DIVER leads the residential schedule for Kauai County, HI at $81.72 base plus $35.68 fringe. The active federal wage determination covering residential construction in Kauai County, HI lists 132 classifications with published rates, base pay from $9.33 to $81.72 per hour. The determination was last modified May 27, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS.) | $46.90 | $29.75 | HI20260001 |
| BOILERMAKER | $49.37 | $31.25 | HI20260001 |
| BRICKLAYERPOINTERS, CAULKERS AND WEATHERPROOFERS | $48.28 | $32.23 | HI20260001 |
| BRICKLAYERS AND STONEMASONS |
Across the 132 published classifications for residential work in Kauai County, HI, base pay spans $9.33 to $81.72 per hour with a median of $58.21.
The most recent modification to the governing determination is dated May 27, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
98% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example HI20260001 Mod dated May 27, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| $48.03 |
| $32.23 |
| HI20260001 |
| CARPENTERS(CARPENTERS; HARDWOOD FLOOR LAYERS; PATENT SCAFFOLD ERECTORS (14 FT. AND OVER); PILEDRIVERS; PNEUMATIC NAILERS; WOOD SHINGLERS AND TRANSIT AND/OR LAYOUT MAN) | $55.50 | $29.81 | HI20260001 |
| CARPENTERSMILLWRIGHTS AND MACHINE ERECTORS | $55.75 | $29.81 | HI20260001 |
| CARPENTERSPOWER SAW OPERATORS (2 H.P. AND OVER) | $55.65 | $29.81 | HI20260001 |
| CEMENT MASONS | $44.12 | $33.63 | HI20260001 |
| CEMENT MASONSTROWEL MACHINE OPERATORS | $44.27 | $33.63 | HI20260001 |
| DIVER(AQUA LUNG) (SCUBA) (up to 30 feet) | $72.35 | $35.68 | HI20260001 |
| DIVEROTHER THAN AQUA LUNG | $81.72 | $35.68 | HI20260001 |
| DIVER(AQUA LUNG) (SCUBA) (over 30 feet) | $81.72 | $35.68 | HI20260001 |
| DIVER TENDEROTHER THAN AQUA LUNG | $59.94 | $35.68 | HI20260001 |
| DRAPERY INSTALLER | $13.60 | $1.20 | HI20260001 |
| DREDGING(BOAT OPERATORS): BOAT OPERATOR | $60.15 | $35.68 | HI20260001 |
| DREDGING, DERRICKS: GROUP 4: DECKHAND, FIREMAN, OILER | $57.94 | $35.68 | HI20260001 |
| DREDGING, DERRICKS: GROUP 3: DECKMATE; SAURMAN TYPE DRAGLINE (UP TO AND INCLUDING 5 YARDS). | $59.60 | $35.68 | HI20260001 |
| DREDGING, DERRICKS: GROUP 2: SAURMAN TYPE DRAGLINE (OVER 5 CUBIC YARDS). | $60.00 | $35.68 | HI20260001 |
| DREDGING, DERRICKS: GROUP 1: OPERATORS (DERRICKS, PILEDRIVERS AND CRANES). | $60.66 | $35.68 | HI20260001 |
| DREDGING, CLAMSHELL OR DIPPER DREDGING: GROUP 4: BARGEMAN; DECKHAND; FIREMAN; OILER. HYDRAULIC SUCTION DREDGING CLASSIFICATIONS | $57.94 | $35.68 | HI20260001 |
| DREDGING, CLAMSHELL OR DIPPER DREDGING: GROUP 3: BARGE MATE; DECKMATE | $59.60 | $35.68 | HI20260001 |
| DREDGING, CLAMSHELL OR DIPPER DREDGING: GROUP 2: MECHANIC OR WELDER; WATCH ENGINEER | $60.00 | $35.68 | HI20260001 |
| DREDGING, CLAMSHELL OR DIPPER DREDGING: GROUP 1: CLAMSHELL OR DIPPER OPERATOR | $60.66 | $35.68 | HI20260001 |
| DREDGING(BOAT OPERATORS): MASTER BOAT OPERATOR | $60.30 | $35.68 | HI20260001 |
| DREDGING(BOAT OPERATORS): BOAT DECKHAND | $57.94 | $35.68 | HI20260001 |
| DREDGING, HYDRAULIC SUCTION DREDGES: GROUP 7: DECKHAND (CAN OPERATE ANCHOR SCOW UNDER DIRECTION OF DECKMATE); FIREMAN; LEVEEMAN; OILER | $57.94 | $35.68 | HI20260001 |
| DREDGING, HYDRAULIC SUCTION DREDGES: GROUP 6: WINCHMAN (STERN WINCH ON DREDGE) | $59.49 | $35.68 | HI20260001 |
| DREDGING, HYDRAULIC SUCTION DREDGES: GROUP 5: DECKMATE. | $59.60 | $35.68 | HI20260001 |
| DREDGING, HYDRAULIC SUCTION DREDGES: GROUP 4: DOZER OPERATOR. | $59.94 | $35.68 | HI20260001 |
| DREDGING, HYDRAULIC SUCTION DREDGES: GROUP 3: MECHANIC OR WELDER. | $60.00 | $35.68 | HI20260001 |
| DREDGING, HYDRAULIC SUCTION DREDGES: GROUP 2: WATCH ENGINEER (STEAM OR ELECTRIC). | $60.15 | $35.68 | HI20260001 |
| DREDGING, HYDRAULIC SUCTION DREDGES: GROUP 1: LEVERMAN. | $60.30 | $35.68 | HI20260001 |
| DRYWALL AND ACOUSTICAL WORKERS AND LATHERS | $55.75 | $29.81 | HI20260001 |
| ELECTRICIANS | $56.55 | $33.16 | HI20260001 |
| ELECTRICIANSTELECOMMUNICATION WORKER | $41.00 | $16.28 | HI20260001 |
| ELECTRICIANSCABLE SPLICERS | $63.90 | $33.38 | HI20260001 |
| ELEVATOR MECHANIC A. VACATIONEMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $73.85 | $38.44 | HI20260001 |
| FENCE ERECTOR(CHAIN LINK FENCE) | $9.33 | $1.65 | HI20260001 |
| GLAZIERS | $48.50 | $40.20 | HI20260001 |
| HELICOPTER WORKPILOT OF HELICOPTER | $62.83 | $35.68 | HI20260001 |
| HELICOPTER WORKCO-PILOT OF HELICOPTER | $61.66 | $35.68 | HI20260001 |
| HELICOPTER WORK, AIRBORNE HOIST OPERATOR FOR HELICOPTER | $61.52 | $35.68 | HI20260001 |
| IRONWORKERS A. EMPLOYEES WILL BE PAID $.50 PER HOUR MORE WHILE WORKING INTUNNELS AND COFFER DAMS; $1.00 PER HOUR MORE WHEN REQUIRED TO WORK UNDER OR ARE COVERED WITH WATER (SUBMERGED) AND WHEN THEY ARE REQUIRED TO WORK ON THE SUMMIT OF MAUNA KEA, MAUNA LOA OR HALEAKALA | $50.50 | $43.46 | HI20260001 |
| LABORERSMASON TENDER/HOD CARRIER | $42.25 | $25.96 | HI20260001 |
| LABORERSWINDOW WASHER (BOSUN CHAIR) | $41.25 | $25.96 | HI20260001 |
| LABORERSPOWDERMAN | $42.75 | $25.96 | HI20260001 |
| LABORERSFINAL CLEAN UP | $31.40 | $21.37 | HI20260001 |
| LABORERSDRILLER | $44.75 | $25.96 | HI20260001 |
| LABORERSGUNITE/SHOTCRETE OPERATOR AND HIGH SCALER | $42.25 | $25.96 | HI20260001 |
| LANDSCAPE & IRRIGATION LABORERSGROUP 2 LAYOUT OF IRRIGATION AND OTHER NON-POTABLE IRRIGATION WATER SYSTEMS AND THE LAYOUT OF DRINKING FOUNTAINS AND OTHER POTABLE IRRIGATION WATER SYSTEMS IN CONNECTION WITH SUCH LANDSCAPING AND IRRIGATION WORK. THIS INCLUDES THE LAYOUT OF ALL HEADS, RISERS, VALVES, VALVE BOXES, VACUUM BREAKERS, LOW VOLTAGE ELECTRICAL LINES, HYDRAULIC AND ELECTRICAL CONTROLLERS, AND METALLIC (COPPERS, BRASS, GALVANIZED, OR SIMILAR) PIPE, AS WELL AS PVC OR OTHER PLASTIC PIPE. THIS WORK ALSO INCLUDES THE READING | $29.40 | $17.15 | HI20260001 |
| LANDSCAPE & IRRIGATION LABORERS, GROUP 1INSTALLATION OF NON-POTABLE PERMANENT OR TEMPORARY IRRIGATION WATER SYSTEMS PERFORMED FOR THE PURPOSES OF LANDSCAPING AND IRRIGATION ARCHITECTURAL HORTICULTURAL WORK; THE INSTALLATION OF DRINKING FOUNTAINS AND PERMANENT OR TEMPORARY IRRIGATION SYSTEMS USING POTABLE WATER FOR LANDSCAPING AND IRRIGATION ARCHITECTURAL HORTICULTURAL PURPOSES ONLY. THIS WORK INCLUDES (A) THE INSTALLATION OF ALL HEADS, RISERS, VALVES, VALVE BOXES, VACUUM BREAKERS (PRESSURE AND NON-PRESSURE), LOW VOLTAGE ELECTRICAL LIN | $28.40 | $17.15 | HI20260001 |
| LANDSCAPE & IRRIGATION LABORERS,GROUP 2LAYOUT OF IRRIGATION AND OTHER NON-POTABLE IRRIGATION WATER SYSTEMS AND THE LAYOUT OF DRINKING FOUNTAINS AND OTHER POTABLE IRRIGATION WATER SYSTEMS IN CONNECTION WITH SUCH LANDSCAPING AND IRRIGATION WORK. THIS INCLUDES THE LAYOUT OF ALL HEADS, RISERS, VALVES, VALVE BOXES, VACUUM BREAKERS, LOW VOLTAGE ELECTRICAL LINES, HYDRAULIC AND ELECTRICAL CONTROLLERS, AND METALLIC (COPPERS, BRASS, GALVANIZED, OR SIMILAR) PIPE, AS WELL AS PVC OR OTHER PLASTIC PIPE. THIS WORK ALSO INCLUDES THE READING AND INTE | $29.40 | $17.15 | HI20260001 |
| LANDSCAPE & IRRIGATION LABORERS, GROUP 3MAINTENANCE OF TREES, SHRUBS, GROUND COVERS, LAWNS AND OTHER PLANTED AREAS, INCLUDING THE REPLANTING OF TREES, SHRUBS, GROUND COVERS, AND OTHER PLANTINGS THAT DID NOT ""TAKE"" OR WHICH ARE DAMAGED; PROVIDED, HOWEVER, THAT RE-PLANTING THAT REQUIRES THE USE OF EQUIPMENT, MACHINERY, OR POWER TOOLS SHALL BE PAID FOR AT THE RATE OF PAY SPECIFIED UNDER LANDSCAPE AND IRRIGATION LABORER, GROUP 1; RAKING, MOWING, TRIMMING, AND RUNING, INCLUDING THE USE OF ""WEED EATERS"", HEDGE TRIMMERS, VACUUMS, BLOWERS | $23.00 | $17.15 | HI20260001 |
| LINE CONSTRUCTIONLINEMEN | $56.55 | $33.16 | HI20260001 |
| LINE CONSTRUCTIONCABLE SPLICERS | $63.90 | $33.38 | HI20260001 |
| LINE CONSTRUCTIONGROUNDMEN/TRUCK DRIVERS | $42.41 | $27.14 | HI20260001 |
| LINE CONSTRUCTIONTELECOMMUNICATION WORKER | $41.00 | $16.28 | HI20260001 |
| LINE CONSTRUCTIONHEAVY EQUIPMENT OPERATORS | $50.90 | $30.75 | HI20260001 |
| PAINTERSBRUSH | $44.05 | $30.05 | HI20260001 |
| PAINTERSSANDBLASTER; SPRAY | $44.05 | $30.05 | HI20260001 |
| PLASTERER | $46.12 | $34.53 | HI20260001 |
| PLUMBER, PIPEFITTER, STEAMFITTER & SPRINKLER FITTER | $53.83 | $33.19 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 10: CHICAGO BOOM; COLD PLANERS; HEAVY DUTY REPAIRMAN OR WELDER; HOIST AND/OR WINCH (3 DRUMS); HYDRAULIC SKOOPER (KOEHRING AND SIMILAR); LOADER (OVER 6 CU. YDS. UP TO AND INCLUDING 12 CU. YDS.); SAURMAN TYPE DRAGLINE (OVER 5 CU. YDS.); SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 20 CU. YDS. UP TO AND INCLUDING 31 CU. YDS.) (637D AND SIMILAR); SOIL STABILIZER (P & H OR EQUAL); SUB-GRADER (GURRIES OR OTHER AUTOMATIC TYPE); TRACTORS (D-9 OR EQUIVALENT, ALL ATTACHMENTS); TRACTOR | $60.00 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 10A: BOAT OPERATOR; CABLE-OPERATED CRAWLER CRANE (UP TO AND INCLUDING 25 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (UP TO AND INCLUDING 1 CU. YD.); DOZER D9-L; DOZER (D-10, HD41 AND SIMILAR) (ALL ATTACHMENTS); GRADALL (UP TO AND INCLUDING 1 CU. YD.); HYDRAULIC BACKHOE (OVER 3/4 CU. YDS. UP TO AND INCLUDING 2 CU. YDS.); MOBILE TRUCK CRANE OPERATOR (UP TO AND INCLUDING 25 TONS) (MOBILE TRUCK CRANE DRIVER REQUIRED); SELF-PROPELLED BOOM TYPE LIFTING DEVICE (CENTER M | $60.15 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 6: BOOM TRUCK OR DUAL PURPOSE ""A""FRAME TRUCK (OVER 5 TONS); COMBINATION LOADER/BACKHOE (UP TO AND INCLUDING 3/4 CU. YD.); CONCRETE BATCH PLANTS (WET OR DRY); CONCRETE CUTTER, GROOVER AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); CONVEYOR OR CONCRETE PUMP (TRUCK OR EQUIPMENT MOUNTED); DRILLING MACHINERY (NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACK HAMMERS); FORK LIFT (OVER 10 TONS); LOADER (UP TO AND INCLUDING 3 AND 1/2 CU. YDS); LULL HIGH LIFT ( | $59.17 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 7: CRUSHER PLANT ENGINEER, DOZER (D-4, CASE 450, JOHN DEERE 450, AND SIMILAR); DUAL DRUM MIXER, EXTEND LIFT; HOIST AND/OR WINCH (2 DRUMS); LOADER (OVER 3 AND 1/2 CU. YDS. UP TO AND INCLUDING 6 YARDS.); MECHANICAL FINISHER OR SPREADER MACHINE (ASPHALT), (BARBER GREENE AND SIMILAR) (SCREEDMAN REQUIRED); MINE OR SHAFT HOIST; MOBILE CONCRETE MIXER (OVER 5 TONS); PIPE BENDING MACHINE (PIPELINES ONLY); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); PIPE WRAPPING MACHINE (TRACTOR PROP | $59.49 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 8: ASPHALT PLANT OPERATOR; BARGE MATE (SEAGOING); CAST-IN-PLACE PIPE LAYING MACHINE; CONCRETE BATCH PLANT (MULTIPLE UNITS); CONVEYOR OPERATOR (TUNNEL); DECKMATE; DOZER (D-6 AND SIMILAR); FINISHING MACHINE OPERATOR (AIRPORTS AND HIGHWAYS); GRADESETTER; KOLMAN LOADER (AND SIMILAR); MUCKING MACHINE (CRAWLER-TYPE); MUCKING MACHINE (CONVEYOR-TYPE); NO-JOINT PIPE LAYING MACHINE; PORTABLE CRUSHING AND SCREENING PLANT; POWER BLADE OPERATOR (UNDER 12); SAURMAN TYPE DRAGLINE (UP TO AND INCLUDING 5 | $59.60 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 9A: DOZER (D-8 AND SIMILAR); GRADESETTER (WHEN REQUIRED BY THE CONTRACTOR TO WORK FROM DRAWINGS, PLANS OR SPECIFICATIONS WITHOUT THE DIRECT SUPERVISION OF A FOREMAN OR SUPERINTENDENT); PUSH CAT; SCRAPERS (UP TO AND INCLUDING 20 CU. YDS); SELF-PROPELLED COMPACTOR WITH DOZER; SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (UP TO AND INCLUDING 20 CU. YDS) (621 BAND AND SIMILAR); SHEEP'S FOOT; TRACTOR (D-8 AND SIMILAR); TRACTORS WITH BOOM (LARGER THAN D-6, AND SIMILAR). BOOMS AND/OR LEAD | $59.94 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 9: COMBINATION MIXER AND COMPRESSOR (GUNITE); DO-MOR LOADERAND ADAMS ELEGRADER; DOZER (D-7 OR EQUAL); WHEEL AND/OR LADDER TRENCHER (OVER 6 FEET AND 200 TO 749 H.P.). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 | $59.71 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 5: ASPHALT PLANT FIREMAN; COMPRESSORS, PUMPS, GENERATORS AND WELDING MACHINES (""BANK"" OF 9 OR MORE, INDIVIDUALLY OR COLLECTIVELY); CONCRETE PUMPS OR PUMPCRETE GUNS; LUBRICATION AND SERVICE ENGINEER (GREASE RACK); SCREEDMAN BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 T | $58.52 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 4: BOOM TRUCK OR DUAL PURPOSE ""A"" FRAME TRUCK (5 TONS OR LESS); CONCRETE PLACING BOOM (BUILDING CONSTRUCTION); DINKY OPERATOR; ELEVATOR OPERATOR; HOIST AND/OR WINCH (ONE DRUM); STRADDLE TRUCK (ROSS CARRIER, HYSTER AND SIMILAR). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER | $58.21 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 3: BRAKEMAN; DECKHAND; FIREMAN; OILER; OILER/GRADECHECKER; SIGNALMAN; SWITCHMAN; HIGHLINE CABLEWAY SIGNALMAN; BARGEMAN; BUNKERMAN; CONCRETE CURING MACHINE (SELF-PROPELLED, AUTOMATICALLY APPLIED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); LEVEEMAN; ROLLER (5 TONS AND UNDER); TUGGER HOIST. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECE | $57.94 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 2: CONVEYOR OPERATOR (HANDLING BUILDING MATERIAL); HYDRAULIC MONITOR; MIXER BOX OPERATOR (CONCRETE PLANT). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET | $57.77 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 1: FORK LIFT (UP TO AND INCLUDING 10 TONS); PARTSMAN (HEAVY DUTY REPAIR SHOP PARTS ROOM WHEN NEEDED). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP T | $57.66 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 13: TRUCK DRIVER (UTILITY, FLATBED, ETC.) | $57.94 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 13E: END DUMPS, UNLICENSED (EUCLID, MACK, CATERPILLAR OR SIMILAR); TRACTOR TRAILER (HAULING EQUIPMENT); TANDEM TRUCKS HOOKED UP TO TRAILER (HAULING EQUIPMENT) | $59.60 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 13D: TRUCK DRIVER (SLIP-IN OR PUP) | $59.49 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 13C: TRUCK DRIVER (SEMI-TRAILER. ROCK CANS, SEMI-DUMP OR ROLL-OFFS) | $59.17 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 13B: WATER TRUCK (OVER 2,000 GALLONS); TANDEM DUMP TRUCK, OVER 8 CU. YDS. (WATER LEVEL) | $58.52 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 13A: DUMP TRUCK, 8 CU.YDS. AND UNDER (WATER LEVEL); WATER TRUCK (UP TO AND INCLUDING 2,000 GALLONS) | $58.21 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 12 CLAMSHELL OR DIPPER OPERATOR; DERRICKS; DRILL RIGS; MULTI-PROPULSION EARTHMOVING MACHINES (2 OR MORE SCRAPERS) (OVER 35 CU. YDS ""STRUCK""M.R.C.); OPERATORS (DERRICKS, PILEDRIVERS AND CRANES); POWER SHOVELS AND DRAGLINES (7 CU. YDS. M.R.C. AND OVER); SELF-PROPELLED RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 31 CU. YDS.) (657B AND SIMILAR); WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR); WHEEL EXCAVATOR (OVER 750 CU. YDS. PER HOUR). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE | $60.66 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 12A: DOZER (D-11 OR SIMILAR OR LARGER); HYDRAULIC EXCAVATORS (OVER 4 CU. YDS.); LIFTING CRANES (50 TONS AND OVER); PIONEERING DOZER/BACKHOE (INITIAL CLEARING AND EXCAVATION FOR THE PURPOSE OF PROVIDING ACCESS FOR OTHER EQUIPMENT WHERE THE TERRAIN WORKED INVOLVES 1-TO-1 SLOPES THAT ARE 50 FEET IN HEIGHT OR DEPTH, THE SCOPE OF THIS WORK DOES NOT INCLUDE NORMAL CLEARING AND GRUBBING ON USUAL HILLY TERRAIN NOR THE EXCAVATION WORK ONCE THE ACCESS IS PROVIDED); POWER BLADE OPERATOR (CAT 12 OR | $61.02 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS, GROUP 11: AUTOMATIC SLIP FORM PAVER (CONCRETE OR ASPHALT); BAND WAGON (IN CONJUNCTION WITH WHEEL EXCAVATOR); CABLE-OPERATED CRAWLER CRANES (OVER 25 TONS BUT LESS THAN 50 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (OVER 1 CU. YD. UP TO 7 CU. YDS.); GRADALL (OVER 1 CU. YDS. UP TO 7 CU. YDS.); DW-10, 20, ETC. (TANDEM); EARTHMOVING MACHINES (MULTIPLE PROPULSION POWER UNITS AND 2 OR MORE SCRAPERS) (UP TO AND INCLUDING 35 CU. YDS.,"" STRUCK"" M.R.C.); HIGHLINE CABLEWAY; HYDR | $60.30 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): ASPHALT CONCRETE MATERIAL TRANSFER | $58.67 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): ASPHALT PLANT OPERATOR | $59.07 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): ASPHALT RAKER | $57.68 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): ASPHALT SPREADER OPERATOR | $59.16 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): COLD PLANER | $59.47 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): COMBINATION LOADER/BACKHOE (OVER 3/4 CU.YD.) | $57.68 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): COMBINATION LOADER/BACKHOE (UP TO 3/4 CU.YD.) | $56.70 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): CONCRETE SAWS AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS) | $58.64 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): GRADER | $59.47 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): LABORER, HAND ROLLER | $57.18 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): LOADER (2 1/2 CU. YDS. AND UNDER) | $58.64 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): LOADER (OVER 2 1/2 CU. YDS. TO AND INCLUDING 5 CU. YDS.) | $58.96 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): ROLLER OPERATOR (FIVE TONS AND UNDER) | $57.41 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): ROLLER OPERATOR (OVER FIVE TONS) | $58.84 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): SCREED PERSON | $58.64 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATORS(PAVING): SOIL STABILIZER | $59.47 | $34.86 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 1FORK LIFT (UP TO AND INCLUDING 10 TONS); PARTSMAN (HEAVY DUTY REPAIR SHOP PARTS ROOM WHEN NEEDED). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT NOT I | $57.96 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10CHICAGO BOOM; COLD PLANERS; HEAVY DUTY REPAIRMAN OR WELDER; HOIST AND/OR WINCH (3 DRUMS); HYDRAULIC SKOOPER (KOEHRING AND SIMILAR); LOADER (OVER 6 CU. YDS. UP TO AND INCLUDING 12 CU. YDS.); SAURMAN TYPE DRAGLINE (OVER 5 CU. YDS.); SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 20 CU. YDS. UP TO AND INCLUDING 31 CU. YDS.) (637D AND SIMILAR); SOIL STABILIZER (P & H OR EQUAL); SUB-GRADER (GURRIES OR OTHER AUTOMATIC TYPE); TRACTORS (D-9 OR EQUIVALENT, ALL ATTACHMENTS); TRACTOR (TANDEM SCRA | $60.30 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 10ABOAT OPERATOR; CABLE-OPERATED CRAWLER CRANE (UP TO AND INCLUDING 25 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (UP TO AND INCLUDING 1 CU. YD.); DOZER D9-L; DOZER (D-10, HD41 AND SIMILAR) (ALL ATTACHMENTS); GRADALL (UP TO AND INCLUDING 1 CU. YD.); HYDRAULIC BACKHOE (OVER 3/4 CU. YDS. UP TO AND INCLUDING 2 CU. YDS.); MOBILE TRUCK CRANE OPERATOR (UP TO AND INCLUDING 25 TONS) (MOBILE TRUCK CRANE DRIVER REQUIRED); SELF-PROPELLED BOOM TYPE LIFTING DEVICE (CENTER MOUNT) (UP TO | $60.45 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 11AUTOMATIC SLIP FORM PAVER (CONCRETE OR ASPHALT); BAND WAGON (IN CONJUNCTION WITH WHEEL EXCAVATOR); CABLE-OPERATED CRAWLER CRANES (OVER 25 TONS BUT LESS THAN 50 TONS); CABLE-OPERATED POWER SHOVEL, CLAMSHELL, DRAGLINE AND BACKHOE (OVER 1 CU. YD. UP TO 7 CU. YDS.); GRADALL (OVER 1 CU. YDS. UP TO 7 CU. YDS.); DW-10, 20, ETC. (TANDEM); EARTHMOVING MACHINES (MULTIPLE PROPULSION POWER UNITS AND 2 OR MORE SCRAPERS) (UP TO AND INCLUDING 35 CU. YDS.,"" STRUCK"" M.R.C.); HIGHLINE CABLEWAY; HYDRAULIC BACKHO | $60.60 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12CLAMSHELL OR DIPPER OPERATOR; DERRICKS; DRILL RIGS; MULTI-PROPULSION EARTHMOVING MACHINES (2 OR MORE SCRAPERS) (OVER 35 CU. YDS ""STRUCK""M.R.C.); OPERATORS (DERRICKS, PILEDRIVERS AND CRANES); POWER SHOVELS AND DRAGLINES (7 CU. YDS. M.R.C. AND OVER); SELF-PROPELLED RUBBER-TIRED EARTHMOVING EQUIPMENT (OVER 31 CU. YDS.) (657B AND SIMILAR); WHEEL EXCAVATOR (UP TO AND INCLUDING 750 CU. YDS. PER HOUR); WHEEL EXCAVATOR (OVER 750 CU. YDS. PER HOUR). | $60.96 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 12ADOZER (D-11 OR SIMILAR OR LARGER); HYDRAULIC EXCAVATORS (OVER 4 CU. YDS.); LIFTING CRANES (50 TONS AND OVER); PIONEERING DOZER/BACKHOE (INITIAL CLEARING AND EXCAVATION FOR THE PURPOSE OF PROVIDING ACCESS FOR OTHER EQUIPMENT WHERE THE TERRAIN WORKED INVOLVES 1-TO-1 SLOPES THAT ARE 50 FEET IN HEIGHT OR DEPTH, THE SCOPE OF THIS WORK DOES NOT INCLUDE NORMAL CLEARING AND GRUBBING ON USUAL HILLY TERRAIN NOR THE EXCAVATION WORK ONCE THE ACCESS IS PROVIDED); POWER BLADE OPERATOR (CAT 12 OR EQUIVALENT OR | $61.32 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 2CONVEYOR OPERATOR (HANDLING BUILDING MATERIAL); HYDRAULIC MONITOR; MIXER BOX OPERATOR (CONCRETE PLANT). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO BUT NOT INCLUDING 130 FEET OR LEADS OF 100 FEET UP TO BUT | $58.07 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 3BRAKEMAN; DECKHAND; FIREMAN; OILER; OILER/GRADECHECKER; SIGNALMAN; SWITCHMAN; HIGHLINE CABLEWAY SIGNALMAN; BARGEMAN; BUNKERMAN; CONCRETE CURING MACHINE (SELF-PROPELLED, AUTOMATICALLY APPLIED UNIT ON STREETS, HIGHWAYS, AIRPORTS AND CANALS); LEVEEMAN; ROLLER (5 TONS AND UNDER); TUGGER HOIST. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER H | $58.24 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 4BOOM TRUCK OR DUAL PURPOSE ""A"" FRAME TRUCK (5 TONS OR LESS); CONCRETE PLACING BOOM (BUILDING CONSTRUCTION); DINKY OPERATOR; ELEVATOR OPERATOR; HOIST AND/OR WINCH (ONE DRUM); STRADDLE TRUCK (ROSS CARRIER, HYSTER AND SIMILAR BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN | $58.51 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 5ASPHALT PLANT FIREMAN; COMPRESSORS, PUMPS, GENERATORS AND WELDING MACHINES (""BANK"" OF 9 OR MORE, INDIVIDUALLY OR COLLECTIVELY); CONCRETE PUMPS OR PUMPCRETE GUNS; LUBRICATION AND SERVICE ENGINEER (GREASE RACK); SCREEDMAN. BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN AC | $58.82 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 6BOOM TRUCK OR DUAL PURPOSE ""A""FRAME TRUCK (OVER 5 TONS); COMBINATION LOADER/BACKHOE (UP TO AND INCLUDING 3/4 CU. YD.); CONCRETE BATCH PLANTS (WET OR DRY); CONCRETE CUTTER, GROOVER AND/OR GRINDER (SELF-PROPELLED UNIT ON STREETS, HIGHWAYS, AIRPORTS, AND CANALS); CONVEYOR OR CONCRETE PUMP (TRUCK OR EQUIPMENT MOUNTED); DRILLING MACHINERY (NOT TO APPLY TO WATERLINERS, WAGON DRILLS OR JACK HAMMERS); FORK LIFT (OVER 10 TONS); LOADER (UP TO AND INCLUDING 3 AND 1/2 CU. YDS); LULL HIGH LIFT (UNDER 40 FE | $59.47 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 7CRUSHER PLANT ENGINEER, DOZER (D-4, CASE 450, JOHN DEERE 450, AND SIMILAR); DUAL DRUM MIXER, EXTEND LIFT; HOIST AND/OR WINCH (2 DRUMS); LOADER (OVER 3 AND 1/2 CU. YDS. UP TO AND INCLUDING 6 YARDS.); MECHANICAL FINISHER OR SPREADER MACHINE (ASPHALT), (BARBER GREENE AND SIMILAR) (SCREEDMAN REQUIRED); MINE OR SHAFT HOIST; MOBILE CONCRETE MIXER (OVER 5 TONS); PIPE BENDING MACHINE (PIPELINES ONLY); PIPE CLEANING MACHINE (TRACTOR PROPELLED AND SUPPORTED); PIPE WRAPPING MACHINE (TRACTOR PROPELLED AND S | $59.79 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 8ASPHALT PLANT OPERATOR; BARGE MATE (SEAGOING); CAST-IN-PLACE PIPE LAYING MACHINE; CONCRETE BATCH PLANT (MULTIPLE UNITS); CONVEYOR OPERATOR (TUNNEL); DECKMATE; DOZER (D-6 AND SIMILAR); FINISHING MACHINE OPERATOR (AIRPORTS AND HIGHWAYS); GRADESETTER; KOLMAN LOADER (AND SIMILAR); MUCKING MACHINE (CRAWLER-TYPE); MUCKING MACHINE (CONVEYOR-TYPE); NO-JOINT PIPE LAYING MACHINE; PORTABLE CRUSHING AND SCREENING PLANT; POWER BLADE OPERATOR (UNDER 12); SAURMAN TYPE DRAGLINE (UP TO AND INCLUDING 5 YDS.); STA | $59.90 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 9COMBINATION MIXER AND COMPRESSOR (GUNITE); DO-MOR LOADERAND ADAMS ELEGRADER; DOZER (D-7 OR EQUAL); WHEEL AND/OR LADDER TRENCHER (OVER 6 FEET AND 200 TO 749 H.P.). BOOMS AND/OR LEADS (HOURLY PREMIUMS): THE OPERATOR OF A CRANE (UNDER 50 TONS) WITH A BOOM OF 80 FEET OR MORE (INCLUDING JIB), OR OF A CRANE (UNDER 50 TONS) WITH LEADS OF 100 FEET OR MORE, SHALL RECEIVE A PER HOUR PREMIUM FOR EACH HOUR WORKED ON SAID CRANE (UNDER 50 TONS) IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: BOOMS OF 80 FEET UP TO | $60.01 | $35.68 | HI20260001 |
| POWER EQUIPMENT OPERATOR - TUNNEL WORK, GROUP 9ADOZER (D-8 AND SIMILAR); GRADESETTER (WHEN REQUIRED BY THE CONTRACTOR TO WORK FROM DRAWINGS, PLANS OR SPECIFICATIONS WITHOUT THE DIRECT SUPERVISION OF A FOREMAN OR SUPERINTENDENT); PUSH CAT; SCRAPERS (UP TO AND INCLUDING 20 CU. YDS); SELF-PROPELLED COMPACTOR WITH DOZER; SELF-PROPELLED, RUBBER-TIRED EARTHMOVING EQUIPMENT (UP TO AND INCLUDING 20 CU. YDS) (621 BAND AND SIMILAR); SHEEP'S FOOT; TRACTOR (D-8 AND SIMILAR); TRACTORS WITH BOOM (LARGER THAN D-6, AND SIMILAR). BOOMS AND/OR LEADS (HOURLY PR | $60.24 | $35.68 | HI20260001 |
| ROOFERS(INCLUDING BUILT UP, COMPOSITION AND SINGLE PLY) | $43.15 | $21.21 | HI20260001 |
| SEE LABORERSLABORER I IN FOOTER | $41.75 | $25.96 | HI20260001 |
| SEE LABORERSLABORER II IN FOOTER | $39.15 | $25.96 | HI20260001 |
| SHEET METAL WORKER | $50.16 | $33.32 | HI20260001 |
| SOFT FLOOR LAYERS | $43.27 | $35.18 | HI20260001 |
| STAND-BY DIVEROTHER THAN AQUA LUNG | $62.97 | $35.68 | HI20260001 |
| STAND-BY DIVER(AQUA LUNG) (SCUBA) | $62.97 | $35.68 | HI20260001 |
| TAPER | $47.36 | $32.00 | HI20260001 |
| TILE, MARBLE & TERRAZZO WORKER(TERRAZZO BASE GRINDERS) | $44.69 | $33.00 | HI20260001 |
| TILE, MARBLE & TERRAZZO WORKER(TILE, MARBLE AND TERRAZZO WORKERS) | $46.50 | $33.00 | HI20260001 |
| TILE, MARBLE & TERRAZZO WORKER(TERRAZZO FLOOR GRINDERS AND TENDERS) | $43.14 | $33.00 | HI20260001 |
| UNDERGROUND LABORER, GROUP 1WATCHMEN; CHANGE HOUSE ATTENDANT | $42.35 | $25.91 | HI20260001 |
| UNDERGROUND LABORER, GROUP 2SWAMPER; BRAKEMAN; BULL GANG-MUCKERS, TRACKMEN; DUMPMEN (ANY METHOD); CONCRETE CREW (INCLUDES RODDING AND SPREADING); GROUT CREW; REBOUNDMEN | $43.85 | $25.91 | HI20260001 |
| UNDERGROUND LABORER, GROUP 3CHUCKTENDERS AND CABLETENDERS; POWDERMAN (PRIME HOUSE); VIBRATORMAN, PAVEMENT BREAKERS | $44.35 | $25.91 | HI20260001 |
| UNDERGROUND LABORER, GROUP 4MINERS - TUNNEL (INCLUDING TOP AND BOTTOM MAN ON SHAFT AND RAISE WORK); TIMBERMAN, RETIMBERMAN (WOOD OR STEEL OR SUBSTITUTE MATERIALS THEREOF); BLASTERS, DRILLERS, POWDERMAN (IN HEADING); MICROTUNNEL LABORER; HEADMAN; CHERRY PICKERMAN (WHERE CAR IS LIFTED); NIPPER; GROUT GUNMEN; GROUT PUMPMAN & POTMAN; GUNITE, SHOTCRETE GUNMEN & POTMEN; CONCRETE FINISHER (IN TUNNEL); CONCRETE SCREED MAN; BIT GRINDER; STEEL FORM RAISERS & SETTERS; HIGH PRESSURE NOZZLEMAN; NOZZLEMAN (ON SLICK LINE); SANDBLASTER-PO | $45.35 | $25.91 | HI20260001 |
| UNDERGROUND LABORER, GROUP 5SHAFT WORK & RAISE (BELOW ACTUAL OR EXCAVATED GROUND LEVEL); DIAMOND DRILLER; GUNITE OR SHOTCRETE NOZZLEMAN; RODMAN; GROUNDMAN | $45.70 | $25.91 | HI20260001 |
| UNDERGROUND LABORER, GROUP 6SHIFTER | $45.95 | $25.91 | HI20260001 |
| UNDERGROUND LABORER, GROUP 7SHIFTER (SHAFT WORK & RAISER) | $46.40 | $25.91 | HI20260001 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.