POWER EQUIPMENT OPERATOR leads the highway schedule for Pinal County, AZ at $43.11 base plus $10.87 fringe. The active federal wage determination covering highway construction in Pinal County, AZ lists 48 classifications with published rates, base pay from $18.03 to $43.11 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| CARPENTERFORMWORK CONCRETE | $29.84 | $8.85 | AZ20260048 |
| CARPENTER, EXCLUDES FORMWORK CONCRETE | $35.89 | $14.98 | AZ20260048 |
| CEMENT MASON/CONCRETE FINISHER | $30.42 | $0.00 | AZ20260048 |
| ELECTRICIAN | $29.00 | $7.58 | AZ20260048 |
Across the 48 published classifications for highway work in Pinal County, AZ, base pay spans $18.03 to $43.11 per hour with a median of $30.88.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
This schedule mixes sources: 58% of lines carry union identifiers and the rest are survey-based. Two crews on one site can be governed by rates that update on entirely different rhythms.
A wage determination is cited as number plus modification, for example AZ20260048 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| IRONWORKER |
| $33.00 |
| $19.91 |
| AZ20260048 |
| LABORERFENCE ERECTOR | $27.41 | $9.26 | AZ20260048 |
| LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.91 | $9.26 | AZ20260048 |
| LABORERGRADE SETTER | $29.91 | $9.26 | AZ20260048 |
| LABORERGUARDRAIL INSTALLER | $29.91 | $9.26 | AZ20260048 |
| LABORERGENERAL | $27.41 | $9.26 | AZ20260048 |
| LABORERMASON TENDER | $30.88 | $9.26 | AZ20260048 |
| LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $25.22 | $5.08 | AZ20260048 |
| LABORERPIPELAYER | $26.04 | $7.09 | AZ20260048 |
| LABORERLANDSCAPE LABORER | $19.00 | $6.34 | AZ20260048 |
| PAINTERPAVEMENT MARKING | $23.35 | $6.34 | AZ20260048 |
| PAINTERSIGN AND DISPLAY ERECTOR | $18.03 | $0.00 | AZ20260048 |
| POWER EQUIPMENT OPERATORBULLDOZER | $35.56 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATORTRACTOR | $35.56 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATOROILER | $32.29 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATORFIELD EQUIPMENT SERVICEPERSON | $35.56 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATORBACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE | $35.56 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATORLOADER/FRONT END LOADER | $35.56 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATORCRANE/DERRICK | $36.64 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATOREXCAVATOR/TRACKHOE (GREATER THAN 1/2 CUBIC YARD) | $36.64 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATOREXCAVATOR/TRACKHOE (1/2 CUBIC YARD OR SMALLER) | $35.56 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATORGRADE CHECKER | $36.64 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATORMOTOR GRADER/BLADE | $36.64 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATORMECHANIC | $37.67 | $18.12 | AZ20260048 |
| POWER EQUIPMENT OPERATORHORIZONTAL DIRECTIONAL DRILL | $31.98 | $9.26 | AZ20260048 |
| POWER EQUIPMENT OPERATORTRENCHER | $30.88 | $9.26 | AZ20260048 |
| POWER EQUIPMENT OPERATORFORKLIFT | $30.88 | $9.26 | AZ20260048 |
| POWER EQUIPMENT OPERATORCONCRETE SCREED | $26.41 | $7.64 | AZ20260048 |
| POWER EQUIPMENT OPERATORSCRAPER | $29.74 | $0.00 | AZ20260048 |
| POWER EQUIPMENT OPERATORPAVER/SPREADER/FINISH EQUIPMENT (ASPHALT, AGGREGATE, & CONCRETE) | $31.92 | $0.00 | AZ20260048 |
| POWER EQUIPMENT OPERATORMILLING MACHINE | $31.16 | $0.00 | AZ20260048 |
| POWER EQUIPMENT OPERATORDRILL RIG/AUGER | $36.74 | $13.07 | AZ20260048 |
| POWER EQUIPMENT OPERATORBOBCAT/SKID STEER/SKID LOADER | $30.09 | $8.72 | AZ20260048 |
| POWER EQUIPMENT OPERATORBOOM/CRANE TRUCK | $43.11 | $10.87 | AZ20260048 |
| POWER EQUIPMENT OPERATORBROOM/SWEEPER | $25.95 | $6.62 | AZ20260048 |
| POWER EQUIPMENT OPERATORCOMPACTOR/ROLLER | $29.75 | $0.00 | AZ20260048 |
| POWER EQUIPMENT OPERATORCONCRETE PUMP TRUCK | $43.11 | $10.87 | AZ20260048 |
| TRAFFIC CONTROL | $27.41 | $9.26 | AZ20260048 |
| TRUCK DRIVEROFF ROAD TRUCK | $35.56 | $18.12 | AZ20260048 |
| TRUCK DRIVERCONCRETE | $30.88 | $9.26 | AZ20260048 |
| TRUCK DRIVERDUMP | $30.88 | $9.26 | AZ20260048 |
| TRUCK DRIVERWATER | $30.88 | $9.26 | AZ20260048 |
| TRUCK DRIVEROIL DISTRIBUTOR | $29.41 | $7.63 | AZ20260048 |
| TRUCK DRIVERSWEEPER | $20.24 | $5.48 | AZ20260048 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.