ELEVATOR MECHANIC. A. VACATION leads the building schedule for Barry County, MO at $60.69 base plus $38.44 fringe. The active federal wage determination covering building construction in Barry County, MO lists 44 classifications with published rates, base pay from $17.95 to $60.69 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 | MO20260029 |
| BRICKLAYER(BENTON COUNTY) | $32.79 | $21.31 | MO20260029 |
| BRICKLAYER(BARRY & BARTON COUNTIES) | $33.67 | $19.48 | MO20260029 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION(BENTON COUNTY) | $31.51 | $22.25 |
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
With 44 classifications carrying published rates, this is a comparatively deep schedule; most trades a building project needs appear without a conformance request.
84% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example MO20260029 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| MO20260029 |
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION(BARRY & BARTON COUNTIES) | $29.50 | $21.50 | MO20260029 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | MO20260029 |
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (BARRY & BARTON COUNTIES) | $32.25 | $20.81 | MO20260029 |
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (BENTON COUNTY) | $51.01 | $26.25 | MO20260029 |
| ELEVATOR MECHANIC. A. VACATIONEMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | MO20260029 |
| GLAZIER | $22.71 | $0.00 | MO20260029 |
| IRONWORKERREINFORCING AND STRUCTURAL (BARRY COUNTY) | $36.00 | $34.25 | MO20260029 |
| IRONWORKER, REINFORCING AND STRUCTURAL(BARTON & BENTON COUNTIES) | $36.00 | $34.25 | MO20260029 |
| LABORERCOMMON OR GENERAL & LANDSCAPE (BARTON & BENTON COUNTIES) | $26.50 | $13.18 | MO20260029 |
| LABORERBRICK MASON TENDER (BARTON & BENTON COUNTIES) | $28.00 | $13.18 | MO20260029 |
| LABORERCOMMON OR GENERAL & LANDSCAPE (BARRY COUNTY) | $27.05 | $13.62 | MO20260029 |
| LABORERBRICK MASON TENDER (BARRY COUNTY) | $29.78 | $13.62 | MO20260029 |
| OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 | MO20260029 |
| OPERATORBACKHOE/TRACKHOE | $23.55 | $7.47 | MO20260029 |
| OPERATORWATER TRUCK | $28.37 | $0.00 | MO20260029 |
| PAINTERDRYWALL FINISHING/TAPING ONLY (BENTON COUNTY) | $25.39 | $17.76 | MO20260029 |
| PAINTERBRUSH & ROLLER ONLY (BENTON COUNTY) | $24.43 | $17.76 | MO20260029 |
| PAINTER(DRYWALL FINISHING/TAPING ONLY) | $25.79 | $15.35 | MO20260029 |
| PAINTERSPRAY | $18.79 | $8.12 | MO20260029 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION(BENTON COUNTY) | $57.51 | $28.35 | MO20260029 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARRY COUNTY | $37.15 | $15.42 | MO20260029 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARTON COUNTY(PROJECTS OVER $750,000) | $35.75 | $15.32 | MO20260029 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION BARTON COUNTY(PROJECTS $750,000 & UNDER) | $32.78 | $15.32 | MO20260029 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION(BENTON COUNTY) | $58.38 | $25.29 | MO20260029 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARRY COUNTY | $37.15 | $15.42 | MO20260029 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY(PROJECTS OVER $750,000) | $34.25 | $15.32 | MO20260029 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION BARTON COUNTY(PROJECTS $750,000 & UNDER) | $31.28 | $15.32 | MO20260029 |
| POWER EQUIPMENT OPERATORROLLER (BARRY & BARTON COUNTIES) | $30.91 | $18.07 | MO20260029 |
| POWER EQUIPMENT OPERATORGRADER/BLADE (BARRY & BARTON COUNTIES) | $31.62 | $18.07 | MO20260029 |
| POWER EQUIPMENT OPERATORBULLDOZER (BARRY & BARTON COUNTIES) | $31.62 | $18.07 | MO20260029 |
| POWER EQUIPMENT OPERATORLOADER (BARRY & BARTON COUNTIES) | $31.62 | $18.07 | MO20260029 |
| POWER EQUIPMENT OPERATORLOADER (BENTON COUNTY) | $45.48 | $22.42 | MO20260029 |
| POWER EQUIPMENT OPERATORGRADER/BLADE (BENTON COUNTY) | $45.48 | $22.42 | MO20260029 |
| POWER EQUIPMENT OPERATORROLLER (BENTON COUNTY) | $45.48 | $22.42 | MO20260029 |
| ROOFER | $30.73 | $14.51 | MO20260029 |
| SHEET METAL WORKER(BARTON & BENTON COUNTIES) | $47.20 | $26.28 | MO20260029 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION(BARRY COUNTY) | $34.43 | $17.86 | MO20260029 |
| TILE SETTER(BENTON COUNTY) | $32.79 | $21.31 | MO20260029 |
| TILE SETTER(BARRY & BARTON COUNTIES) | $26.47 | $14.89 | MO20260029 |
| TRUCK DRIVERDUMP TRUCK | $28.92 | $0.00 | MO20260029 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.