ELEVATOR MECHANIC. A. VACATION leads the building schedule for Stone County, MO at $60.69 base plus $38.44 fringe. The active federal wage determination covering building construction in Stone County, MO lists 49 classifications with published rates, base pay from $17.95 to $60.69 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR(HENRY COUNTY) | $45.60 | $35.47 | MO20260032 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR(REMAINING COUNTIES) | $31.97 | $14.00 | MO20260032 |
| BRICKLAYER(REMAINING COUNTIES) | $33.67 | $19.48 | MO20260032 |
| BRICKLAYER(HENRY COUNTY) | $34.35 |
The highest published base on this schedule belongs to ELEVATOR MECHANIC. A. VACATION at $60.69 per hour plus $38.44 fringe; the schedule's median base is $32.25.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
86% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example MO20260032 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $18.06 |
| MO20260032 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION(HENRY COUNTY) | $42.06 | $22.40 | MO20260032 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION(HICKORY, LACLEDE & ST CLAIR COUNTIES) | $39.48 | $22.40 | MO20260032 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION(DADE, DOUGLAS, OZARK, STONE & TANEY COUNTIES) | $29.39 | $21.25 | MO20260032 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | MO20260032 |
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (DADE & ST. CLAIR COUNTIES) | $32.25 | $20.81 | MO20260032 |
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (HENRY COUNTY) | $51.01 | $26.25 | MO20260032 |
| ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMSSTONE AND TANEY COUNTIES (DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES) | $28.65 | $18.34 | MO20260032 |
| ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMSDOUGLAS, HICKORY, LACLEDE, & OZARK COUNTIES (DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES) | $32.40 | $19.11 | MO20260032 |
| ELEVATOR MECHANIC. A. VACATIONEMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | MO20260032 |
| GLAZIER | $22.71 | $0.00 | MO20260032 |
| IRONWORKER, REINFORCING AND STRUCTURAL(HENRY COUNTY) | $39.00 | $34.25 | MO20260032 |
| IRONWORKER, REINFORCING AND STRUCTURAL(STONE COUNTY) | $36.00 | $34.25 | MO20260032 |
| IRONWORKER, REINFORCING AND STRUCTURAL(DADE, HICKORY, OZARK, ST. CLAIR, & TANEY COUNTIES) | $36.00 | $34.25 | MO20260032 |
| IRONWORKER, REINFORCING AND STRUCTURAL(DOUGLAS & LACLEDE COUNTIES) | $31.39 | $29.20 | MO20260032 |
| LABORERCOMMON OR GENERAL & LANDSCAPE (HENRY & HICKORY COUNTIES) | $26.50 | $13.18 | MO20260032 |
| LABORERBRICK MASON TENDER (HENRY & HICKORY COUNTIES) | $28.00 | $13.18 | MO20260032 |
| LABORERBRICK MASON TENDER (DADE, DOUGLAS, LACLEDE, OZARK, ST CLAIR, STONE AND TANEY COUNTIES) | $29.23 | $13.62 | MO20260032 |
| LABORERCOMMON OR GENERAL & LANDSCAPE (DADE, DOUGLAS, LACLEDE, OZARK, ST CLAIR, STONE AND TANEY COUNTIES) | $27.05 | $13.62 | MO20260032 |
| OPERATORBACKHOE/TRACKHOE | $23.55 | $7.47 | MO20260032 |
| OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 | MO20260032 |
| OPERATORWATER TRUCK | $28.37 | $0.00 | MO20260032 |
| PAINTERDRYWALL FINISHING/TAPING ONLY (HENRY COUNTY) | $25.39 | $17.76 | MO20260032 |
| PAINTERBRUSH & ROLLER ONLY (HENRY COUNTY) | $24.43 | $17.76 | MO20260032 |
| PAINTERDRYWALL FINISHING/TAPING ONLY (LACLEDE COUNTY) | $34.90 | $17.21 | MO20260032 |
| PAINTER(LACLEDE COUNTY) | $33.90 | $17.21 | MO20260032 |
| PAINTERBRUSH & ROLLER ONLY (LACLEDE COUNTY) | $33.90 | $17.21 | MO20260032 |
| PAINTER(BRUSH & ROLLER ONLY) | $19.75 | $11.76 | MO20260032 |
| PAINTERSPRAY | $18.79 | $8.12 | MO20260032 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION(DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES) | $39.35 | $15.72 | MO20260032 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION(HENRY & ST. CLAIR COUNTIES) | $57.51 | $28.35 | MO20260032 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION(HENRY & ST. CLAIR COUNTIES) | $58.38 | $25.29 | MO20260032 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION(DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES) | $39.35 | $15.72 | MO20260032 |
| POWER EQUIPMENT OPERATORBULLDOZER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $31.62 | $18.07 | MO20260032 |
| POWER EQUIPMENT OPERATORLOADER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $31.62 | $18.07 | MO20260032 |
| POWER EQUIPMENT OPERATORROLLER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $30.91 | $18.07 | MO20260032 |
| POWER EQUIPMENT OPERATORGRADER/BLADE (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $31.62 | $18.07 | MO20260032 |
| POWER EQUIPMENT OPERATOR: ROLLER (HENRY COUNTY) | $45.48 | $22.42 | MO20260032 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (HENRY COUNTY) | $45.48 | $22.42 | MO20260032 |
| POWER EQUIPMENT OPERATOR: LOADER (HENRY COUNTY) | $45.84 | $22.42 | MO20260032 |
| ROOFER | $30.73 | $14.51 | MO20260032 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION(HENRY, HICKORY, & ST CLAIR COUNTIES) | $47.20 | $26.28 | MO20260032 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION(DADE, DOUGLAS, LACLEDE, OZARK, STONE & TANEY COUNTIES) | $34.43 | $17.86 | MO20260032 |
| TILE SETTER(HENRY COUNTY) | $40.53 | $15.99 | MO20260032 |
| TILE SETTER(REMAINING COUNTIES) | $26.47 | $14.89 | MO20260032 |
| TRUCK DRIVERDUMP TRUCK | $28.92 | $0.00 | MO20260032 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.