ELEVATOR MECHANIC leads the building schedule for Owen County, IN at $62.73 base plus $38.44 fringe. The active federal wage determination covering building construction in Owen County, IN lists 76 classifications with published rates, base pay from $22.09 to $62.73 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATORINCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANCIAL SYSTEMS (CLAY, GREENE, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $40.20 | $25.68 | IN20260003 |
| ASBESTOS WORKER/HEAT & FROST INSULATORINCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AN FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT (GIBSON, POSEY, SULLIVAN, VANDERBURGH AND WARRICK COUNTIES) | $38.19 | $23.59 | IN20260003 |
| BOILERMAKER | $43.24 |
Across the 76 published classifications for building work in Owen County, IN, base pay spans $22.09 to $62.73 per hour with a median of $33.28.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
100% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example IN20260003 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $38.17 |
| IN20260003 |
| BRICKLAYERTERRAZZO (TERRE HAUTE CLAY, GIBSON, REENE, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $27.50 | $15.20 | IN20260003 |
| BRICKLAYERTILE, MARBLE, MOSAIC (TERRE HAUTE CLAY, GIBSON, REENE, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $35.63 | $17.23 | IN20260003 |
| BRICKLAYER, STONEMASON(EVANSVILLE POSEY, VANDERBURGH AND WARRICK COUNTIES) | $34.17 | $20.14 | IN20260003 |
| BRICKLAYER, STONEMASON(BLOOMINGTON OWEN COUNTY) | $35.21 | $18.19 | IN20260003 |
| CARPENTERCARPENTER (POSEY, VANDERBURGH AND WARRICK COUNTIES) | $33.09 | $26.50 | IN20260003 |
| CARPENTERPILEDRIVER (POSEY, VANDERBURGH AND WARRICK COUNTIES) | $34.04 | $26.50 | IN20260003 |
| CARPENTERCARPENTER (GREENE, GIBSON AND SULLIVAN COUNTIES) | $33.08 | $26.46 | IN20260003 |
| CARPENTERPILEDRIVER (GREENE, GIBSON AND SULLIVAN COUNTIES) | $34.08 | $26.46 | IN20260003 |
| CARPENTERSSOFT FLOOR LAYERS (CLAY, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $35.54 | $22.12 | IN20260003 |
| CEMENT MASON/CONCRETE FINISHER(CLAY, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES:) | $25.75 | $13.50 | IN20260003 |
| CEMENT MASON/CONCRETE FINISHER(GREENE AND SULLIVAN COUNTIES) | $28.50 | $13.50 | IN20260003 |
| CEMENT MASON/CONCRETE FINISHER(GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $26.30 | $16.91 | IN20260003 |
| COMMUNICATION TECHNICIANINCLUDES THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOUND AND VISION PRODUCTION AND REPRODUCTION APPARATUS, EQUIPMENT AND APPLIANCES USED FOR DOMESTIC, COMMERCIAL, EDUCATION, ENTERTAINMENT AND PRIVATE TELEPHONE SYSTEMS. (CLAY, GREENE, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES) | $30.00 | $18.07 | IN20260003 |
| ELECTRICIAN(GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $46.14 | $21.90 | IN20260003 |
| ELECTRICIAN(PUTNAM COUNTY) | $45.45 | $28.19 | IN20260003 |
| ELECTRICIAN(VERMILLION COUNTY) | $40.00 | $27.36 | IN20260003 |
| ELECTRICIAN(CLAY, GREENE, OWEN, PARKE, SULLIVAN AND VIGO COUNTIES) | $43.30 | $25.32 | IN20260003 |
| ELEVATOR MECHANIC(GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) FOOTNOTES: A) EMPLOYER CONTRIBUTES AS A VACATION PAY CREDIT 8% BASIC HOURLY RATE FOR MORE THAN 5 YEARS OF SERVICE AND 6% BASIC HOURLY RATE FOR LESS THAN 5 YEARS OF SERVICE. B) EIGHT PAID HOLIDAYS: THANKSGIVING DAY; NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $62.73 | $38.44 | IN20260003 |
| ELEVATOR MECHANIC(CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE; 6% FOR LESS THAN 5 YEARS' SERVICE | $60.17 | $38.44 | IN20260003 |
| GLAZIER(GIBSON, POSEY, VANDERBURGH, WARRICK COUNTIES) | $35.13 | $19.57 | IN20260003 |
| GLAZIER(CLAY; GREENE; OWEN; PARKE; PUTNAM; SULLIVAN; VERMILLION AND VIGO COUNTIES) | $36.03 | $20.55 | IN20260003 |
| HAZARDOUS MATERIAL HANDLERINCLUDES PREPARATION, WETTINGS STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (CLAY, GREENE, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES) | $23.00 | $14.40 | IN20260003 |
| IRONWORKER(CLAY, DAVIESS, GREENE, KNOX, LAWRENCE, MARTIN, MONROE, MONTGOMERY, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $38.00 | $26.39 | IN20260003 |
| IRONWORKER(GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $35.34 | $25.75 | IN20260003 |
| LABORERSCAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 4: Dynamite Men, Drillers air track or wagon drilling for explosives. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $24.18 | $16.00 | IN20260003 |
| LABORERSGROUP 1 BUILDING AND CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASONS OR PLASTERERS); MECHANIC TENDERS; FLAG & SIGNAL PERSON; WINDOW WASHERS & CLEANERS; WATERBOYS & TOOLHOUSEMEN; RAILROAD WORKERS; MASONRY WALL WASHERS (INTERIOR & EXTERIOR); CURING COMPOUND; ALL PORTABLE WATER PUMPS WITH DISCHARGE UP TO 3 INCHES; WATERPROOFING; HANDLING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); ASPHALT RAKERS & LUTEMEN; KETTLEMEN; AIR TOOL OPERATORS AND ALL PNEUMATI | $28.43 | $18.55 | IN20260003 |
| LABORERSGROUP 2 PLASTERERS' TENDERS; MORTAR MIXERS; WELDERS (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT NOZZLE LABORERS; CEMENT GUN OPERATORS; SCAFFOLD BUILDERS WHEN WORKING FOR PLASTERERS AND FOR MASONS; WATER BLAST MACHINE OPERATORS. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $29.18 | $18.55 | IN20260003 |
| LABORERSGROUP 3 DYNAMITE MEN; MASON TENDERS; DRILLERS-AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES LABORERS CLASSIFICATIONS FOR CAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $30.43 | $18.55 | IN20260003 |
| LABORERSCAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 3: Mucking Machine, Laser Beam, Liner Plate & Ring Setter, Shield Drivers, Power Knife, Welders Burners, Pipe Jacking Machine, Skinners, Maintenance Technician, Miner, Bricklayer Tenders, Concrete Blowers, Drillers, Erectors, Form Men, Jackhammermen, Mining Machine. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $24.18 | $16.00 | IN20260003 |
| LABORERSCAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 2: Concrete Repairmen, Lock Tenders (pressure side), Motor men, Muckers, Grout Machine, Track Layers, Air Hoist, Key Board, Agitator Car, Car Pushers, Concrete Laborers, Grout Laborers, Lock Tenders (free air side), Steel Setters, Tuggers, Tuggers, Switchmen. (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $23.93 | $16.00 | IN20260003 |
| LABORERSCAISSON AND TUNNEL WORK IN COMPRESSED AND FREE AIR: GROUP 1: Cage Tenders, Dump Men, Flagman, Signalman, Top Laborers, Rod Men (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, VIGO COUNTIES) | $23.18 | $16.00 | IN20260003 |
| LABORERSGROUP 1 BUILDING & CONSTRUCTION LABORERS; SCAFFOLD BUILDERS (OTHER THAN FOR MASONS OR PLASTERERS); IRONWORKER TENDER; MECHANIC TENDER; CIVIL ENGINEER TENDER; RODMEN AND CHAINMEN; SIGNALMEN AND FLAGMAN, WINDOW WASHER & CLEANER; WATERBOY AND TOOLHOUSEMAN; ROOFER TENDER; RAILROAD WORKER; MASONRY WALL WASHER (INTERIOR & EXTERIOR); CEMENT FINISHER TENDER; CARPENTER TENDER; ALL OTHER TENDERS NOT LISTED; PORTABLE WATER PUMP WITH DISCHARGE UP TO 3""; WIREMESH; FIRE PREVENTION; FIRE WATCH; FIRE STOP TEND | $30.47 | $19.20 | IN20260003 |
| LABORERSGROUP 4 DYNAMITE MAN (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $33.97 | $19.20 | IN20260003 |
| LABORERSGROUP 3 PLASTERER TENDER; MASON TENDER; MORTAR MIXER; WELDER (ACETYLENE OR ELECTRIC); CUTTING TORCH OR BURNER; CEMENT GUN OPERATOR; SCAFFOLD BUILDER (WHEN WORKING FOR PLASTERER OR MASON) (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $33.47 | $19.20 | IN20260003 |
| LABORERSGROUP 2 WATERPROOFING; HANDLING OF CREOSOTE LUMBER OR LIKE TREATED MATERIAL (EXCLUDING RAILROAD MATERIAL); ASPHALT RAKER & LUTEMAN; KETTLEMAN; HANDLING AND REMOVAL HAZARDOUS MATERIALS DAMAGING TO CLOTHING; AIR TOOL OPERATOR; VIBRATOR; CHIPPING HAMMER OPERATOR AND ALL PNEUMATIC TOOL OPERATOR AND EARTH COMPACTOR; JACK MAN & SHEETING MAN WORKING IN DITCHES 6 FEET IN DEPTH OR DEEPER; LABORERS WORKING DITCHES SIX (6) FEET IN DEPTH OR DEEPER; ASSEMBLY OF UNICRETE PUMP; CHAIN SAW OPERATOR; WATER LINE L | $31.07 | $19.20 | IN20260003 |
| MARBLE, TILE & TERRAZZO FINISHER(EVANSVILLE POSEY, VANDERBURGH AND WARRICK COUNTIES) | $22.09 | $16.34 | IN20260003 |
| MARBLE, TILE & TERRAZZO WORKERS(EVANSVILLE POSEY, VANDERBURGH AND WARRICK COUNTIES) | $28.49 | $16.46 | IN20260003 |
| MILLWRIGHT, ZONE 1(POSEY, VANDERBURGH AND WARRICK COUNTIES)MILLWRIGHT, ZONE 1 (POSEY, VANDERBURGH AND WARRICK COUNTIES) | $36.30 | $28.37 | IN20260003 |
| MILLWRIGHT, ZONE 2(GIBSON, GREENE AND SULLIVAN COUNTIES)MILLWRIGHT, ZONE 2 (GIBSON, GREENE AND SULLIVAN COUNTIES) | $35.00 | $29.33 | IN20260003 |
| PAINTERSSPRAY, SANDBLAST, POWER TOOLS, WATERBLAST & STEAM CLEANING (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $32.12 | $21.20 | IN20260003 |
| PAINTERSBRUSH & ROLLER (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $31.12 | $21.20 | IN20260003 |
| PAINTERSDRYWALL FINISHERS (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $31.87 | $21.20 | IN20260003 |
| PAINTERSDRYWALL & PAPER HANGERS (WITH TOOLS) (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $33.20 | $15.55 | IN20260003 |
| PAINTERSSPRAY & POT MAN (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $32.20 | $15.55 | IN20260003 |
| PAINTERSSANDBLASTING (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $34.20 | $15.55 | IN20260003 |
| PAINTERSBRUSH & ROLLER (CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES) FOOTNOTE A: $1.00 PREMIUM FOR WORK ON STRUCTURES OVER 40 FT. ABOVE FLOOR/GROUND LEVEL $2.00 PREMIUM FOR WORK ON STRUCTURES OVER 100 FT ABOVE FLOOR/GROUND LEVEL | $31.20 | $15.55 | IN20260003 |
| PLASTERERAREA #46 (CLAY, GIBSON, GREENE, OWEN, PARKE, POSEY, PUTNAM, SULLIVAN, VANDERBURGH, VERMILLION, VIGO AND WARRICK COUNTIES) | $31.50 | $18.32 | IN20260003 |
| PLUMBERS AND PIPEFITTERS(REMAINING COUNTIES) | $46.42 | $21.33 | IN20260003 |
| PLUMBERS AND PIPEFITTERS(CLAY, GREENE, PARKE, PUTNAM (PART), SULLIVAN, VERMILLION AND VIGO COUNTIES) | $46.65 | $21.95 | IN20260003 |
| PLUMBERS AND PIPEFITTERS(PUTNAM COUNTY (EAST OF ROAD 43 EXCEPT TERRITORY ON A EAST MILE RADIUS FROM THE COURT HOUSE)) | $50.05 | $20.39 | IN20260003 |
| POWER EQUIPMENT OPERATORSGROUP B AIR COMPRESSOR (1 OR MORE, 600 CFM AND OVER), AIR COMPRESSOR WITH THROTTLE VALVE, BITUMINOUS DISTRUBTOR, BRAKEMAN, BULLFLOAT, CEMENT GUN, CONCRETE MIXER, CONCRETE MIXER, CONCRETE SAW, CONCRETE SPREADER OR PUDDLERS, CONVEYOR, DECK HAND OILER, DECK ENGINE, DRILL HELPER, EARTH ROLLER, ELECTRIC VIBRATOR COMPACTOR (EARTH OR ROCK), ELEVATOR (IN-PLANT, AUTOMATIC), FINISHING MACHINE, FIREMAN, FORM GRADER, GENERATOR, GUARD-RAIL DRIVER, HEATER, OILER, INDUSTRIAL TYPE FORKLIFT (9,000 LBS AND UNDER) | $35.30 | $19.60 | IN20260003 |
| POWER EQUIPMENT OPERATORSGROUP A A-FRAME WINCH TRUCK, ARTICULATING DUMP, AUTOGRADE (CMI), AUTO PATROL, BALLAST REGULATOR (RR), BATCHER PLANT (ELECTRICAL CONTROL CONCRETE), BENDING MACHINE (PIPE), BITUMINOUS PLANT (ENGINEER), BITUMINOUS PLANT, BITUMINOUS MIXER TRAVEL PLANT, BITUMINOUS PAVER, BITUMINOUS ROLLER, BORING MACHINE, BUCK HOIST, BULL DOZER, CABLE WAY, CHICAGO BOOM, CHIMNEY HOIST, CLAMSHELL, CONCRETE MIXER (21 CU. FT. OR OVER), CONCRETE PAVER, CONCRETE PUMP (CRETE), CONSTRUCTION ELEVATOR (ALLMAC OR SIMILAR) CRANE | $43.43 | $19.60 | IN20260003 |
| POWER EQUIPMENT OPERATORSGROUP 1 POWER CRANES, DRAGLINES, DERRICKS, SHOVELS, GRADALLS, MECHANICS, TRACTOR HIGHLIFT, TOURNADOZER, CONCRETE MIXERS WITH SKIP, TOURNAMIXER, TWO-DRUM MACHINE, ONE-DRUM HOIST WITH TOWER OR BOOM, CABLEWAYS, TOWER MACHINES, MOTOR PATROL, BOOM TRACTOR, BOOM OR WINCH TRUCK, WINCH OR HYDRAULIC BOOM TRUCK, TRUCK CRANE, TOURNAPULL, TRACTOR OPERATING SCOOPS, BULLDOZER, PUSH TRACTOR, ASPHALT PLANER, FINISHING MACHINE ON ASPHALT, LARGE ROLLERS ON EARTH, ROLLERS ON ASPHALT MIX, ROSS CARRIER OR SIMILAR MA | $33.90 | $23.00 | IN20260003 |
| POWER EQUIPMENT OPERATORSGROUP 2 CONCRETE MIXERS WITHOUT SKIPS, ROCK CRUSHER, DITCHING MACHINE UNDER 6', CURBING MACHINE, ONE DRUM MACHINES WITHOUT TOWER OR BOOM, AIR TUGGER, SELF-PROPELLED CONCRETE SAW, MACHINE-MOUNTED POST HOLE DIGGER, TWO TO FOUR GENERATORS, WATER PUMPS, OR WELDING MACHINES WITHIN 400 FT., AIR COMPRESSOR 600 CU. FT. AND UNDER, ROLLERS ON AGGREGATE AND SEAL COAT SURFACES, FORK LIFTS (WHEN USED FOR LANDSCAPING WORK, CONCRETE AND BLACKTOP CURB MACHINE, FARM TRACTOR WITH LESS THAN HALF YARD BUCKET, ONE W | $26.75 | $23.00 | IN20260003 |
| ROOFER(CLAY, GREENE, OWEN, PARKE, SULLIVAN, VERMILLION AND VIGO COUNTIES) | $30.00 | $18.30 | IN20260003 |
| ROOFERSCOMPOSITION (REMAINING COUNTIES) | $31.60 | $19.43 | IN20260003 |
| ROOFERSSLATE & TILE (REMAINING COUNTIES) | $31.60 | $19.43 | IN20260003 |
| ROOFERS(PUTNAM COUNTY) | $32.00 | $16.61 | IN20260003 |
| SHEET METAL WORKER HVAC DUCT WORK(CLAY, GREENE, OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) | $39.53 | $22.92 | IN20260003 |
| SHEET METAL WORKER HVAC DUCT WORK(GIBSON, POSEY, VANDERBURGH, AND WARRICK COUNTIES) | $40.19 | $27.33 | IN20260003 |
| SPRINKLER FITTER | $44.20 | $27.88 | IN20260003 |
| TERRAZZO FINISHER(BLOOMINGTON OWEN COUNTY) | $25.33 | $14.19 | IN20260003 |
| TERRAZZO WORKER/SETTER(BLOOMINGTON OWEN COUNTY) | $37.97 | $18.06 | IN20260003 |
| TILE & MARBLE FINISHER(BLOOMINGTON OWEN COUNTY) | $25.33 | $14.19 | IN20260003 |
| TILE, MARBLE SETTER(BLOOMINGTON OWEN COUNTY) | $37.22 | $18.05 | IN20260003 |
| TRUCK DRIVERSGROUP 4 DRIVERS ON HEAVY EQUIPMENT OVER SIXTEEN (16) CU.YDS. OR TWENTY-FOUR TON, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNAROCKERS OR SIMILAR EQUIPMENT WEN USED FOR TRANSPORTATION PURPOSES, POLE TRAILERS OVER SIX (6) WHEELS, WATER PULLS, LOW-BOY TRAILERS TANDEM AXLES, QUAD AXLE OR MORE NO-WEIGHT LIMITATION, DISEAL AND/OR HEAVY EQUIPMENT MECHANICS WHEN WORKING ON EQUIPMENT OPERATED BY EMPLOYEES WITH THIS BARGAINING UNIT. (CLAY, GREENE OWEN, | $33.52 | $0.42 | IN20260003 |
| TRUCK DRIVERSGROUP 5 MECHANIC FURNISHING HIS OWN TOOLS. (CLAY, GREENE OWEN, PARKE, PUTNAM, SULLIVAN, VERMILLION, AND VIGO COUNTIES) A: $36.40 PER DAY & 450.00 PER WEEK | $34.02 | $0.42 | IN20260003 |
| TRUCK DRIVERSGROUP 3 KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, SEMI- TRAILER WATER TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, TOURNAROCKERS, TRACTOR TRAILERS, TANDEMS Q FRAME WINCH TRUCKS, HYDROLIFT TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES, MIXER TRUCKS OVER SIX AND ONE-HALF (6 1/2) CU.YDS. BATCH TRUCKS WET OR DRY OVER 4-""34-E"" BATCHES SINGLE AXLE LOW BOY TRAILERS, AND CONTRACTOR'S MECHANICS WHEN WORKING ON EQUIPMENT OPERATED BY EMPLOYEES WITHIN THIS BARGAIN | $33.37 | $0.42 | IN20260003 |
| TRUCK DRIVERSGROUP 1 SINGLE AXLE TRUCKS SEVEN (7) CU.YDS. OR LESS THAN TEN AND 0NE-HALF (10 1/2) TONS, DUMPSTERS, SCOOP-MOBILES FIVE (5) CU. YDS. AND UNDER OR LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS, MIXER TRUCKS THREE (3) CU.YDS. AND UNDER, AIR COMPRESSORS AND WELDING MACHINES, INCLUDING THOSE PULLED BY SEPARATE UNITS, BATCH TRUCKS-WET OR DRY-2""34-E BATCHES OR LESS, TRUCK DRIVER HELPERS, WAREHOUSEMEN, MECHANIC'S HELPERS, GREASERS AND TIREMEN, ALL PICK-UP TRUCKS AND OTHER VEHICLES. DRIVERS ON DUMPSTERS OR | $32.67 | $0.42 | IN20260003 |
| TRUCK DRIVERSGROUP 2 DRIVERS ON TANDEM AXLE EIGHTEEN (18) CU.YDS.OR TWENTY- FOUR (24) TONS GROSS, SIX (6) WHEEL TRUCKS, KOEHRING OR SIMILAR DUMPSTERS, TRACT TRUCKS, EUCLIDS, HUG BOTTOM DUMPS, TOURNAPULLS, TOURNATRAILERS, TOURNAROCKERS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES UNDER NINE (9) CU.YDS. OR LESS THAN THIRTEEN AND ONE-HALF (13 1/2) TONS, TANDEMS AND SEMI-TRAILER SERVICE TRUCKS, MIXER TRUCKS OVER THREE (3) CU. YDS. AND INCLUDING SIX AND ONE-HALF (6 1/2) CU.YDS., FORK LIFT, FOUR (4) | $33.17 | $0.42 | IN20260003 |
| TRUCK DRIVERSGROUP 1 PICKUP TRUCKS, WINCH TRUCKS, WAREHOUSEMAN, MECHANIC, STREET SWEEPERS, SINGLE AXLE TRUCKS (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $27.08 | $21.52 | IN20260003 |
| TRUCK DRIVERSGROUP 2 TANDEM TRUCKS OR DUMP TRUCKS; FARM TRACTOR PULLING TRAILER; BITUMINOUS DISTRIBUTORS, PAVEMENT BREAKERS (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $27.54 | $21.52 | IN20260003 |
| TRUCK DRIVERSGROUP 3 MIXER TRUCKS, ALL TYPES; LOWBOYS, ALL TYPES; SEMI- TRUCKS, ALL TYPES; ALL TRI-AXLE DUMP TRUCKS; ARTICULATED END DUMPS; END DUMPS; HEAVY EQUIPMENT TYPE WATER WAGONS; HAZARDOUS WASTE WAREHOUSEMAN; HAZARDOUS WASTE DRIVER; AND DRIVERS ON EQUIPMENT WHEN NOT SELF-LOADED OR PUSHER LOADED, SUCH AS KOEHRING OR SIMILAR DUMPSTERS, TRACK TRUCKS, EUCLID BOTTOM DUMP AND HUG BOTTOM DUMP, TOURNATRAILERS, TOURNAROCKERS OR SIMILAR EQUIPMENT. (GIBSON, POSEY, VANDERBURGH AND WARRICK COUNTIES) | $27.76 | $21.52 | IN20260003 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.