PAINTERS leads the highway schedule for Hartford County, CT at $59.70 base plus $26.90 fringe. The active federal wage determination covering highway construction in Hartford County, CT lists 67 classifications with published rates, base pay from $21.42 to $59.70 per hour. The determination was last modified May 18, 2026.
Classifications
67
with published rates
Median base
$42.24
per hour
Median fringe
69%
of base pay
Last modified
May 18, 2026
Published rates
Classification
Base
Fringe
WD
BRICKLAYERS, CEMENT MASONS, CEMENT FINISHERS, PLASTERERS, STONE MASONS
Across the 67 published classifications for highway work in Hartford County, CT, base pay spans $21.42 to $59.70 per hour with a median of $42.24.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
100% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
Using these rates
Read the modification number
A wage determination is cited as number plus modification, for example CT20260003 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Put the WD in your bid file
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
Check rates the Friday before payroll
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
Match classifications by duties, not titles
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
Fringe crediting basics
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
Statement of Compliance wording
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Questions
Which wage determination applies to my project in Hartford County?
The wage determination incorporated into your contract is the one that governs, per 29 CFR 1.6. For new highway work in Hartford County, CT, the current active determination is CT20260003. Verify with your contracting officer before bidding or paying.
How often do these rates change?
DOL publishes wage determination modifications weekly, generally on Fridays. The determination behind this page was last modified May 18, 2026.
What is the difference between the base rate and the fringe rate?
The base rate is the minimum hourly wage; the fringe amount is an additional hourly benefit obligation you can meet with bona fide benefit contributions or pay in cash. On this schedule the median fringe is about 69% of base.
My classification is not listed for Hartford County. What do I do?
If the work classification you need is not on the determination, the contractor requests a conformance (additional classification and rate) through the contracting agency using Standard Form 1444. Do not substitute a similar-sounding classification.
What counts as highway construction?
Highway covers roads, streets, runways, and similar paving work not incidental to building, residential, or heavy construction.
Does the federal rate or the Connecticut state prevailing wage apply?
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
DIVER TENDERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS)
CARPENTERSDIVERS (AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS)
CARPENTERS, PILEDRIVERS(AVON, BLOOMFIED, EAST GRANBY, EAST HARTFORD, EAST WINDSOR, ENFIELD, FARMINGTON, GLASTONBURY, GRANBY, HARTFORD, HARTLAND, MANCHESTER, ROCKY HILL, SIMSBURY, SOUTH WINDSOR, SUFFIELD, WEST HARTFORD, WETHERSFIELD, WINDSOR, WINDSOR LOCKS)
IRONWORKERSREINFORCING, STRUCTURAL AND PRECAST CONCRETE ERECTION. PAID HOLIDAY: LABOR DAY PROVIDED EMPLOYEE HAS BEEN ON THE PAYROLL FOR THE 5 CONSECUTIVE WORK DAYS PRIOR TO LABOR DAY
LABORERSGROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE (ON A SITE DESIGNATED AS A SUPERFUND SITE BY THE U.S. ARMY CORPS OF ENGINEERS AND IS DEEMED A HAZ-MAT SITE, AND APPLIES TO EMPLOYEES REQUIRED TO WEAR OSHA LEVAL A OR B EVEN IF THE PPE IS NOT WORN.)
LABORERSTUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY
LABORERSTUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY
LABORERSTUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY
LABORERSTUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY
LABORERSTUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUGE TENDERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY
LABORERSTUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SHAFT AND TUNNEL, STEEL AND RODMEN, SHIELD AND ERECTOR, ARM OPERATOR, CABLE TENDERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WO
LABORERSTUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY
LABORERSTUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY
LABORERSTUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY
LABORERSTUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY
LABORERSTUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. NO EMPLOYEE SHALL BE ELIGIBLE FOR HOLIDAY PAY WHEN HE FAILS, WITHOUT CAUSE, TO WORK THE REGULAR WORK DAY PRECEDING THE HOLIDAY OR THE REGULAR WORK DAY FOLLOWING THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 18 MAINTENANCE ENGINEER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR TONE; HOISTING ENGINEER (2 DRUMS OR OVER). HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT. BOOM (INCLUDING JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGI
POWER EQUIPMENT OPERATORSGROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER($3.00 PREMIUM WHEN OPERATOR CONTROLS HAMMER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER (ALL TYPES OF EQUIPMENT WHERE A DRUM AND CABLE ARE USED TO HOIST OR DRAG MATERIAL REGARDLESS OF MOTIVE POWER OR OPERAING), RUBBER TIRE EXCAVATOR (DROTT 1085 SIMILAR), GRADER OPERATOR, BULLDOZER FINEGRADE (SLOPES SHAPING, LASER OR GPS, ECT) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDA
POWER EQUIPMENT OPERATORSGROUP 2 CRANES (100 TON RATED CAPACITY AND OVER) BAUER DRILL/CAISSON. HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT. BOOM (INCLUDING JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRA
POWER EQUIPMENT OPERATORSGROUP 3 CRANES (UNDER 100 TON RATED CAPACITY). HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH 150 FT. BOOM (INCLUDING JIB): $1.50 EXTRA. CRANE WITH 200 FT. BOOM (INCLUDING JIB): $2.50 EXTRA. CRANE WITH 250 FT. BOOM (INCLUDING JIB): $5.00 EXTRA. CRANE WITH 300 FT. BOOM (INCLUDING JIB): $7.00 EXTRA. CRANE WITH 400 FT. BOOM (INCLUDING JIB); $10.00 EXTRA. 1) CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER(2 DRUMS OR OVER) 2) CRANES(100 TON RATED CAPAC
POWER EQUIPMENT OPERATORSGROUP 4 TRENCHING MACHINES; LIGHTER DERRICK; CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR; KOEHRING LOADER SKOOPER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 5 SPECIALTY RAILROAD EQUIPMENT; ASPHALT SPREADER; ASPHALT RECLAIMING ACHINE; LINE GRINDER; CONCRETE PUMPS; DRILLS WITH SELF CONTAINED POWER UNITS; BORING MACHINE; POST HOLE DIGGER; AUGER; POUNDER; WELL DIGGER; MILLING MACHINE (OVER 24"" MANDRELL); SIDE BOOM; COMBINATION HOE AND LOADER; DIRECTIONAL DRILLER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH
POWER EQUIPMENT OPERATORSGROUP 6 FRONT END LOADER (3 CU. YDS. UP TO 7 CUBIC YARDS); BULLDOZER (ROUGH GRADE DOZER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 7 ASPHALT ROLLER; CONCRETE SAWS AND CUTTERS (RIDE ON TYPES); VERMEER CONCRETE CUTTER; STUMP GRINDER; SCRAPER; SNOOPER; SKIDDER; MILLING MACHINE (24"" AND UNDER MANDREL). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 8 MECHANIC; GREASE TRUCK OPERATOR; HYDROBLASTER; BARRIER MOVER; POWER STONE SPREADER; WELDER; WORK BOAT UNDER 26 FT.; TRANSFER MACHINE. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 9 FRONT END LOADER (UNDER 3 CUBIC YARDS); SKID STEER LOADER (REGARDLESS OF ATTACHMENTS); (BOBCAT OR SIMILAR); FORK LIFT; POWER CHIPPER; LANDSCAPE EQUIPMENT (INCLUDING HYDROSEEDER).VACUUM EXCAVATION TRUCK AND HYDROVAC EXCAVATION TRUCK (27 HG PRESSURE OR GREATER). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHED
POWER EQUIPMENT OPERATORSGROUP 10 VIBRATORY HAMMER, ICE MACHINE, DIESEL AND AIR HAMMER, ETC. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 11 CONVEYOR; EARTH ROLLER; POWER PAVEMENT BREAKER (WHIPHAMMER); ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 12 WELLPOINT OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 13 PORTABLE ASPHALT PLANT OPERATOR; PORTABLE CONCRETE PLANT OPERATOR; PORTABLE CRUSHER PLANT OPERATOR. PORTABLE GROUT PLANT OPERATOR, PORTABLE WATER FILTRATION PLANT OPERATOR A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 14 COMPRESSOR BATTERY OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 15 POWER SAFETY BOAT; VACUUM TRUCK; ZIM MIXER; SWEEPER; (MINIMUM FOR ANY JOB REQUIRING A CDL LICENSE) A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 16 ELEVATOR OPERATOR; TOW MOTOR OPERATOR (SOLID TIRE NO ROUGH TERRAIN). A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 17 GENERATOR OPERATOR; COMPRESSOR OPERATOR; PUMP OPERATOR; WELDING MACHINE OPERATOR; HEATER OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
POWER EQUIPMENT OPERATORSGROUP 19 FRONT END LOADER(7 CUBIC YARDS OR OVER); WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY
TRUCK DRIVERS2 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
TRUCK DRIVERS2 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
TRUCK DRIVERSSPECIALIZED (EARTH MOVING EQUIPMENT OTHER THAN CONVENTIONAL TYPE ON-THE-ROAD TRUCKS AND SEMI-TRAILERS, INCLUDING EUCLIDS) HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
TRUCK DRIVERSSNORKLE TRUCK HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
TRUCK DRIVERSHEAVY DUTY TRAILER UP TO 40 TONS HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
TRUCK DRIVERSHEAVY DUTY TRAILER 40 TONS AND OVER HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
TRUCK DRIVERS4 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
TRUCK DRIVERS4 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
TRUCK DRIVERS3 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
TRUCK DRIVERS3 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND GOOD FRIDAY, PROVIDED THE EMPLOYEE HAS AT LEAST 31 CALENDAR DAYS OF SERVICE AND WORKS THE LAST SCHEDULED DAY BEFORE AND THE FIRST SCHEDULED DAY AFTER THE HOLIDAY, UNLESS EXCUSED
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.
They are separate systems. Davis-Bacon rates apply to federally funded or assisted work; a state prevailing wage law can apply to state-funded work. A project can be covered by both, in which case the higher rate for each classification effectively controls. This page shows the federal determination only.
Is the WH-347 form mandatory?
The WH-347 itself is optional; what is mandatory on covered work is submitting weekly certified payroll with the same information and a signed Statement of Compliance. Most contractors use the WH-347 layout because agencies expect it.