ELEVATOR MECHANIC. FOOTNOTES leads the building schedule for Pemiscot County, MO at $62.73 base plus $38.44 fringe. The active federal wage determination covering building construction in Pemiscot County, MO lists 29 classifications with published rates, base pay from $16.44 to $62.73 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $34.69 | $22.84 | MO20260016 |
| BRICKLAYER | $31.51 | $15.00 | MO20260016 |
| CARPENTER(FORM WORK ONLY) | $32.59 | $21.85 | MO20260016 |
| CARPENTER(FLOOR LAYER) (VINYL INSTALLATION ONLY) | $40.08 | $21.85 | MO20260016 |
Across the 29 published classifications for building work in Pemiscot County, MO, base pay spans $16.44 to $62.73 per hour with a median of $35.10.
This schedule has been stable recently; the last modification is dated May 18, 2026. Stability is not permanence: annual editions and mid-year modifications can reset rates in Pemiscot County without local notice.
76% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example MO20260016 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Certified payroll uses the employee's name and an individually identifying number, normally the last four digits of the Social Security number. Full SSNs do not belong on submitted payrolls.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| CARPENTER, EXCLUDES FORM WORK, AND SOFT FLOOR(VINYL) INSTALLATION | $22.46 | $4.72 | MO20260016 |
| CEMENT MASON/CONCRETE FINISHER | $35.10 | $18.78 | MO20260016 |
| ELECTRICIAN | $49.29 | $33.64 | MO20260016 |
| ELEVATOR MECHANIC. FOOTNOTESA) EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY FRIDAY AFTER THANKSGIVING DAY, VETERANS' DAY AND CHRISTM | $62.73 | $38.44 | MO20260016 |
| IRONWORKERREINFORCING AND STRUCTURAL | $34.47 | $24.85 | MO20260016 |
| LABORER(BRICK MASON TENDER) | $30.48 | $14.91 | MO20260016 |
| LABORERCOMMON OR GENERAL | $21.95 | $0.00 | MO20260016 |
| OPERATORGRADER/BLADE | $22.80 | $10.78 | MO20260016 |
| PAINTERBRUSH ONLY | $16.44 | $6.01 | MO20260016 |
| PAINTERROLLER | $16.44 | $6.01 | MO20260016 |
| PAINTERSPRAY | $18.79 | $8.12 | MO20260016 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION(ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | MO20260016 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION(ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | MO20260016 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION(ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | MO20260016 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION(ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | MO20260016 |
| POWER EQUIPMENT OPERATOR(PAVER) | $39.06 | $30.38 | MO20260016 |
| POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $39.06 | $30.38 | MO20260016 |
| POWER EQUIPMENT OPERATORBULLDOZER | $39.06 | $30.38 | MO20260016 |
| POWER EQUIPMENT OPERATOR(LOADER) | $39.06 | $30.38 | MO20260016 |
| POWER EQUIPMENT OPERATORROLLER | $39.06 | $30.38 | MO20260016 |
| ROOFER | $32.25 | $17.46 | MO20260016 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $52.00 | $27.12 | MO20260016 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $45.94 | $27.53 | MO20260016 |
| TILE SETTER | $31.51 | $15.00 | MO20260016 |
| TRUCK DRIVERDUMP TRUCK | $25.57 | $0.00 | MO20260016 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.