ELEVATOR MECHANIC FOOTNOTE leads the building schedule for Powell County, MT at $67.61 base plus $38.44 fringe. The active federal wage determination covering building construction in Powell County, MT lists 22 classifications with published rates, base pay from $15.48 to $67.61 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BOILERMAKER | $38.75 | $32.31 | MT20260048 |
| BRICKLAYER | $33.11 | $17.18 | MT20260048 |
| CARPENTERACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING AND FORM WORK ONLY ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING TOWNS TO THE CETER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, LEWISTON, MILES CITY, AND MISSOULA ZONE 1: 0 TO 30 MILES - BASE RATE ZONE 2: 31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00CARPENTER: ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING AND FORM WORK ONLY ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING TOWNS TO THE CETER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, LEWISTON, MILES CITY, AND MISSOULA ZONE 1: 0 TO 30 MILES - BASE RATE ZONE 2: 31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00 |
Across the 22 published classifications for building work in Powell County, MT, base pay spans $15.48 to $67.61 per hour with a median of $28.05.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
This schedule mixes sources: 55% of lines carry union identifiers and the rest are survey-based. Two crews on one site can be governed by rates that update on entirely different rhythms.
A wage determination is cited as number plus modification, for example MT20260048 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $32.05 |
| $15.02 |
| MT20260048 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK | $20.51 | $7.13 | MT20260048 |
| CEMENT MASON/CONCRETE FINISHER | $18.27 | $1.50 | MT20260048 |
| ELECTRICIAN | $40.00 | $19.88 | MT20260048 |
| ELEVATOR MECHANIC FOOTNOTEA. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $67.61 | $38.44 | MT20260048 |
| GLAZIER | $17.93 | $2.62 | MT20260048 |
| HEAT AND FROST INSULATOR | $43.81 | $21.87 | MT20260048 |
| IRONWORKERREINFORCING AND STRUCTURAL | $36.83 | $25.30 | MT20260048 |
| LABORERCOMMON OR GENERAL | $17.77 | $5.23 | MT20260048 |
| LABORER, ZONE 1MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING LISTED TOWN TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, HELENA, GREAT FALLS, MISSOULA, KALISPELL TRAVEL ZONES: ZONE 1: 0 TO 30 MILES, BASE PAY ZONE 2: 30-60, ADD $3.05 TO BASE PAY ZONE 3: OVER 60 MILES, ADD $4.85 TO BASE PAYLABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING LISTED TOWN TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, HELENA, GREAT FALLS, MISSOULA, KALISPELL TRAVEL ZONES: ZONE 1: 0 TO 30 MILES, BASE PAY ZONE 2: 30-60, ADD $3.05 TO BASE PAY ZONE 3: OVER 60 MILES, ADD $4.85 TO BASE PAY | $23.05 | $12.72 | MT20260048 |
| OPERATORCRANE | $24.04 | $7.41 | MT20260048 |
| OPERATOREXCAVATOR | $22.20 | $6.75 | MT20260048 |
| OPERATORFORKLIFT | $21.44 | $8.05 | MT20260048 |
| PAINTERBRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $19.18 | $0.00 | MT20260048 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $42.80 | $17.28 | MT20260048 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $42.80 | $17.28 | MT20260048 |
| ROOFER | $15.48 | $5.28 | MT20260048 |
| SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $40.00 | $22.07 | MT20260048 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $39.97 | $24.40 | MT20260048 |
| TRUCK DRIVERDUMP TRUCK | $19.36 | $5.37 | MT20260048 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.