ELECTRICIAN leads the residential schedule for Terrebonne Parish, LA at $36.00 base plus $16.66 fringe. The active federal wage determination covering residential construction in Terrebonne Parish, LA lists 22 classifications with published rates, base pay from $8.01 to $36.00 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| CARPENTER(INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, AND FORMBUILDING/FORMSETTING) | $11.78 | $0.00 | LA20260001 |
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS AND SECURITY SYSTEMS (JEFFERSON, LAFOURCHE, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST. JAMES, ST. JOHN THE BAPTIST, ST. MARTIN (SOUTHERN PORTION), AND TERREBONNE PARISHES) | $36.00 | $16.66 | LA20260001 |
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS AND SECURITY SYSTEMS (BOSSIER, CADDO, AND WEBSTER PARISHES) | $35.85 | $15.58 |
The highest published base on this schedule belongs to ELECTRICIAN at $36.00 per hour plus $16.66 fringe; the schedule's median base is $27.49.
This schedule has been stable recently; the last modification is dated May 18, 2026. Stability is not permanence: annual editions and mid-year modifications can reset rates in Terrebonne Parish without local notice.
73% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example LA20260001 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Certified payroll uses the employee's name and an individually identifying number, normally the last four digits of the Social Security number. Full SSNs do not belong on submitted payrolls.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS AND SECURITY SYSTEMS (OUACHITA PARISH) | $29.55 | $14.36 | LA20260001 |
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS AND SECURITY SYSTEMS (RAPIDES PARISH) | $30.00 | $12.03 | LA20260001 |
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS AND SECURITY SYSTEMS (ACADIA, CALCASIEU, LAFAYETTE, AND ST. MARTIN (NORTHERN PORTION) PARISHES) | $31.98 | $15.14 | LA20260001 |
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS AND SECURITY SYSTEMS (ASCENSION, EAST BATON ROUGE, LIVINGSTON, ST. LANDRY, AND WEST BATON ROUGE PARISHES) | $29.47 | $13.50 | LA20260001 |
| ELECTRICIANINCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS AND SECURITY SYSTEMS (ST. TAMMANY PARISH) | $30.35 | $12.46 | LA20260001 |
| LABORER, COMMON | $8.01 | $0.00 | LA20260001 |
| PAINTERDRYWALL FINISHING | $12.71 | $0.78 | LA20260001 |
| PAINTERBRUSH, ROLLER, AND SPRAY | $11.38 | $0.83 | LA20260001 |
| PLUMBERINCLUDING HVAC PIPE (JEFFERSON, LAFOURCHE, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST. JAMES (SOUTHEASTERN PORTION), ST. JOHN THE BAPTIST, ST. TAMMANY, AND TERREBONNE PARISHES) | $31.70 | $13.85 | LA20260001 |
| PLUMBERINCLUDING HVAC PIPE (BOSSIER, CADDO, AND WEBSTER PARISHES) | $28.48 | $14.47 | LA20260001 |
| PLUMBERINCLUDING HVAC PIPE (OUACHITA PARISH) | $28.75 | $11.86 | LA20260001 |
| PLUMBERINCLUDING HVAC PIPE (ASCENSION, EAST BATON ROUGE, LIVINGSTON , ST. JAMES (NORTHWESTERN PORTION), ST. MARTIN (EASTERN PORTION), AND WEST BATON ROUGE PARISHES) | $32.42 | $16.50 | LA20260001 |
| PLUMBERINCLUDING HVAC PIPE (ACADIA, CALCASIEU, LAFAYETTE, ST. LANDRY, AND ST. MARTIN (WESTERN PORTION) PARISHES) | $25.90 | $13.65 | LA20260001 |
| PLUMBERINCLUDING HVAC PIPE (RAPIDES PARISH) | $26.50 | $13.39 | LA20260001 |
| POWER EQUIPMENT OPERATORCRANE | $13.00 | $0.00 | LA20260001 |
| ROOFER | $10.11 | $2.01 | LA20260001 |
| SHEET METAL WORKERINCLUDES HVAC DUCT (JEFFERSON, LAFOURCHE, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST. JAMES, ST. JOHN THE BAPTIST, ST. TAMMANY, AND TERREBONNE PARISHES) | $24.54 | $9.65 | LA20260001 |
| SHEET METAL WORKERINCLUDES HVAC DUCT (ACADIA, ASCENSION, CALCASIEU, EAST BATON ROUGE, LAFAYETTE, LIVINGSTON, ST. LANDRY, ST. MARTIN, AND WEST BATON ROUGE PARISHES) | $24.37 | $9.20 | LA20260001 |
| SHEET METAL WORKERINCLUDING HVAC DUCT (BOSSIER, CADDO, OUACHITA, RAPIDES, AND WEBSTER PARISHES) | $26.09 | $11.00 | LA20260001 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.