ELEVATOR MECHANIC FOOTNOTE leads the building schedule for New London County, CT at $66.72 base plus $38.44 fringe. The active federal wage determination covering building construction in New London County, CT lists 26 classifications with published rates, base pay from $35.70 to $66.72 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BRICKLAYER | $45.56 | $36.94 | CT20260024 |
| CARPENTER(SCAFFOLD BUILDER) | $42.03 | $29.19 | CT20260024 |
| CARPENTER(INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $42.03 | $29.19 | CT20260024 |
| CEMENT MASON/CONCRETE FINISHER | $45.56 | $36.94 |
The highest published base on this schedule belongs to ELEVATOR MECHANIC FOOTNOTE at $66.72 per hour plus $38.44 fringe; the schedule's median base is $45.41.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
100% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example CT20260024 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| DRYWALL FINISHER/TAPER | $40.32 | $26.75 | CT20260024 |
| ELECTRICIAN | $46.48 | $38.05 | CT20260024 |
| ELEVATOR MECHANIC FOOTNOTEA.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $66.72 | $38.44 | CT20260024 |
| FLOOR LAYERCARPET ONLY | $42.03 | $29.19 | CT20260024 |
| HEAT & FROST INSULATOR(INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $48.81 | $33.65 | CT20260024 |
| IRONWORKERREINFORCING, STRUCTURAL, ORNAMENTAL | $45.25 | $43.62 | CT20260024 |
| LABORERCOMMON OR GENERAL | $35.70 | $28.85 | CT20260024 |
| LABORERMASON TENDER-CEMENT/CONCRETE | $35.70 | $28.85 | CT20260024 |
| PAINTERBRUSH AND ROLLER | $39.57 | $26.75 | CT20260024 |
| PIPEFITTER | $50.58 | $35.85 | CT20260024 |
| PLUMBER | $50.58 | $35.85 | CT20260024 |
| POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | CT20260024 |
| POWER EQUIPMENT OPERATORCRANE UNDER 100 TON RATED CAPACITY) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 | CT20260024 |
| POWER EQUIPMENT OPERATORLOADER - 7 CUBIC YARDS OR OVER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 | CT20260024 |
| POWER EQUIPMENT OPERATOR, BULLDOZERROUGH GRADE DOZER PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 | CT20260024 |
| POWER EQUIPMENT OPERATOR, BULLDOZERFINEGRADE (SLOPES, SHAPING, LASER OR GPS, ETC.) PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 | CT20260024 |
| ROOFERCOMPOSITION | $45.15 | $23.53 | CT20260024 |
| ROOFERSLATE AND TILE | $45.65 | $23.53 | CT20260024 |
| SHEET METAL WORKER(METAL FLASHING AND HVAC DUCT INSTALLATION ONLY) | $44.70 | $44.50 | CT20260024 |
| SHEET METAL WORKER | $44.70 | $44.50 | CT20260024 |
| SHEET METAL WORKER(METAL ROOFS INSTALLATION) | $44.70 | $44.50 | CT20260024 |
| TRUCK DRIVERDUMP TRUCK | $36.39 | $32.68 | CT20260024 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.