CEMENT MASON/CONCRETE FINISHER leads the highway schedule for Kootenai County, ID at $40.89 base plus $18.64 fringe. The active federal wage determination covering highway construction in Kootenai County, ID lists 32 classifications with published rates, base pay from $19.99 to $40.89 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| CARPENTER(FORM WORK ONLY) | $26.24 | $9.48 | ID20260096 |
| CARPENTER, EXCLUDES FORM WORK | $23.92 | $9.75 | ID20260096 |
| CEMENT MASON/CONCRETE FINISHER(ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICECEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 |
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
With 32 classifications carrying published rates, this is a comparatively deep schedule; most trades a highway project needs appear without a conformance request.
Most rate lines here carry SU or state-adopted identifiers, meaning they come from wage surveys rather than negotiated agreements. Survey rates change less often but can jump when a new survey publishes.
A wage determination is cited as number plus modification, for example ID20260096 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $18.64 |
| ID20260096 |
| ELECTRICIAN | $26.97 | $12.10 | ID20260096 |
| HIGHWAY/PARKING LOT STRIPINGPAINTER | $25.47 | $9.52 | ID20260096 |
| LABORERPIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICELABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | ID20260096 |
| LABORERGRADE CHECKER | $20.64 | $7.37 | ID20260096 |
| LABORERMASON TENDER - CEMENT/CONCRETE | $23.07 | $10.00 | ID20260096 |
| LABORERCOMMON OR GENERAL | $22.86 | $9.54 | ID20260096 |
| LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.40 | $9.72 | ID20260096 |
| OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.78 | $11.50 | ID20260096 |
| OPERATORROLLER | $25.12 | $11.76 | ID20260096 |
| OPERATORROLLER (FINISHING) | $25.77 | $11.64 | ID20260096 |
| OPERATORSCREED | $26.06 | $11.56 | ID20260096 |
| OPERATORROLLER (SUBGRADE) | $19.99 | $7.99 | ID20260096 |
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $25.88 | $11.62 | ID20260096 |
| OPERATORBOBCAT/SKID STEER/SKID LOADER | $25.18 | $11.55 | ID20260096 |
| OPERATORBROOM/SWEEPER | $23.34 | $8.48 | ID20260096 |
| OPERATORCRANE | $23.53 | $9.55 | ID20260096 |
| OPERATORFORKLIFT | $23.13 | $9.17 | ID20260096 |
| OPERATORGRADER/BLADE | $26.06 | $11.64 | ID20260096 |
| OPERATORLOADER | $26.06 | $11.76 | ID20260096 |
| OPERATORMECHANIC | $23.55 | $8.54 | ID20260096 |
| OPERATOROILER | $22.25 | $6.52 | ID20260096 |
| POWER EQUIPMENT OPERATORGROUP 8 BULLDOZER | $37.58 | $16.10 | ID20260096 |
| TRAFFIC CONTROLFLAGGER | $20.76 | $9.40 | ID20260096 |
| TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $21.64 | $9.40 | ID20260096 |
| TRUCK DRIVERLOWBOY TRUCK | $26.61 | $13.21 | ID20260096 |
| TRUCK DRIVEROIL DISTRIBUTOR TRUCK | $23.93 | $11.27 | ID20260096 |
| TRUCK DRIVERWATER TRUCK | $23.14 | $11.72 | ID20260096 |
| TRUCK DRIVERDUMP (6 YDS AND UNDER) | $36.58 | $20.93 | ID20260096 |
| TRUCK DRIVERDUMP (OVER 6 YDS) | $37.02 | $20.93 | ID20260096 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.