OPERATOR leads the residential schedule for Tulare County, CA at $66.39 base plus $34.69 fringe. The active federal wage determination covering residential construction in Tulare County, CA lists 78 classifications with published rates, base pay from $7.25 to $66.39 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BRICKLAYER | $17.00 | $1.12 | CA20260009 |
| BRICK TENDER | $11.00 | $0.96 | CA20260009 |
| CARPENTER | $21.24 | $7.20 | CA20260009 |
| CEMENT MASON/CONCRETE FINISHER(SITE WORK ONLY) FRESNO, MADERA, MERCED, SAN JOAQUIN, STANISLAUS AND TULARE COUNTIES | $39.20 | $19.71 | CA20260009 |
The highest published base on this schedule belongs to OPERATOR at $66.39 per hour plus $34.69 fringe; the schedule's median base is $48.82.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
92% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example CA20260009 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| CEMENT MASON/CONCRETE FINISHER(SITE WORK ONLY) KERN COUNTY | $47.70 | $27.07 | CA20260009 |
| ELECTRICIANCHINA LAKE NAVAL WEAPONS CENTER, EDWARDS AFB KERN COUNTY | $65.40 | $22.15 | CA20260009 |
| ELECTRICIAN MERCED AND STANISLAUS COUNTIES | $48.50 | $30.09 | CA20260009 |
| ELECTRICIANSONE AND TWO-STORIES FRESNO, MADERA AND TULARE COUNTIES | $19.00 | $7.72 | CA20260009 |
| ELECTRICIAN SAN JOAQUIN COUNTY | $49.45 | $31.96 | CA20260009 |
| LABORER, GENERAL | $7.25 | $0.00 | CA20260009 |
| LATHER | $15.00 | $0.00 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 1 | $66.39 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, AREA 1:: GROUP 6 | $58.88 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, AREA 1:: GROUP 1 | $65.54 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, AREA 1:: GROUP 2 | $64.09 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, AREA 1:: GROUP 3 | $62.69 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, AREA 1:: GROUP 4 | $61.36 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, AREA 1:: GROUP 5 | $60.15 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, AREA 1:: GROUP 7 | $57.79 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, AREA 1:: GROUP 8 | $56.71 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, AREA 1:: GROUP 8-A | $54.69 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 2 | $64.70 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 | $63.06 | $34.69 | CA20260009 |
| OPERATORPOWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 1) | $52.25 | $28.56 | CA20260009 |
| OPERATORPOWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 (AREA 2) | $54.25 | $28.56 | CA20260009 |
| OPERATORPOWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 1) | $47.64 | $28.56 | CA20260009 |
| OPERATORPOWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 (AREA 2) | $49.64 | $28.56 | CA20260009 |
| OPERATORPOWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 2) | $57.85 | $28.56 | CA20260009 |
| OPERATORPOWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 (AREA 1) | $55.85 | $28.56 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 25 (KERN COUNTY SITE WORK ONLY) | $49.98 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 2 (KERN COUNTY SITE WORK ONLY) | $46.08 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 3 (KERN COUNTY SITE WORK ONLY) | $46.37 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 4 (KERN COUNTY SITE WORK ONLY) | $47.86 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 5 (KERN COUNTY SITE WORK ONLY) | $48.96 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 6 (KERN COUNTY SITE WORK ONLY) | $48.08 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 7 (KERN COUNTY SITE WORK ONLY) | $49.18 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 8 (KERN COUNTY SITE WORK ONLY) | $48.19 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 9 (KERN COUNTY SITE WORK ONLY) | $49.29 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 22 (KERN COUNTY SITE WORK ONLY) | $49.58 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 10 | $49.65 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 11 | $50.65 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 12 | $51.65 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 13 | $52.65 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 9 | $48.65 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 8 | $48.48 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 5 | $48.08 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 4 | $47.86 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 7 | $48.31 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 6 | $48.19 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 1 | $46.65 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 3 | $47.72 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING EQUIPMENT: GROUP 2 | $47.43 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 10 (KERN COUNTY SITE WORK ONLY) | $48.31 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 11 (KERN COUNTY SITE WORK ONLY) | $49.41 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 12 (KERN COUNTY SITE WORK ONLY) | $48.48 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 13 (KERN COUNTY SITE WORK ONLY) | $48.58 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 14 (KERN COUNTY SITE WORK ONLY) | $48.61 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 15 (KERN COUNTY SITE WORK ONLY) | $48.69 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 16 (KERN COUNTY SITE WORK ONLY) | $48.81 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 17 (KERN COUNTY SITE WORK ONLY) | $48.98 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 18 (KERN COUNTY SITE WORK ONLY) | $49.08 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 19 (KERN COUNTY SITE WORK ONLY) | $49.19 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 1 (KERN COUNTY SITE WORK ONLY) | $45.30 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 20 (KERN COUNTY SITE WORK ONLY) | $49.31 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 21 (KERN COUNTY SITE WORK ONLY) | $49.48 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 23 (KERN COUNTY SITE WORK ONLY) | $49.69 | $25.25 | CA20260009 |
| OPERATORPOWER EQUIPMENT GROUP 24 (KERN COUNTY SITE WORK ONLY) | $49.81 | $25.25 | CA20260009 |
| PAINTER, INCLUDING LEAD ABATEMENT(2) ALL OTHER WORK KERN COUNTY: | $34.08 | $18.50 | CA20260009 |
| PAINTERSBRUSH MERCED, STANISLAUS & SAN JOAQUIN COUNTIES FOOTNOTES: SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER LEVEL $2.00 ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER HOUR | $43.45 | $22.80 | CA20260009 |
| PLASTERER | $17.50 | $0.00 | CA20260009 |
| PLUMBERLANDSCAPE/IRRIGATION FITTER KERN COUNTY | $44.75 | $26.20 | CA20260009 |
| PLUMBERSEWER & STORM DRAIN WORK KERN COUNTY | $48.84 | $23.58 | CA20260009 |
| PLUMBERALL OTHER WORK KERN COUNTY | $48.83 | $22.73 | CA20260009 |
| ROOFER FRESNO, KERN, MADERA AND TULARE COUNTIES | $45.76 | $16.86 | CA20260009 |
| ROOFER MERCED, SAN JOAQUIN AND STANISLAUS COUNTIES | $49.65 | $22.19 | CA20260009 |
| SOFT FLOOR LAYER FRESNO, MADERA AND TULARE COUNTIES | $38.53 | $23.19 | CA20260009 |
| SOFT FLOOR LAYER KERN COUNTY | $45.15 | $19.43 | CA20260009 |
| SOFT FLOOR LAYER SAN JOAQUIN AND STANISLAUS COUNTIES | $48.54 | $26.59 | CA20260009 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.