DOL marked wage determination MT20260062 modified July 30, 2026 (revision 2). Verify against the source below before filing.
Rates on this page changed recently: the governing determination carries a modification dated July 30, 2026. The active federal wage determination covering building construction in Cascade County, MT lists 19 classifications with published rates, base pay from $14.62 to $67.61 per hour. The determination was last modified July 30, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BOILERMAKER | $38.75 | $32.31 | MT20260062 |
| BRICKLAYER | $33.11 | $17.18 | MT20260062 |
| CARPENTERINCLUDES DRYWALL HANGING AND FORMWORK ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING TOWNS TO THE CETER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, LEWISTON, MILES CITY, AND MISSOULA ZONE 1: 0 TO 30 MILES - BASE RATE ZONE 2: 31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00CARPENTER: INCLUDES DRYWALL HANGING AND FORMWORK ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING TOWNS TO THE CETER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, LEWISTON, MILES CITY, AND MISSOULA ZONE 1: 0 TO 30 MILES - BASE RATE ZONE 2: 31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00 |
Across the 19 published classifications for building work in Cascade County, MT, base pay spans $14.62 to $67.61 per hour with a median of $32.88.
The governing determination was modified July 30, 2026, within the last 30 days. Contractors mid-bid in Cascade County should re-check figures against the determination text before submitting.
79% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example MT20260062 Mod dated July 30, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov August 1, 2026. The wage determination incorporated into your contract is the legally operative document.
| $32.05 |
| $15.02 |
| MT20260062 |
| ELECTRICIAN | $36.50 | $16.48 | MT20260062 |
| ELECTRICIAN(LOW VOLTAGE WIRING FOR ALARMS, COMPUTERS & HVAC TEMPERATURE CONTROLS) | $23.90 | $11.51 | MT20260062 |
| ELEVATOR MECHANIC FOOTNOTEA. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $67.61 | $38.44 | MT20260062 |
| HEAT AND FROST INSULATOR | $43.81 | $21.87 | MT20260062 |
| IRONWORKER, STRUCTURAL, REINFORCING AND ORNAMENTAL | $36.83 | $25.30 | MT20260062 |
| LABORERCOMMON OR GENERAL | $14.62 | $5.02 | MT20260062 |
| LABORER, ZONE 1MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING LISTED TOWN TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, HELENA, GREAT FALLS, MISSOULA, KALISPELL TRAVEL ZONES: ZONE 1: 0 TO 30 MILES, BASE PAY ZONE 2: 30-60, ADD $3.05 TO BASE PAY ZONE 3: OVER 60 MILES, ADD $4.85 TO BASE PAYLABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING LISTED TOWN TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, HELENA, GREAT FALLS, MISSOULA, KALISPELL TRAVEL ZONES: ZONE 1: 0 TO 30 MILES, BASE PAY ZONE 2: 30-60, ADD $3.05 TO BASE PAY ZONE 3: OVER 60 MILES, ADD $4.85 TO BASE PAY | $23.05 | $12.72 | MT20260062 |
| OPERATORBACKHOE | $20.56 | $6.35 | MT20260062 |
| PAINTERBRUSH AND SPRAY | $26.39 | $19.39 | MT20260062 |
| PAINTERROLLER | $17.00 | $0.00 | MT20260062 |
| PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $46.45 | $19.92 | MT20260062 |
| PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $46.45 | $19.92 | MT20260062 |
| POWER EQUIPMENT OPERATORZONE 1: (2) EXCAVATOR ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50POWER EQUIPMENT OPERATOR: ZONE 1: (2) EXCAVATOR ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $32.88 | $16.20 | MT20260062 |
| POWER EQUIPMENT OPERATORZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAPOWER EQUIPMENT OPERATOR: ZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $31.51 | $16.20 | MT20260062 |
| ROOFER | $14.68 | $2.12 | MT20260062 |
| SHEET METAL WORKER(HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $40.07 | $22.07 | MT20260062 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.