DOL marked wage determination IA20260001 modified July 30, 2026 (revision 2). Verify against the source below before filing.
Rates on this page changed recently: the governing determination carries a modification dated July 30, 2026. The active federal wage determination covering highway construction in Scott County, IA lists 24 classifications with published rates, base pay from $28.05 to $47.71 per hour. The determination was last modified July 30, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| CABLE SPLICER | $47.00 | $28.56 | IA20260001 |
| CARPENTER | $34.67 | $31.94 | IA20260001 |
| CEMENT MASON/CONCRETE FINISHER(SCOTT COUNTY) | $33.12 | $28.39 | IA20260001 |
| ELECTRICIAN | $46.00 | $28.56 | IA20260001 |
Across the 24 published classifications for highway work in Scott County, IA, base pay spans $28.05 to $47.71 per hour with a median of $37.65.
The governing determination was modified July 30, 2026, within the last 30 days. Contractors mid-bid in Scott County should re-check figures against the determination text before submitting.
100% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example IA20260001 Mod dated July 30, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov August 1, 2026. The wage determination incorporated into your contract is the legally operative document.
| IRONWORKER |
| $37.50 |
| $30.99 |
| IA20260001 |
| LABORERSGROUP 3 (SCOTT COUNTY) CONCRETE SPECIALIST (ALL WORK RELATING TO BUT NOT LIMITED TO POURING, STRIKING OF & FINISHING ALL CONCRETE SURFACES) | $34.90 | $23.60 | IA20260001 |
| LABORERSGROUP 1 (SCOTT COUNTY) FLAGMAN; DUMPMAN; SPOTTER; BROOM MAN; LANDSCAPER; PLANTING & REMOVAL OF TREES; FENCING LABORERS; CLEANING OF FORMS OR LUMBER (IN BONE YARD); LAYING OF SOD; MOVING AND/OR MAINTENANCE OF FLARES & BARRICADES; OPERATION OF ALL HAND, ELECTRIC, AIR, HYDRAULIC OR MECHANICALLY POWERED TOOLS UNDER THE THE LABORERS' INCLUDING JACKHAMMER, TAMPER, AIR SPADE, AUGER, CONCRETE SAW, CHAIN SAW, UTILITY SAW, ROCK DRILL, VIBRATOR; MORTAR MIXER; POWER & HAND SAW (WHEN CLEARING TIMBER); GENERA | $33.77 | $23.60 | IA20260001 |
| LABORERSGROUP 2 (SCOTT COUNTY) ASPHALT RAKER OR LUTEMAN; PIPE SETTER ON SEWER OR WATER MAIN; GUNNITE NOZZLE MAN; ASPHALT OR CONCRETE CURB MACHINE OPERATOR; CONCRETE BURNING MACHINE OPERATOR; & CORING MACHINE OPERATOR; HAZARDOUS WASTE WORKER; ASBESTOS ABATEMENT WORKER | $34.27 | $23.60 | IA20260001 |
| MILLWRIGHT | $39.31 | $29.89 | IA20260001 |
| PAINTERSSIGN PAINTERS | $28.05 | $19.05 | IA20260001 |
| PAINTERSELEVATED TANKS, BRIDGES, STACKS FLAG POLES, MFG, VESSELS (INTERIOR AND EXTERIOR SURFACES | $33.32 | $19.05 | IA20260001 |
| PAINTERSSPRAY, STRUCTURAL STEEL AND SANDBLASTING, INDUSTRIAL | $31.82 | $19.05 | IA20260001 |
| PAINTERSDRYWALL TAPER | $31.82 | $19.05 | IA20260001 |
| PAINTERSBRUSH & ROLLER | $31.32 | $19.05 | IA20260001 |
| PILEDRIVERMAN | $34.67 | $31.94 | IA20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 3: ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB. CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH MACHINE (UNDER 40 H.P.) | $38.85 | $41.25 | IA20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 1: CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT | $43.50 | $41.25 | IA20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 2: ASPHALT HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE; BACKFILLER (THROW BUCKET); BLASTHOLER SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES; BOOM TRACTOR OR SIDE BOOM; BORING MACHINE (DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING HOIST (1,2 OR 3 DRUMS); CAISSON AUGURING MACHINES; CENTRAL REDI-MIX PLANT; CHIP SPREADER; CLEANING & PRIMING MACHINE; COMBINATION BACKHOE FRONT END LOADER; COMBINATION CONCRETE FINISHING MACHINE AND FLOAT; | $41.50 | $41.25 | IA20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 4: AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT); WATER PUMP (MORE THAN ONE WELL POINT PUMP) | $37.80 | $41.25 | IA20260001 |
| TRUCK DRIVERSGROUP 1 (SCOTT COUNTY) DRIVERS ON 2 AXLE TRUCKS HAULING LESS THAN 9 TONS , AIR COMPRESSOR AND WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS, WAREHOUSEMEN, GREASERS AND TIREMEN, PICK- UP-TRUCKS WHEN HAULING MATERIAL, TOOLS OR MEN TO AND FROM AND ON THE JOB SITE, AND FORKLIFTS UP TO 6,000 LB CAPACITY FOOTNOTE: A. PENSION: $52.80 PER DAY | $45.35 | $16.11 | IA20260001 |
| TRUCK DRIVERSGROUP 2- 2 OR 3 AXLE TRUCKS HAULING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS. A-FRAME WINCH TRUCKS, OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES. FORKLIFTS OVER 6,000 LB CAPACITY, WINCH TRUCKS, FOUR AXLE COMBINATION UNITS, HYDROLIFT TRUCKS, VACTOR TRUCKS OR SIMIOLAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES. FOOTNOTE: PENSION: $52.80 PER DAY IN ADDITIONAL FRINGE BENEFITS | $45.93 | $16.11 | IA20260001 |
| TRUCK DRIVERSGROUP 3- 2, 3, AND 4 AXLES HAULING 16 TONS OR MORE, WATER PULLS, 5 AXLES OR MORE COMBINATION UNITS, WATER PULLS, ARTICULATED DUMP TRUCKS FOOTNOTE: PENSION: $52.80 PER DAY IN ADDITIONAL FRINGE BENEFITS | $46.25 | $16.11 | IA20260001 |
| TRUCK DRIVERSGROUP 5 (SCOTT COUNTY) DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK FOOTNOTE: A. PENSION: $52.80 PER DAY | $47.71 | $16.11 | IA20260001 |
| TRUCK DRIVERSGROUP 4 (SCOTT COUNTY) OIL DISTRIBUTORS, LOWBOYS FOOTNOTE: A. PENSION: $52.80 PER DAY | $46.60 | $16.11 | IA20260001 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.