DOL marked wage determination IL20260014 modified July 30, 2026 (revision 2). Verify against the source below before filing.
DOL modified the wage determination for heavy work in Fulton County, IL within the last 30 days. The active federal wage determinations covering heavy construction in Fulton County, IL list 67 classifications with published rates, base pay from $0.02 to $58.58 per hour. The determination was last modified July 30, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| CABLE SPLICER(MERCER COUNTY (EXCEPT OHIO GROVE, NORTH HENDERSON, AND SUEZ TWPS)) | $47.00 | $28.64 | IL20260014 |
| CARPENTER(HENDERSON AND MERCER COUNTIES) | $38.00 | $35.16 | IL20260014 |
| CARPENTER(STARK COUNTY) | $40.28 | $38.95 | IL20260014 |
| CARPENTER(FULTON AND TAZEWELL (SOUTHERN 2/3) COUNTIES) | $36.16 |
Across the 67 published classifications for heavy work in Fulton County, IL, base pay spans $0.02 to $58.58 per hour with a median of $38.03.
The governing determination was modified July 30, 2026, within the last 30 days. Contractors mid-bid in Fulton County should re-check figures against the determination text before submitting.
100% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example IL20260018 Mod dated July 30, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov August 1, 2026. The wage determination incorporated into your contract is the legally operative document.
| $30.07 |
| IL20260014 |
| CARPENTER(FULTON, KNOX, PEORIA, AND TAZEWELL (NORTHERN 1/3) COUNTIES) | $36.16 | $30.07 | IL20260014 |
| CARPENTER(MCDONOUGH AND WARREN COUNTIES) | $37.66 | $28.57 | IL20260014 |
| CARPENTER(HANCOCK COUNTY) | $35.05 | $28.57 | IL20260014 |
| CEMENT MASON/CONCRETE FINISHER(FULTON (NORTHWESTERN PART), KNOX, MERCER (SOUTHEASTERN CORNER), AND WARREN COUNTIES) | $35.38 | $27.31 | IL20260014 |
| CEMENT MASON/CONCRETE FINISHER(STARK COUNTY) | $36.70 | $22.08 | IL20260014 |
| CEMENT MASON/CONCRETE FINISHER(FULTON (EXCEPT NORTHWEST PART), PEORIA, AND TAZEWELL COUNTIES) | $32.98 | $30.70 | IL20260014 |
| CEMENT MASON/CONCRETE FINISHER(HANCOCK, HENDERSON (SOUTHERN HALF), AND MCDONOUGH COUNTIES) | $28.64 | $24.57 | IL20260014 |
| CEMENT MASON/CONCRETE FINISHER(HENDERSON (NORTHERN HALF) AND MERCER (EXCEPT SOUTHEASTERN CORNER) COUNTIES) | $28.52 | $24.04 | IL20260014 |
| day per employee for medical b. Eight paid holidaysA thru H | $29.68 | $7.61 | IL20260018 |
| DREDGING(FIREMAN, OILER, DECKHAND, & SCOWMAN (WITH DIPPER, HYDRAULIC OR OTHER FLOATING EQUIPMENT ENGAGED IN HYDRAULIC AND DIPPER DREDGING OPERATIONS) PIPELINE MEN (BOTH AFLOAT & ASHORE INCLUDING LOADING, UNLOADING, MAINTAINING, AND HANDLING PIPELINES FOR HYDRAULIC DREDGES AND SANDBOATS RANGEMAN, TANKERMAN, SWEEPMAN AND SERVICE TRUCK DRIVER) | $22.51 | $7.61 | IL20260018 |
| DREDGING(LEAD DECKHAND) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a | $30.10 | per | IL20260018 |
| DREDGINGLEVERMEN AND BOATMAN (AREA 4: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS:) | $44.78 | $34.21 | IL20260019 |
| DREDGINGOILER/DECKHAND: AREA 1: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS FOOTNOTE: All classifications of work performed in the Chicago District of the Army Corps of Engineers shall receive 5% above all current established wage rates, including those rates to which other premiums are applicable | $38.57 | $31.75 | IL20260019 |
| DREDGINGOILER/DECKHAND: AREA 2: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS FOOTNOTE: All classifications of work performed in the Chicago District of the Army Corps of Engineers shall receive 5% above all current established wage rates, including those rates to which other premiums are applicable | $36.59 | $31.75 | IL20260019 |
| DREDGINGOILER/DECKHAND: AREA 3: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS FOOTNOTE: All classifications of work performed in the Chicago District of the Army Corps of Engineers shall receive 5% above all current established wage rates, including those rates to which other premiums are applicable | $36.59 | $31.75 | IL20260019 |
| DREDGINGOILER/DECKHAND: AREA 4: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS FOOTNOTE: Licensed boat operators/pilot shall receive 10% above the current established Group 1 rate (AREA 4 ONLY) FOOTNOTE: All classifications of work performed in the Chicago District of the Army Corps of Engineers shall receive 5% above all current established wage rates, including those rates to which other premiums are applicable | $37.65 | $34.21 | IL20260019 |
| DREDGINGENGINEER AND MECHANIC (AREA III: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS) | $47.70 | $31.75 | IL20260019 |
| DREDGINGENGINEER AND MECHANIC (AREA II: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) | $47.70 | $31.75 | IL20260019 |
| DREDGINGENGINEER AND MECHANIC (AREA IV: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. PAUL, ROCK ISLAND AND CHICAGO DISTRICTS, CORPS OF ENGINEERS) | $44.78 | $34.21 | IL20260019 |
| DREDGINGLEVERMEN AND BOATMAN (AREA 3: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE HUNTINGTON DISTRICT, CORPS OF ENGINEERS:) | $55.54 | $31.75 | IL20260019 |
| DREDGINGLEVERMEN AND BOATMAN (AREA 4: LEVERMAN. OPERATORS ON BACKHOES OVER 130,000 LBS., OPERATORS ON CRANES OVER 165 TONS, AND OPERATORS THAT ARE REQUIRED TO HAVE A LICENSE OR CERTIFICATION TO DO THE WORK ASSIGNED THEM SHALL RECEIVE 5% MORE THAN THE HIGHEST RATE OF PAY PER HOUR LISTED ON THIS AGREEMENT.) | $47.02 | $34.21 | IL20260019 |
| DREDGINGLEVERMEN AND BOATMAN (AREA 1: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) | $55.69 | $31.75 | IL20260019 |
| DREDGINGENGINEER AND MECHANIC (AREA I: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE ST. LOUIS DISTRICT, CORPS OF ENGINEERS) | $47.83 | $31.75 | IL20260019 |
| DREDGINGLEVERMEN AND BOATMAN (AREA 2: WITHIN THE GEOGRAPHICAL JURISDICTION OF THE LOUISVILLE DISTRICT, CORPS OF ENGINEERS) | $55.54 | $31.75 | IL20260019 |
| Eight paid holidaysA thru H | $22.51 | $7.61 | IL20260018 |
| ELECTRICIAN(FULTON (FAIRVIEW, FARMINGTON, JOSHUA, CANTON, ORION, PUTNAM, BUCKHEART, BANNER, FARMERS, BERNADOTTE, LEWISTOWN, LIVERPOOL, VERMONT, PLEASANT, ISABEL, WATERFORD, ASTORIA, WOODLAND, AND KERTON TWPS), PEORIA, STARK (WEST JERSEY, ESSEX, AND VALLEY TWPS), & TAZEWELL COUNTIES) | $36.51 | $21.19 | IL20260014 |
| ELECTRICIAN(FULTON (CASS, DEERFIELD, ELLISVILLE, HARRIS, LEE, UNION, YOUNG, & HICKORY TWPS), HENDERSON, KNOX, MCDONOUGH (BLANDINSVILLE, PRAIRIE CITY, EMMET, TENNESEE, SCOTLAND, SCIOTA, BUSHNELL, CHALMERS TWPS), MERCER (OHIO GROVE, NORTH HENDERSON, AND SUEZ TWPS), AND WARREN COUNTIES) | $38.32 | $24.24 | IL20260014 |
| ELECTRICIAN(MERCER COUNTY (EXCEPT OHIO GROVE, NORTH HENDERSON, AND SUEZ TWPS)) | $46.00 | $28.56 | IL20260014 |
| employee for medical b. Eight paid holidaysA thru H | $26.49 | $7.61 | IL20260018 |
| HYDRAULIC DREDGINGTUG WORKERS: FIREMAN, LINEMAN, OILER, DECKHAND, TANKERMAN. SCOWMAN, (ON/OR WITH TUGBOATS, LAUNCHES, OR OTHER SELF-PROPELLED BOATS) PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a | $30.10 | per day per employee for medical b. | IL20260018 |
| HYDRAULIC DREDGINGTUG ENGINEER PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a | $26.49 | $7.61 | IL20260018 |
| HYDRAULIC DREDGINGTUG OPERATOR - VESSEL OVER 800 HORSE-POWER PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a | $30.10 | per day per | IL20260018 |
| HYDRAULIC DREDGINGLAUNCH OPERATOR - VESSEL 800 HORSE- POWER OR LESS PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: a | $30.10 | per | IL20260018 |
| IRONWORKER(FULTON COUNTY (SOUTHERN TIP INCLUDING MARBLETOWN ASTORIA, & SUMMUM TWPS)) | $37.60 | $32.94 | IL20260014 |
| IRONWORKER(KNOX (GALESBURG AND AREA NORTH THEREOF), MERCER (EXCEPT SOUTHWEST PART), AND WARREN (NORTHWEST PART) COUNTIES) | $38.25 | $32.28 | IL20260014 |
| IRONWORKER(FULTON (EASTERN 2/3), KNOX (SOUTH AND EAST OF GALESBURG), PEORIA, STARK, AND TAZEWELL COUNTIES) | $45.48 | $34.13 | IL20260014 |
| IRONWORKER(FULTON (NORTH OF SUMMUM & MARBLETOWN TWPS, WEST 1/3), HANCOCK, HENDERSON, KNOX (WEST AND SOUTHWEST OF GALESBURG), MCDONOUGH, MERCER, AND WARREN (EXCEPT NORTHWEST PART) COUNTIES) | $36.30 | $25.80 | IL20260014 |
| LABORERGROUP 2 SKILLED LABORER - JACKHAMMER & DRILL OPERATOR; GUNITE PUMP AND POT MAN; PUDDLERS, VIBRATOR MEN; WIRE FABRIC PLACER; SANDBLAST PUMP AND POT MAN; STRIKE OFF CONCRETE; UNLOADING, HANDLING AND CARRYING OF ALL CREOSOTED PILES, TIES, OR TIMER; CONCRETE BURNING BARS; POWER WHEELBARROWS OR BUGGIES; ASPHALT RAKER; BRICKSETTERS; CUTTING TORCHMEN (ELEC. AND ACETYLENE); MEN SETTING LINES TO LEVEL FORMS; FORM SETTERS; GUNITE NOZZLE MAN AND SANDBLASTING NOZZLE MAN; POWDER MAN; RIP-RAPPING (BY HAND) (P | $37.62 | $38.14 | IL20260014 |
| LABORERGROUP 1 GENERAL LABORER - LAYING OF TEMPORARY GAS, OIL, AIR, AND WATER LINES; ALL LABORER WORK PERTAINING TO ASPHALT AND ASPHALT PLANTS IF NEEDED; WATERPROOFING MEMBRANE SYSTEMS FOR BRIDGE DECKS AND WATERPROOFING FOR BOX CULVERTS ON SITE; LAYING, PLACING, AND INSTALLATION OF ALL STEEL CASING, CORRUGATED CASINGS, MULTIPLE PLATE AND PRECAST CONCRETE AND ALL OTHER MATERIAL USED FOR CASING, TUNNELS AND TUNNEL LINING; REMOVAL OF SNAP TIES, THE PLACING AND REMOVING AND TENDING OF BARRICADES, CONCRETE | $37.32 | $38.14 | IL20260014 |
| LABORER(FULTON AND TAZEWELL (SOUTHEAST) COUNTIES) | $38.50 | $33.45 | IL20260014 |
| LABORER(HANCOCK AND MCDONOUGH COUNTIES) | $33.50 | $30.13 | IL20260014 |
| LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED BELOW(STARK COUNTY (EAST)) | $39.17 | $28.01 | IL20260014 |
| LABORER GROUP 1 FLAGMAN, DUMPMAN, SPOTTER, BROOM MAN, REMOVAL OF TREES, FENCING LABORERS, CLEANING OF FORMS OR LUMBER(IN BONE YARD), MOVING AND/OR MAINTENANCE OF FLARES AND BARRICADES, OPERATION OF ALL HAND, ELECTRIC, AIR, HYDRAULIC, OR MECHANICALLY POWERED TOOLS UNDER THE JURISDICTION OF THE LABORERS; INCLUDING JACKHAMMERS, TAMPERS; AIR SPADES, AUGERS, CONCRETE SAWS, CHAINS SAWS, UTILITY SAWS, ROCK DRILLS, VIBRATORS, MORTAR MIXER, POWER AND HAND SAW (WHEN CLEANING TIMBER), GENERAL LABORERS (NOT ELSEWHERE COVERED), CRAFT-TENDER, MATERIAL CHECKER, MATERIAL HANDLER, FORM HANDLER, CONCRETE DUMPER, PUDDLER, EXPLOS | $33.77 | $23.60 | IL20260014 |
| LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN(POWDERMAN) HEAD STRING OR WIRELINE MAN (ON PAVING), PIPE SETTER ON SEWER OR WATER MAIN, GUNNITE NOZZIE MAN, ASPHALT OR CONCRETE CURB MACHINE OPERATOR, HEAD GRADE MAN, HEAD TUNNEL MINER, CONCRETE BURNING MACHINE OPERATOR, CORING MACHINE OPERATOR, WELDER, ASBESTOS ABATEMENT AND HAZARDOUS WASTE WORKERS (MERCER COUNTY) | $34.27 | $23.60 | IL20260014 |
| LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; AND LEAD BASE PAINT WORKER(STARK COUNTY (EAST)) | $40.17 | $28.01 | IL20260014 |
| LABORER GROUP 3 ABESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER(INCLUDING MAINTAINING OF MANIFEST SHEET); LEAD BASE PAINT ABATEMENT WORKER (PEORIA AND TAZEWELL (NORTHWEST) COUNTIES) | $38.07 | $38.14 | IL20260014 |
| LABORER GROUP 3 CONCRETE SPECIALIST(MERCER COUNTY) | $34.90 | $23.60 | IL20260014 |
| LABORERSSKILLED LABORER: FLAGGERS; TRAFFIC CONTROL AND ALL ASSOCIATED WORK; HANDLING OF MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR CLOTHING; TRACK LABORERS; CHLORIDE HANDLERS; UNLOADING AND LABORERS WITH STEEL WORKERS AND RE-BARS; CONCRETE WORKERS (WET); BATCH DUMPERS; MASON TENDERS; KETTLE AND TAR MEN; PLASTIC INSTALLERS; SCAFFOLD WORKERS; MOTORIZED BUGGIES OR MOTORIZED UNIT USED FOR WET CONCRETE OR HANDLING OF BUILDING MATERIALS; LABORERS WITH DE-WATERING | $36.23 | $28.10 | IL20260014 |
| LABORERSGENERAL LABORER: ALL CLASSIFICATIONS NOT LISTED BELOW. (HENDERSON, KNOX, WARREN, AND STARK (WEST) COUNTIES) | $35.23 | $28.10 | IL20260014 |
| LINE CONSTRUCTIONGROUNDMAN/EQUIPMENT OPERATOR (ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $52.63 | $24.35 | IL20260014 |
| LINE CONSTRUCTIONGROUNDMAN/TRUCK DRIVER (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $39.92 | $20.22 | IL20260014 |
| LINE CONSTRUCTIONLINEMAN AND SUBSTATION TECHNICIAN (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $58.58 | $26.29 | IL20260014 |
| LINE CONSTRUCTIONLINEMAN, TECHNICIAN, HEAVY EQUIPMENT OPERATOR (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $52.67 | $24.38 | IL20260014 |
| LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $36.15 | $18.93 | IL20260014 |
| LINE CONSTRUCTIONGROUNDMAN (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $34.64 | $18.43 | IL20260014 |
| LINE CONSTRUCTIONDYNAMITER (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $43.92 | $21.49 | IL20260014 |
| LINE CONSTRUCTIONCABLE SPLICER (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $53.12 | $24.53 | IL20260014 |
| LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR(MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) | $41.61 | $20.73 | IL20260014 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $57.50 | $36.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: ILLINOIS) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanic | $73.95 | $51.10 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: INDIANA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanica | $57.90 | $43.80 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: MICHIGAN) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechanic | $53.00 | $33.02 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: MINNESOTA) Class I - Master Mechanic - assist and direct PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classifications of work listed under mechani | $57.80 | $29.50 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $56.00 | $36.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $65.20 | $35.75 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $65.75 | $33.40 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $67.40 | $33.55 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $54.25 | $16.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $55.95 | $16.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $53.00 | $24.21 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS I (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $57.15 | $30.38 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: ILLINOIS) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Le | $72.45 | $51.10 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $52.75 | $16.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $63.70 | $35.75 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $54.50 | $36.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MINNESOTA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *L | $56.30 | $29.50 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: MICHIGAN) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Le | $51.50 | $33.02 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $64.25 | $33.40 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $55.65 | $30.38 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $51.50 | $24.21 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: INDIANA) Class II-A Crane/Backhoe Operator, 70 Ton or over Tug Operator, Mechanic/Welder, assistant engineer(hydraulic dredge), leverman (hydraulic dredge), diver tender PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Lev | $56.40 | $43.80 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $54.45 | $16.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-A (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $65.90 | $33.55 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $55.75 | $16.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: INDIANA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classif | $59.40 | $43.80 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $54.50 | $24.21 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $68.90 | $33.55 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MINNESOTA) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the class | $59.30 | $29.50 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $67.25 | $33.40 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: ILLINOIS) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classi | $75.45 | $51.10 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $58.65 | $30.38 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $66.70 | $35.75 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $57.45 | $16.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS II-B (FLOATING EQUIPMENT: MICHIGAN) Class II-B Friction, Lattice Boom, or any Crane Certifications PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. Hazardous/Toxic Waste Material: *Level A $2.50 per hour *Level B 2.00 per hour *Level C 1.00 per hour *Level D 0.50 per hour Such wages shall be above the classi | $54.50 | $33.02 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: ILLINOIS) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight pa | $67.95 | $51.10 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: INDIANA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight pai | $51.90 | $43.80 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: MINNESOTA) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight p | $51.80 | $29.50 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: MICHIGAN) Class III - Deck Equipment Operator (Machineryman) Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 pounds or more), Tug/launch operator, Loader/dozer and like equipment on Barge, breakwater wall, slip/dock, Scow, Deck Machinery, etc. PAID HOLIDAYS (WHERE APPLICABLE): A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight pa | $47.00 | $33.02 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $61.40 | $33.55 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $50.00 | $36.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $59.20 | $35.75 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $59.75 | $33.40 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $48.25 | $16.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $49.95 | $16.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $47.00 | $24.21 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS III (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $51.15 | $30.38 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: ILLINOIS) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. | $63.45 | $51.10 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: INDIANA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. H | $47.40 | $43.80 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MICHIGAN) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. | $42.50 | $33.02 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: MINNESOTA) Class IV - Deck Equipment Operator(Machineryman/Fireman) (Four equipment units or more) Off Road Trucks, Deck Hand, Tug Engineer and Crane Maintenance 50 ton capacity and under or Backhoe weighing 115,000 pounds or less, assistant tug operator. PAID HOLIDAYS: A- NEW YEAR'S DAY B- MEMORIAL DAY C- INDEPENDENCE DAY D- LABOR DAY E- THANKSGIVING DAY F- CHRISTMAS DAY G- PRESIDENT'S DAY H- VETERANS DAY. FOOTNOTES: b. Eight paid holidays: A thru H c. | $47.30 | $29.50 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(ALBANY, HERKIMER, MONTGOMERY, SARATOGA AND SCHENECTADY COUNTIES)) | $56.90 | $33.55 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(MONROE, ONTARIO AND WAYNE COUNTIES AND THE CITY OF ROCHESTER)) | $54.70 | $35.75 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CATTARAUGUS, CHAUTAUGA, ERIE, NIAGARA AND ORLEANS COUNTIES)) | $45.50 | $36.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: NEW YORK:(CAYUGA, JEFFERSON, MADISON, ONEIDA, OSWEGO AND ST. LAWRENCE COUNTIES)) | $55.25 | $33.40 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(ASHTABULA, CUYAHOGA, ERIE,LAKE, AND LORAIN COUNTIES)) | $45.45 | $16.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: OHIO:(LUCAS, HENRY, OTTAWA, WOOD AND SANDUSKY COUNTIES)) | $43.75 | $16.81 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: PENNSYLVANIA:(ERIE COUNTY):) | $42.50 | $24.21 | IL20260018 |
| MECHANIC(UNDEFINED): CLASS IV (FLOATING EQUIPMENT: WISCONSIN:INCLUDES ALL MARINE/FLOATING TYPE WORK ON PROJECTS IN THE SUPERIOR/DULUTH HARBOR, LAKE SUPERIOR.) | $46.65 | $30.38 | IL20260018 |
| OPERATORPOWER EQUIPMENT, GROUP 2 ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES; BOOM TRACTOR OR SIDE BOOM; BORING MACHINE (DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING HOIST (1,2 OR 3 DRUMS); CAISSON AUGURING MACHINES; CENTRAL REDI-MIX PLANT; CHIP SPREADER; CLEANING & PRIMING MACHINE; COMBINATION BACKHOE FRONT END LOADER; COMBINATION CONCRETE FINISHING MACH | $41.50 | $41.25 | IL20260014 |
| OPERATORPOWER EQUIPMENT, GROUP 4 AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT); WATER PUMP (MORE THAN ONE WELL POINT PUMP). (MERCER COUNTY) | $37.80 | $41.25 | IL20260014 |
| OPERATORPOWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB. CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH MACHINE (UNDER 40 H.P.). (MERCER COUNTY) | $38.85 | $41.25 | IL20260014 |
| OPERATORPOWER EQUIPMENT, GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (MERCER COUNTY) | $43.50 | $41.25 | IL20260014 |
| OPERATORPOWER EQUIPMENT, GROUP 1 CRANES: OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE BACKFILLER; TOWER CRANES-MOBILE, CRAWLER, STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLINES; DROTT YUMBO & SIMILAR TYPES CONSIDERED AS CRANES; 360 DEGREES SWING EXCAVATOR, BACKHOE; DERRICK BOATS; PILE DRIVER AND SKID RIGS; CLAM SHELL; LOCOMOTIVE CRANES; ROAD PAVERS (SINGLE DRUM, DUAL DRUM, TRI BATCHER); MOTOR PATROL & POWER BLADES (DUNMORE, ELEVATING & SIMILAR TYPES); MECHANICS; CENTRAL CONCRETE MIXING PLANT OPERATO | $0.02 | $0.00 | IL20260014 |
| OPERATORPOWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM GRADER; BULK CEMENT PLANT; OILERS. (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) - ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WA | $0.02 | PER HOUR, | IL20260014 |
| OPERATORPOWER EQUIPMENT, GROUP 2 BULKER & PUMP; POWER LAUNCHES; BORING MACHINE & PIPE JACKING MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A BORING MACHINE; P-H ONE PASS SOIL CEMENT MACHINES AND SIMILAR TYPES: WHEEL TRACTOR; BACK FILLERS; EUCLID LOADER; FORK LIFTS; JEEP WITH DITCHING MACHINES OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC CEMENT & GRAVEL BATCHING PLANTS; MOBILE DRILLS SOIL TESTING AND SIMILAR TYPES); PUGMILL WITH PUMP; ALL 1 AND 2 DRUM HOISTS; DE-WATERING SYSTEMS; STRAW BLOWER; HYDRO SEED | $0.02 | $0.00 | IL20260014 |
| PAINTERBRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | $40.00 | $26.90 | IL20260014 |
| PAINTERBRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES) | $40.00 | $26.90 | IL20260014 |
| PAINTERBRIDGES (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES) | $32.00 | $17.37 | IL20260014 |
| PAINTERBRUSH AND ROLLER (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES) | $30.00 | $17.37 | IL20260014 |
| PAINTERSPRAY, STRUCTURAL STEEL, & SANDBLASTING (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES) | $30.50 | $17.37 | IL20260014 |
| PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATELATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIA | $47.79 | $43.42 | IL20260014 |
| PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOMCRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD $3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO THE APPROPRIATE GROUP RATE | $38.03 | $43.42 | IL20260014 |
| PILEDRIVERMAN(FULTON, KNOX, PEORIA, AND TAZEWELL (NORTHERN 1/3) COUNTIES) | $36.16 | $30.07 | IL20260014 |
| PILEDRIVERMAN(MCDONOUGH AND WARREN COUNTIES) | $37.66 | $28.57 | IL20260014 |
| PILEDRIVERMAN(HANCOCK COUNTY) | $35.05 | $28.57 | IL20260014 |
| TRUCK DRIVER,GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (MERCER COUNTY) | $45.35 | $25.72 | IL20260014 |
| TRUCK DRIVER,GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $43.24 | $24.27 | IL20260014 |
| TRUCK DRIVER, GROUP 2(MERCER COUNTY) | $45.93 | $25.72 | IL20260014 |
| TRUCK DRIVER, GROUP 2(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $43.83 | $24.27 | IL20260014 |
| TRUCK DRIVER, GROUP 3(MERCER COUNTY) | $46.25 | $25.72 | IL20260014 |
| TRUCK DRIVER, GROUP 3(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $44.10 | $24.27 | IL20260014 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS.(MERCER COUNTY) | $46.60 | $25.72 | IL20260014 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS.(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $44.49 | $24.27 | IL20260014 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK.(MERCER COUNTY) | $47.71 | $25.72 | IL20260014 |
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK.(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $45.59 | $24.27 | IL20260014 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.