POWER EQUIPMENT OPERATOR leads the residential schedule for Manatee County, FL at $39.01 base plus $16.85 fringe. The active federal wage determination covering residential construction in Manatee County, FL lists 38 classifications with published rates, base pay from $9.00 to $39.01 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BRICKLAYER | $20.00 | $0.00 | FL20260071 |
| CARPENTER, INCLUDES CABINET INSTALLATION(EXCLUDES FORM WORK) | $15.00 | $0.00 | FL20260071 |
| CEMENT MASON/CONCRETE FINISHER | $13.36 | $0.00 | FL20260071 |
| ELECTRICIAN | $13.15 | $0.00 | FL20260071 |
The highest published base on this schedule belongs to POWER EQUIPMENT OPERATOR at $39.01 per hour plus $16.85 fringe; the schedule's median base is $13.15.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
Most rate lines here carry SU or state-adopted identifiers, meaning they come from wage surveys rather than negotiated agreements. Survey rates change less often but can jump when a new survey publishes.
A wage determination is cited as number plus modification, for example FL20260071 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Certified payroll uses the employee's name and an individually identifying number, normally the last four digits of the Social Security number. Full SSNs do not belong on submitted payrolls.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| FORM WORKER |
| $9.50 |
| $0.22 |
| FL20260071 |
| HVAC MECHANIC(INSTALLATION OF HVAC DUCT) | $10.00 | $0.00 | FL20260071 |
| IRONWORKERREINFORCING AND STRUCTURAL | $35.25 | $17.32 | FL20260071 |
| IRONWORKER, ORNAMENTAL | $15.25 | $0.00 | FL20260071 |
| LABORERMASON TENDER - BRICK | $11.51 | $0.00 | FL20260071 |
| LABORERPIPELAYER | $11.33 | $0.00 | FL20260071 |
| LABORERROOF TEAROFF | $9.00 | $0.00 | FL20260071 |
| LABORERCOMMON OR GENERAL | $9.00 | $1.07 | FL20260071 |
| LABORERLANDSCAPE AND IRRIGATION | $9.15 | $0.00 | FL20260071 |
| LABORERMASON TENDER - CEMENT/CONCRETE | $10.33 | $0.00 | FL20260071 |
| OPERATORROLLER | $10.62 | $0.00 | FL20260071 |
| OPERATORTRACTOR | $10.20 | $0.00 | FL20260071 |
| OPERATORTRACKHOE | $14.81 | $0.00 | FL20260071 |
| OPERATORASPHALT PAVER | $12.40 | $0.00 | FL20260071 |
| OPERATORBACKHOE/EXCAVATOR | $14.30 | $0.00 | FL20260071 |
| OPERATORBACKHOE LOADER COMBO | $17.04 | $0.00 | FL20260071 |
| OPERATORBULLDOZER | $15.50 | $2.00 | FL20260071 |
| OPERATORDISTRIBUTOR | $11.41 | $0.00 | FL20260071 |
| OPERATORFORKLIFT | $17.50 | $0.00 | FL20260071 |
| OPERATORGRADER/BLADE | $14.00 | $0.00 | FL20260071 |
| OPERATORLOADER | $12.17 | $0.00 | FL20260071 |
| OPERATORSCREED | $10.93 | $0.00 | FL20260071 |
| PAINTERINCLUDES BRUSH, ROLLER AND SPRAY | $13.09 | $0.00 | FL20260071 |
| PIPEFITTER | $11.25 | $0.00 | FL20260071 |
| PLASTERER | $15.00 | $0.00 | FL20260071 |
| PLUMBER, INCLUDES HVAC PIPE AND HVAC UNIT INSTALLATION | $13.15 | $0.00 | FL20260071 |
| POWER EQUIPMENT OPERATORGROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 | FL20260071 |
| POWER EQUIPMENT OPERATORGROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES. | $38.01 | $16.85 | FL20260071 |
| POWER EQUIPMENT OPERATORGROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 | FL20260071 |
| ROOFERMETAL ROOF | $16.99 | $0.00 | FL20260071 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS(EXCLUDES METAL ROOFS) | $15.65 | $0.00 | FL20260071 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND METAL ROOF INSTALLATION | $9.85 | $0.38 | FL20260071 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $15.63 | $3.00 | FL20260071 |
| TRUCK DRIVER, INCLUDES DUMP AND LOWBOY | $10.63 | $0.00 | FL20260071 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.