolds, frames, ladders and poles, 40 ft. or more above the ground or floor (does not include work from a manlift): 20% per hour Work on radio towers, transmission towers and smokestacks: 21% per hour additional | $62.90 | $39.31 | NJ20260033 |
| ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING) CABLE Work on line voltage of 440 or 480 volts: 10% per hour Work from trusses, scaffolds, frames, ladders and poles, 40 ft. or more above the ground or floor (does not include work from a manlift): 20% per hour Work on radio towers, transmission towers and smokestacks: 21% per hour additional | $73.59 | $45.99 | NJ20260033 |
| ELEVATOR MECHANIC | $40.21 | $11.22 | NJ20260033 |
| IRONWORKERSTRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | NJ20260033 |
| IRONWORKERREINFORCING | $49.94 | $50.32 | NJ20260033 |
| LABORERBRICK/CEMENT/CONCRETE | $36.50 | $30.22 | NJ20260033 |
| LABORERASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 | NJ20260033 |
| LABORERPIPELAYER | $38.85 | $0.14 | NJ20260033 |
| MARBLE SETTER | $64.66 | $40.97 | NJ20260033 |
| MASON - Work on high stacks22% per hour additional | $49.60 | $37.96 | NJ20260033 |
| PAINTER(BRUSH & ROLLER) | $45.55 | $29.86 | NJ20260033 |
| PAINTER(SPRAY) | $45.55 | $29.86 | NJ20260033 |
| PIPEFITTER(INCLUDING HVAC PIPE INSTALLATION) (HUDSON COUNTY (City of Bayonne; Borough of East Newark; Towns of Guttenberg and Harrison; Cities of Hoboken and Jersey City; Town of Kearney; Township of North Bergen; Town of Secaucus; City of Union City; Township of Weehawken; Town of West New York)) | $57.97 | $40.22 | NJ20260033 |
| PLASTERER | $54.64 | $30.95 | NJ20260033 |
| PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $62.09 | $45.05 | NJ20260033 |
| POWER EQUIPMENT OPERATORSGROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER W | $52.88 | $37.50 | NJ20260033 |
| POWER EQUIPMENT OPERATORSGROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPEN | $56.59 | $37.50 | NJ20260033 |
| POWER EQUIPMENT OPERATORSGROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLI | $58.22 | $37.50 | NJ20260033 |
| POWER EQUIPMENT OPERATORSGROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON | $60.13 | $37.50 | NJ20260033 |
| POWER EQUIPMENT OPERATORSGROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, | $61.72 | $37.50 | NJ20260033 |
| ROOFER(INCLUDES ALL TYPES OF ROOFERS) | $44.52 | $32.25 | NJ20260033 |
| ROOFER(ALL TYPES) (HUDSON COUNTY (EAST OF THE HACKENSACK RIVER)) | $50.25 | $39.62 | NJ20260033 |
| SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $51.30 | $51.55 | NJ20260033 |
| SOFT FLOOR LAYER | $57.42 | $34.17 | NJ20260033 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $67.97 | $39.35 | NJ20260033 |
| TILE SETTER | $64.90 | $37.28 | NJ20260033 |
| TILE Work grouting all epoxy$10.00 additional per day | $50.05 | $33.90 | NJ20260033 |
| TRUCK DRIVERDUMP TRUCK HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally desTRUCK DRIVER: DUMP TRUCK HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, in a zone requiring Level B, C or D personal protection for any workers other than the truck driver: $1.00 per hour PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the employee has been assigned to work, or, ""shapes"", one day of the calendar week during which the holiday occurs | $47.36 | $44.02 | NJ20260033 |
| TRUCK DRIVEROFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally dTRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, in a zone requiring Level B, C or D personal protection for any workers other than the truck driver: $1.00 per hour PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the employee has been assigned to work, or, ""shapes"", one day of the calendar week during which the holiday occurs | $47.51 | $44.02 | NJ20260033 |
| Work of erection and dismantling of elevators and towers, such as concreteconveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter. | $58.84 | $35.06 | NJ20260033 |
| Work welding or using a cutting torch$1.00 per hour additional. Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet: $1.00 per hour additional | $52.68 | $31.29 | NJ20260033 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.