POWER EQUIPMENT OPERATOR leads the residential schedule for Pinal County, AZ at $34.49 base plus $12.57 fringe. The active federal wage determination covering residential construction in Pinal County, AZ lists 30 classifications with published rates, base pay from $10.18 to $34.49 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ALARM INSTALLER, INCLUDES WIRING AND INSTALLATION | $13.91 | $0.00 | AZ20260010 |
| BRICKLAYER ZONE PAY(RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOURBRICKLAYER ZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR | $32.29 | $9.97 | AZ20260010 |
Across the 30 published classifications for residential work in Pinal County, AZ, base pay spans $10.18 to $34.49 per hour with a median of $16.20.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
Most rate lines here carry SU or state-adopted identifiers, meaning they come from wage surveys rather than negotiated agreements. Survey rates change less often but can jump when a new survey publishes.
A wage determination is cited as number plus modification, for example AZ20260010 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Certified payroll uses the employee's name and an individually identifying number, normally the last four digits of the Social Security number. Full SSNs do not belong on submitted payrolls.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK |
| $18.16 |
| $0.00 |
| AZ20260010 |
| CEMENT MASON/CONCRETE FINISHER | $28.78 | $9.17 | AZ20260010 |
| DRYWALL HANGER | $15.00 | $0.58 | AZ20260010 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS | $15.45 | $0.01 | AZ20260010 |
| FORM WORKER | $14.37 | $0.00 | AZ20260010 |
| GLAZIER | $13.45 | $0.00 | AZ20260010 |
| HVAC MECHANIC(INSTALLATION OF HVAC DUCT) | $14.13 | $0.00 | AZ20260010 |
| IRONWORKER, STRUCTURAL | $33.00 | $19.91 | AZ20260010 |
| LABORERPIPELAYER | $13.00 | $0.00 | AZ20260010 |
| LABORERCOMMON OR GENERAL | $10.18 | $0.00 | AZ20260010 |
| LABORERGRADE CHECKER | $16.83 | $0.45 | AZ20260010 |
| LABORERMASON TENDER - BRICK | $12.77 | $0.00 | AZ20260010 |
| LABORERMASON TENDER - CEMENT/CONCRETE/STONE | $11.00 | $0.00 | AZ20260010 |
| OPERATORTRACTOR | $22.63 | $0.00 | AZ20260010 |
| OPERATORBACKHOE | $18.29 | $0.00 | AZ20260010 |
| OPERATOREXCAVATOR | $24.67 | $0.00 | AZ20260010 |
| OPERATORFORKLIFT | $16.17 | $0.00 | AZ20260010 |
| OPERATORLOADER (FRONT END) | $15.00 | $0.00 | AZ20260010 |
| OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.75 | $0.00 | AZ20260010 |
| OPERATORROLLER | $16.24 | $1.42 | AZ20260010 |
| OPERATORSCRAPER | $19.20 | $1.52 | AZ20260010 |
| PAINTERBRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $12.89 | $0.00 | AZ20260010 |
| PLUMBER | $20.14 | $4.08 | AZ20260010 |
| POWER EQUIPMENT OPERATORGRADER/BLADE | $34.49 | $12.57 | AZ20260010 |
| ROOFER | $13.67 | $0.00 | AZ20260010 |
| SPRINKLER FITTER(FIRE SPRINKLERS) | $17.73 | $0.00 | AZ20260010 |
| TRUCK DRIVERDUMP TRUCK | $17.02 | $0.00 | AZ20260010 |
| TRUCK DRIVERWATER TRUCK | $14.50 | $0.00 | AZ20260010 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.