ELECTRICIAN leads the heavy schedule for Pima County, AZ at $62.08 base plus $22.49 fringe. The active federal wage determinations covering heavy construction in Pima County, AZ list 66 classifications with published rates, base pay from $16.00 to $62.08 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| BOILERMAKER | $36.07 | $30.59 | AZ20260006 |
| BRICKLAYER(MARICOPA, MOHAVE, PINAL, AND YUMA COUNTIES) ZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOURBRICKLAYER (MARICOPA, MOHAVE, PINAL, AND YUMA COUNTIES) ZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR | $25.95 | $8.49 | AZ20260006 |
Across the 66 published classifications for heavy work in Pima County, AZ, base pay spans $16.00 to $62.08 per hour with a median of $31.98.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
97% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example AZ20260059 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| BRICKLAYER(PIMA COUNTY) ZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOURBRICKLAYER (PIMA COUNTY) ZONE PAY: (RADIUS MILES FROM THE INTERSECTION OF CENTRAL AVE. AND WASHINGTON ST., PHOENIX, AZ) ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER HOUR ZONE D: 101-200 MILES- BASE RATE PLUS $3.50 PER HOUR ZONE E: OVER 200 MILES- BASE RATE PLUS $6.50 PER HOUR | $25.31 | $8.13 | AZ20260006 |
| CARPENTER(INCLUDING FORM WORK) | $28.08 | $12.74 | AZ20260006 |
| CARPENTERFORMWORK CONCRETE | $31.98 | $9.26 | AZ20260059 |
| CEMENT MASON/CONCRETE FINISHER | $28.78 | $9.17 | AZ20260006 |
| DIVER(WET): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVERDIVER (WET): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $43.79 | $8.93 | AZ20260006 |
| DIVER(WET): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVERDIVER (WET): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $45.17 | $8.93 | AZ20260006 |
| DIVER(STANDBY): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVERDIVER (STANDBY): ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $22.98 | $8.93 | AZ20260006 |
| DIVER(STANDBY): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVERDIVER (STANDBY): ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $25.37 | $8.93 | AZ20260006 |
| DIVER(STANDBY): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVERDIVER (STANDBY): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $28.49 | $8.93 | AZ20260006 |
| DIVER(WET): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVERDIVER (WET): ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $48.29 | $8.93 | AZ20260006 |
| ELECTRICIAN | $33.00 | $13.04 | AZ20260059 |
| ELECTRICIANLINEPERSON | $62.08 | $22.49 | AZ20260059 |
| ELECTRICIANGROUNDPERSON | $36.00 | $16.88 | AZ20260059 |
| ELECTRICIANLINE EQUIPMENT OPERATOR | $46.56 | $19.15 | AZ20260059 |
| ELECTRICIAN | $16.00 | $2.84 | AZ20260006 |
| IRONWORKER ZONE 10 TO 50 MILES FROM CITY HALL IN PHOENIX OR TUCSON ZONE 2: 050 TO 100 MILES - ADD $4.00 ZONE 3: 100 TO 150 MILES - ADD $5.00 ZONE 4: 150 MILES & OVER - ADD $6.50IRONWORKER ZONE 1: 0 TO 50 MILES FROM CITY HALL IN PHOENIX OR TUCSON ZONE 2: 050 TO 100 MILES - ADD $4.00 ZONE 3: 100 TO 150 MILES - ADD $5.00 ZONE 4: 150 MILES & OVER - ADD $6.50 | $33.00 | $19.91 | AZ20260006 |
| LABORERGENERAL | $27.41 | $9.26 | AZ20260059 |
| LABORERJACKHAMMER | $29.05 | $9.26 | AZ20260059 |
| LABORERMASON TENDER | $27.41 | $9.26 | AZ20260059 |
| LABORERPIPELAYER | $27.41 | $9.26 | AZ20260059 |
| LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.05 | $9.26 | AZ20260059 |
| LABORERSGROUP 4 ASPHALT RAKER AND IRONER; AIR AND WATER WASHOUT NOZZLEMAN (LOW AND HIGH PRESSURE); SCALER (USING BOS'N'S CHAIR OR SAFETY BELT); TAMPER (MECHANICAL-ALL TYPES); SANDBLASTER (NOZZLEMAN); CONCRETE SAW (HAND-GUIDED); CONCRETE CUTTING TORCH; GUNITE (GUNMAN, MIXERMAN, RODMAN); BIO-FILER, PRESSMAN, INSTALLER, OPERATOR; HAND-GUIDED TRENCHER AND SIMILARLY OPERATED EQUIPMENT; DRILLER (JACKHAMMER AND/OR PAVEMENT BREAKER); GRADE SETTER (PIPELINE); PIPE LAYER INCLUDING BUT NOT LIMITED TO NON-METALLIC | $30.88 | $9.26 | AZ20260006 |
| LABORERSGROUP 3 OPERATOR AND TENDER OF PNEUMATIC AND ELECTRIC TOOLS; CONCRETE VIBRATING MACHINES, CHAIN SAW (ON CLEARING AND GRUBBING); HYDRAULIC JACKS AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY HEREIN CLASSIFIED; PIPE CAULKER AND/OR BACKUP MAN-PIPELINE; RIGGERS AND SIGNAL MAN-PIPELINE; PIPE WRAPPER; CRIBBER & SHORER (EXCEPT TUNNEL); PNEUMATIC GOPHER; PRE-CAST MANHOLE ERECTOR | $29.91 | $9.26 | AZ20260006 |
| LABORERSGROUP 2 CONCRETE LABORER (BELT, PIPE AND/OR HOSEMAN); CEMENT MASON TENDER; CUTTING TORCH OPERATOR; POWER TYPE CONCRETE BUGGY; BANDER; GUINEA CHASER | $29.05 | $9.26 | AZ20260006 |
| LABORERSGROUP 1 LABORER, GENERAL OR CONSTRUCTION; TOOL DISPATCHER OR CHECKER; MANUALLY CONTROLLED SIGNAL OPERATOR; FENCE BUILDER, GUARD RAIL BUILDER-HIGHWAY; CHAT BOX MAN; DUMPMAN AND/OR SPOTTER; RIP RAP STONE MAN; ROCK SLINGER; FORM STRIPPER; PACKING ROD STEEL AND PANS; CESSPOOL DIGGERS AND INSTALLERS; ASTRO TURF LAYER; CLEAN UP-BULL GANG TRACKMAN, RAILROAD; CHIPPER (CLEARING AND GRUBBING); KETTLEMAN-TARMAN; SPIKERS, WRENCHERS-CREOSOTE TIEMAN; FLOOR SANDERS-CONCRETE; SANDBLASTER (POT TENDER); POWDERMAN | $27.41 | $9.26 | AZ20260006 |
| LABORERSGROUP 5 DRILL DOCTOR AND/OR AIR TOOL REPAIRMAN; SCALER (DRILLER); FORM SETTER AND/OR BUILDER; WELDER AND/OR PIPELAYER INSTALLING PROCESS PIPING; DRILLER-CORE, DIAMOND, WAGON, AIR TRACK, JOY, MUSTANG, PR-143, 220 GARDNER-DENVER, HYDRASONIC, POWDERMAN; WATER BLASTER OPERATOR NOTE: $0.50 PER HOUR PREMIUM FOR PERFORMING HAZARDOUS WASTE REMOVAL | $31.98 | $9.26 | AZ20260006 |
| MILLWRIGHT ZONE DEFINITIONS FOR MILLWRIGHTSMILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVERMILLWRIGHT ZONE DEFINITIONS FOR MILLWRIGHTS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESIDENCE, WHICHEVER IS LESS: ZONE 1: 0-30 MILES ZONE 2: 31-49 MILES ZONE 3: 50 MILES AND OVER | $40.61 | $17.53 | AZ20260006 |
| PAINTER | $25.47 | $8.00 | AZ20260006 |
| PILEDRIVERMAN | $27.38 | $12.44 | AZ20260006 |
| PLUMBER/PIPEFITTER(MARICOPA, MOHAVE, PINAL, AND YUMA) | $54.15 | $19.80 | AZ20260006 |
| POWER EQUIPMENT OPERATOROILER | $32.29 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORFIELD EQUIPMENT SERVICEPERSON | $35.56 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORCRANE/DERRICK | $36.64 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORMECHANIC | $37.67 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORBOBCAT/SKID STEER/SKID LOADER | $32.29 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORBACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE | $35.56 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORBULLDOZER | $35.56 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORCOMPACTOR/ROLLER | $35.56 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATOR(DRILL RIG/AUGER) | $35.56 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORTRENCHER | $35.56 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORGRADE CHECKER | $36.64 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORLOADER/FRONT END LOADER (ALL TYPES RATED CAPACITY 3 CUBIC YDS OR LESS) | $32.29 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORLOADER/FRONT END LOADER (RATED CAPACITY 6, LESS THAN 10 CUBIC YDS) | $36.64 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORLOADER/FRONT END LOADER (ALL TYPES RATED CAPACITY OVER 3, LESS THAN 6 CUBIC YDS) | $35.56 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORMOTOR GRADER/BLADE | $36.64 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATOREXCAVATOR/TRACKHOE (GREATER THAN 1/2 CUBIC YARD) | $36.64 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATOREXCAVATOR/TRACKHOE (1/2 CUBIC YARD OR SMALLER) | $35.56 | $18.12 | AZ20260059 |
| POWER EQUIPMENT OPERATORGROUP 4 CRANE OPERATOR (PNEUMATIC OR CRAWLER-100 TONS HOISTING CAPACITY AND OVER, MRC RATING), SKIP LOADER (ALL TYPES WITH RATED CAPACITY OF 10 CU. YD. OR MORE), UNIVERSAL EQUIPMENT OPERATOR (BACKHOE, CLAMSHELL, DRAGLINE, SHOVEL, ETC., 10 CU. YD. AND OVER) MULTIPLE-UNIT EARTH EQUIPMENT (HOLLAND LOADER ETC.), TRACTOR OPERATOR, PNEUMATIC-TIRED OR TRACK TYPE, TWO UNITS-$0.50 PER HOUR OVER BASE RATE; AND $1.00 PER HOUR FOR EACH ADDITIONAL UNIT ALL OPERATORS, OILERS, AND MOTOR CRANE DRIVERS ON EQUIPM | $32.42 | $11.72 | AZ20260006 |
| POWER EQUIPMENT OPERATORGROUP 3 ASPHALT OR CONCRETE PLANING, ROTOMILL AND MILLING MACHINE, AUTO GRADE MACHINE (CMI AND SIMILAR EQUIPMENT), BORING MACHINE (INCLUDING MOLE, BADGER AND SIMILAR TYPE), CONCRETE PUMP (TRUCK MOUNTED WITH BOOM), CRANE (CRAWLER AND PNEUMATIC OVER 15 TONS BUT LESS THAN 100 TONS CAPACITY MRC), CRAWLER TYPE TRACTOR WITH BOOM ATTACHMENT AND SLOPE BAR, DERRICK, GRADALL, HEAVY DUTY MECHANIC/WELDER, HELICOPTER HOIST OPERATOR OR PILOT, HIGHLINE CABLEWAY, MASS EXCAVATOR (150 BUCYRUS, ERIE AND SIMILAR TY | $31.39 | $11.72 | AZ20260006 |
| POWER EQUIPMENT OPERATORGROUP 1 A-FRAME BOOM TRUCK, WINCH TRUCK, AIR COMPRESSOR, BELTCRETE, BORING BRIDGE AND TEXTURE, CONCRETE MIXER (SKIP TYPE), CONDUCTOR, BRAKEMAN, HANDLER, CONVEYOR, CROSS TIMING AND PIPE FLOAT, CURING MACHINE, DINKY (UNDER 20 TONS), ELEVATOR HOIST (HUSKY AND SIMILAR), FIREMEN (ALL), FORKLIFT AND ROSS CARRIER, GENERATOR (ALL), HIGHLINE CABLEWAY SIGNALMAN, HYDROGRAPHIC MULCHER, HYDROGRAPHIC SEEDER, JOINT INSERTER, JUMBO FINISHING MACHINE, KOLMAN BELT LOADER, MACHINE CONVEYOR, MULTIPLE POWER CONCRETE | $27.04 | $11.72 | AZ20260006 |
| POWER EQUIPMENT OPERATORGROUP 2 AGGREGATE PLANT (INCLUDING CRUSHING, SCREENING AND SAND PLANTS, ETC.), ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE (RUBBER TIRED OR TRACK, LESS THAN 1 CU. YD. MRC), BEE GEE OPERATOR BORING MACHINE, CONCRETE BATCH PLANT (ALL TYPES AND SIZES), CONCRETE MECHANICAL TAMPING, SPREADING OR FINISHING MACHINE (INCLUDING CLARY, JOHNSON OR SIMILAR TYPES), CONCRETE MIXER (PAVING TYPE AND MOBILE MIXERS), CONCRETE PUMP, CRANE (CRAWLER AND PNEUMATIC LESS THAN 15 TON CAPACITY MRC), DRILLING MA | $30.31 | $11.72 | AZ20260006 |
| POWER EQUIPMENT OPERATORFORKLIFT | $30.88 | $9.26 | AZ20260059 |
| POWER EQUIPMENT OPERATORHORIZONTAL DIRECTIONAL DRILL | $31.98 | $9.26 | AZ20260059 |
| POWER EQUIPMENT OPERATORSCRAPER | $32.30 | $0.00 | AZ20260059 |
| TRAFFIC CONTROL | $27.41 | $9.26 | AZ20260059 |
| TRUCK DRIVERHYDROVAC | $35.56 | $18.12 | AZ20260059 |
| TRUCK DRIVERCONCRETE | $30.88 | $9.26 | AZ20260059 |
| TRUCK DRIVERDUMP | $30.88 | $9.26 | AZ20260059 |
| TRUCK DRIVERWATER | $30.88 | $9.26 | AZ20260059 |
| TRUCK DRIVER GROUP 22 OR 3 AXLE DUMP , WATER TRUCK UNDER 2500 GAL. FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $26.95 | $1.65 | AZ20260006 |
| TRUCK DRIVER GROUP 3- 4 AXLE DUMP, WATER TRUCK DRIVE-(2500 GAL BUT LESS THAN 4000 GAL) FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $27.43 | $1.65 | AZ20260006 |
| TRUCK DRIVER GROUP 4- 5 AXLE DUMP, WATER TRUCK 4000 GAL AND OVER FOOTNOTEHEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $28.68 | $1.65 | AZ20260006 |
| TRUCK DRIVER GROUP 5- 6-AXLE DUMP FOOTNOTEHEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $27.80 | $1.65 | AZ20260006 |
| TRUCK DRIVER GROUP 6- 7-AXLE DUMP, 8-AXLE DUMP FOOTNOTEHEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 | $29.47 | $1.65 | AZ20260006 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.