PIPEFITTER leads the building schedule for Grady County, GA at $38.98 base plus $17.01 fringe. The active federal wage determination covering building construction in Grady County, GA lists 30 classifications with published rates, base pay from $9.55 to $38.98 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | GA20260166 |
| CARPENTER, INCLUDES FORM WORK | $15.97 | $1.95 | GA20260166 |
| CEMENT MASON/CONCRETE FINISHER | $11.75 | $0.00 | GA20260166 |
| ELECTRICIANINCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (APPLING, ATKINSON, BACON, CLINCH, COFFEE, & PIERCE COUNTIES) | $33.35 | $13.40 |
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
With 30 classifications carrying published rates, this is a comparatively deep schedule; most trades a building project needs appear without a conformance request.
This schedule mixes sources: 47% of lines carry union identifiers and the rest are survey-based. Two crews on one site can be governed by rates that update on entirely different rhythms.
A wage determination is cited as number plus modification, for example GA20260166 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| ELECTRICIANINCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (CLAY COUNTY) | $38.65 | $12.75 | GA20260166 |
| ELECTRICIANINCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (BERRIEN, COOK, GRADY, SEMINOLE, & THOMAS COUNTIES) | $33.50 | $13.86 | GA20260166 |
| ELECTRICIANINCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (JEFF DAVIS COUNTY) | $32.00 | $14.71 | GA20260166 |
| ELECTRICIANINCLUDING ALARM INSTALLATION AND LOW VOLTAGE WIRING (CALHOUN, COLQUITT, IRWIN, MILLER, MITCHELL, & RANDOLPH COUNTIES) | $29.50 | $14.88 | GA20260166 |
| ELEVATOR MECHANIC | $19.38 | $14.42 | GA20260166 |
| GLAZIER | $13.19 | $0.00 | GA20260166 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | GA20260166 |
| IRONWORKER, STRUCTURAL | $16.75 | $0.00 | GA20260166 |
| LABORERPIPELAYER | $13.33 | $0.00 | GA20260166 |
| LABORERCOMMON OR GENERAL | $9.55 | $0.00 | GA20260166 |
| OPERATOROILER | $12.00 | $0.00 | GA20260166 |
| OPERATORBACKHOE/EXCAVATOR | $15.00 | $0.75 | GA20260166 |
| PAINTERBRUSH, ROLLER AND SPRAY | $16.00 | $1.62 | GA20260166 |
| PIPEFITTERINCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION (CLAY COUNTY) | $30.00 | $16.66 | GA20260166 |
| PIPEFITTERINCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION (ATIKINSON, BERRIEN, CALHOUN, COFFEE, COLQUITT, COOK, GRADY, IRWIN, MILLER, MITCHELL, RANDOLPH, SEMINOLE, & THOMAS COUNTIES) | $38.98 | $17.01 | GA20260166 |
| PIPEFITTERINCLUDING HVAC UNIT AND HVAC ELECTRICAL TEMPERATURE CONTROL INSTALLATION; EXCLUDING HVAC PIPE INSTALLATION (APPLING, BACON, CLINCH, JEFF DAVIS, & PIERCE COUNTIES) | $34.00 | $16.35 | GA20260166 |
| PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $16.38 | $4.56 | GA20260166 |
| PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC UNIT, AND HVAC ELECTRICAL/TEMPERATURE CONTROLS | $18.55 | $3.35 | GA20260166 |
| POWER EQUIPMENT OPERATORCRANE (OVER 10 TONS) | $32.00 | $17.70 | GA20260166 |
| POWER EQUIPMENT OPERATORCRANE (OVER 120 TONS) | $33.00 | $17.70 | GA20260166 |
| POWER EQUIPMENT OPERATORCRANE (OVER 250 TONS) | $34.00 | $17.70 | GA20260166 |
| ROOFER | $13.62 | $0.00 | GA20260166 |
| SHEET METAL WORKEREXCLUDES HVAC DUCT INSTALLATION (APPLING, ATKINSON, BACON, BERRIEN, CLAY, CLINCH, COFFEE, COOK, IRWIN, JEFF DAVIS, MILLER, PIERCE, & SEMINOLE COUNTIES) | $37.75 | $17.95 | GA20260166 |
| SHEET METAL WORKEREXCLUDES HVAC DUCT INSTALLATION (CALHOUN, COLQUITT, GRADY, MITCHELL, RANDOLPH, & THOMAS COUNTIES) | $37.75 | $17.95 | GA20260166 |
| SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $15.09 | $3.53 | GA20260166 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $19.25 | $2.54 | GA20260166 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.