PILEDRIVER leads the heavy schedule for Aleutians West Census Area, AK at $92.83 base plus $26.42 fringe. The active federal wage determination covering heavy construction in Aleutians West Census Area, AK lists 82 classifications with published rates, base pay from $29.82 to $92.83 per hour. The determination was last modified May 18, 2026.
| Classification | Base | Fringe | WD |
|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR(INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) | $41.35 | $16.46 | AK20260001 |
| BOILERMAKER | $58.33 | $28.79 | AK20260001 |
| BRICKLAYER, BLOCKLAYER, STONEMASON, MARBLE MASON, TILE SETTER, TERRAZZO WORKER | $52.77 | $12.36 | AK20260001 |
| CABLE SPLICER | $55.44 | $30.33 |
The highest published base on this schedule belongs to PILEDRIVER at $92.83 per hour plus $26.42 fringe; the schedule's median base is $49.23.
The most recent modification to the governing determination is dated May 18, 2026. DOL's weekly publication cycle means further modifications can post on any Friday.
100% of the rate lines here carry union local identifiers, so the published figures track negotiated agreements, which is why some classifications carry high fringe amounts relative to base.
A wage determination is cited as number plus modification, for example AK20260001 Mod dated May 18, 2026. Your certified payroll should reflect the determination in your contract, not necessarily the newest one.
Save the full determination text with your bid papers the day you price the job. If rates change later, the contract determination is your record of what you bid against.
DOL publishes modifications weekly, generally Fridays. A quick check before running payroll catches a mid-project modification before it shows up in an agency review instead.
The classification that applies is determined by the work performed, not the worker's title. A foreman who works with the tools is generally due the rate for the hours on the tools.
You can meet the fringe obligation with bona fide benefit plan contributions, cash, or a combination. Track the hourly equivalent of what you contribute; agencies ask for the math.
The signed Statement of Compliance may be the WH-347 back page or another document with identical wording. The signature is a federal certification by your company's officer; accuracy is on the certifier.
Synced from SAM.gov July 18, 2026. The wage determination incorporated into your contract is the legally operative document.
| AK20260001 |
| CABLE SPLICER(LINE CONSTRUCTION) | $74.34 | $35.70 | AK20260001 |
| CARPENTER(INCLUDING LATHER AND DRYWALL HANGING) | $50.79 | $26.42 | AK20260001 |
| CEMENT MASON/CONCRETE FINISHER(NORTH OF THE 63RD PARALLEL) | $49.28 | $22.28 | AK20260001 |
| CEMENT MASON/CONCRETE FINISHER(SOUTH OF THE 63RD PARALLEL) | $49.28 | $22.28 | AK20260001 |
| DIVER(TENDER) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT: 5-50 FEET $1.00 PER FOOT/DAY 51-100 FEET $2.00 PER FOOT/DAY 101 FEET AND ABOVE $3.00 PER FOOT/DAY SATURATION DIVING: THE STANDBY RATE APPLIES UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL S | $53.03 | $25.34 | AK20260001 |
| DIVER(STAND BY) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT: 5-50 FEET $1.00 PER FOOT/DAY 51-100 FEET $2.00 PER FOOT/DAY 101 FEET AND ABOVE $3.00 PER FOOT/DAY SATURATION DIVING: THE STANDBY RATE APPLIES UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL | $61.42 | $25.34 | AK20260001 |
| ELECTRICIAN | $55.44 | $30.33 | AK20260001 |
| ELEVATOR MECHANIC FOOTNOTEA. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $71.44 | $38.44 | AK20260001 |
| FLOOR LAYERCARPET | $39.48 | $16.25 | AK20260001 |
| GLAZIER(NORTH OF THE 63RD PARALLEL) | $46.76 | $30.46 | AK20260001 |
| GLAZIER(SOUTH OF THE 63RD PARALLEL) | $47.42 | $29.10 | AK20260001 |
| HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $37.38 | $19.55 | AK20260001 |
| IRONWORKER(BRIDGE, STRUCTURAL, ORNAMENTAL, REINFORCING MACHINERY MOVER, RIGGER, SHEETER, STAGE RIGGER, BENDER OPERATOR) | $46.98 | $39.48 | AK20260001 |
| IRONWORKER(HELICOPTER, TOWER) | $47.89 | $39.48 | AK20260001 |
| IRONWORKER(GUARDRAIL LAYOUT MAN) | $44.22 | $39.48 | AK20260001 |
| IRONWORKER(GUARDRAIL INSTALLERS) | $44.48 | $39.48 | AK20260001 |
| IRONWORKER(FENCE, BARRIER INSTALLER) | $43.48 | $39.48 | AK20260001 |
| IRONWORKER(BENDER OPERATOR) | $46.98 | $39.48 | AK20260001 |
| LABORERGROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $54.01 | $28.81 | AK20260001 |
| LABORERGROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH L | $40.25 | $34.26 | AK20260001 |
| LABORERGROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPE | $41.25 | $34.26 | AK20260001 |
| LABORERGROUP 3A (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $46.53 | $34.26 | AK20260001 |
| LABORERGROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $42.15 | $34.26 | AK20260001 |
| LABORERGROUP 4 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS | $29.82 | $34.26 | AK20260001 |
| LABORERTUNNELS, SHAFTS, AND RAISES GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); F | $44.28 | $34.26 | AK20260001 |
| LABORERTUNNELS, SHAFTS, AND RAISES GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CU | $45.38 | $34.26 | AK20260001 |
| LABORERTUNNELS, SHAFTS, AND RAISES GROUP 3A (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $51.18 | $34.26 | AK20260001 |
| LABORERTUNNELS, SHAFTS, AND RAISES GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $59.41 | $28.81 | AK20260001 |
| LABORERTUNNELS, SHAFTS, AND RAISES GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $46.37 | $34.26 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 1 (TUNNELS, SHAFTS, AND RAISES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); | $44.28 | $34.26 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 2 (TUNNELS, SHAFTS, AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN C | $45.38 | $34.26 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 3 (TUNNELS, SHAFTS, AND RAISES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $46.37 | $34.26 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $42.15 | $34.26 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3B (TUNNELS, SHAFTS, AND RAISES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $59.41 | $28.81 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3B) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $54.01 | $28.81 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 4) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS | $29.82 | $34.26 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3A (TUNNELS, SHAFTS, AND RAISES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $51.18 | $34.26 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 1) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH L | $40.25 | $34.26 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3A) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $46.53 | $34.26 | AK20260001 |
| LABORERSNORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 2) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPE | $41.25 | $34.26 | AK20260001 |
| LINEMENLINE CONSTRUCTION (INCLUDING EQUIPMENT OPERATORS, TECHNICIAN) | $72.59 | $35.65 | AK20260001 |
| MILLWRIGHT | $56.44 | $25.87 | AK20260001 |
| PAINTERBRUSH/ROLLER PAINT OR WALL COVERER (NORTH OF THE 63RD PARALLEL) | $43.05 | $26.45 | AK20260001 |
| PAINTERTAPING, TEXTURING, STRUCTURAL PAINTING, SANDBLASTING, POT TENDER, FINISH METAL, SPRAY, BUFFER OPERATOR, RADON MITIGATION, LEAD BASED PAINT ABATEMENT, HAZARDOUS MATERIAL HANDLER (NORTH OF THE 63RD PARALLEL) | $43.57 | $26.45 | AK20260001 |
| PAINTERINDUSTRIAL PAINTER (SOUTH OF THE 63RD PARALLEL) | $38.64 | $30.20 | AK20260001 |
| PAINTERTAPER / PAPER & VINYL HANGER (SOUTH OF THE 63RD PARALLEL) | $38.54 | $30.20 | AK20260001 |
| PAINTERGENERAL PAINTER (SOUTH OF THE 63RD PARALLEL) | $37.29 | $30.20 | AK20260001 |
| PILEDRIVER(SHEET STABBER) | $48.72 | $26.42 | AK20260001 |
| PILEDRIVER(PILEDRIVER; SKIFF OPERATOR AND RIGGER) $ 48.72 26.42 DIVER (WORKING) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT: 5-50 FEET $1.00 PER FOOT/DAY 51-100 FEET $2.00 PER FOOT/DAY 101 FEET AND ABOVE $3.00 PER FOOT/DAY SATURATION DIVING: THE STANDBY RATE APPLIES UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOM | $92.83 | $26.42 | AK20260001 |
| PILEDRIVER(WELDER) | $54.28 | $26.42 | AK20260001 |
| PLASTERER(NORTH OF THE 63RD PARALLEL) | $49.28 | $22.28 | AK20260001 |
| PLASTERER(SOUTH OF THE 63RD PARALLEL) | $49.28 | $22.28 | AK20260001 |
| PLUMBER; STEAMFITTER(EAST OF THE 141ST MERIDIAN) | $41.50 | $27.62 | AK20260001 |
| PLUMBER; STEAMFITTER(SOUTH OF THE 63RD PARALLEL) | $50.00 | $33.20 | AK20260001 |
| PLUMBER; STEAMFITTER(NORTH OF THE 63RD PARALLEL) | $55.66 | $34.90 | AK20260001 |
| POWDERMAN, LINE CONSTRUCTION | $70.59 | $35.59 | AK20260001 |
| POWER EQUIPMENT OPERATORGROUP 1 (TUNNEL WORK) ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK AND SIMILAR CONVEYORS; BENDING MACHINE; BOAT COXWAINS; BULLDOZERS; CABLEWAYS, HIGHLINES AND CABLECARS; CLEANING MACHINE; COATING MACHINE; CONCRETE HYDRO BLASTER; CRANES-45 TONS AND UNDER OR 150 FOOT BOOM AND UNDER (INCLUDING JIB AND ATTACHMENTS): (A) HYDRALIFTS OR TRANSPORTERS, ALL TRACK OR TRUCK TYPE,(B) DERRICKS; CRUSHERS; DECK WINCHES-DOUBLE DRUM; DITCHIN | $58.55 | $29.50 | AK20260001 |
| POWER EQUIPMENT OPERATOR(GROUP 1) ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK AND SIMILAR CONVEYORS; BENDING MACHINE; BOAT COXWAINS; BULLDOZERS; CABLEWAYS, HIGHLINES AND CABLECARS; CLEANING MACHINE; COATING MACHINE; CONCRETE HYDRO BLASTER; CRANES-45 TONS AND UNDER OR 150 FOOT BOOM AND UNDER (INCLUDING JIB AND ATTACHMENTS): (A) HYDRALIFTS OR TRANSPORTERS, ALL TRACK OR TRUCK TYPE,(B) DERRICKS; CRUSHERS; DECK WINCHES-DOUBLE DRUM; DITCHING OR TRENCHI | $53.23 | $29.50 | AK20260001 |
| POWER EQUIPMENT OPERATOR(GROUP 1A) CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE), CRANES-OVER 45 TONS OR 150 FOOT (INCLUDING JIB AND ATTACHMENTS): (A) CLAMSHELLS AND DRAGLINES (OVER 3 YARDS), (B) TOWER CRANES; LICENSED WATER/WASTE WATER TREATMENT OPERATOR; LOADERS OVER 5 YDS.; CERTIFIED WELDER, ELECTRICAL MECHANIC, CAMP MAINTENANCE ENGINEER, MECHANIC (OVER 10,000 HOURS); MOTOR PATROL GRADER, DOZER, GRADE TRACTOR, ROTO-MILL/PROFILER (FINISH: WHEN FINISHING TO FINAL GRADE AND/OR TO HUBS, OR FOR ASPHALT); POWER PLANTS: 1000 K.W. | $55.33 | $29.50 | AK20260001 |
| POWER EQUIPMENT OPERATOR(GROUP 2) BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS (EXCEPT AS LISTED IN GROUP 1); HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR;LICENSED GRADE TECHNICIAN; LOADERS, (I.E., ELEVATING GRADER AND MATERIAL TRANSFER VEHICLE); LOCOMOTIVES: ROD AND GEARED ENGINES; MIXERS; SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF SIZE); SKIDDER; TRENCING MACHINE UNDER 16 INCHES; WASTE/ WASTE WATER TREATMENT OPERATOR | $52.32 | $29.50 | AK20260001 |
| POWER EQUIPMENT OPERATOR(GROUP 3) ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSOR; FARM TRACTOR; FORKLIFT, INDUSTRIAL TYPE; GIN TRUCK OR WINCH TRUCK WITH POLES WHEN USED FOR HOISTING; GRADE CHECKER AND STAKE HOPPER; HOIST, AIR TUGGERS, ELEVATORS; LOADERS: (A) ELEVATING-ATHEY, BARBER GREEN AND SIMILAR TYPES (B) FORKLIFTS OR LUMBER CARRIER (ON CONSTRUCTION JOB SITE) (C) FORKLIFTS WITH TOWER (D) OVERHEAD AND FRONT-END, UNDER 2 1/2 YDS | $51.46 | $29.50 | AK20260001 |
| POWER EQUIPMENT OPERATOR(GROUP 4) RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEANER; DRILL HELPER. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $44.06 | $29.50 | AK20260001 |
| POWER EQUIPMENT OPERATOR GROUP 1A(TUNNEL WORK) CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE), CRANES-OVER 45 TONS OR 150 FOOT (INCLUDING JIB AND ATTACHMENTS): (A) CLAMSHELLS AND DRAGLINES (OVER 3 YARDS), (B) TOWER CRANES; LICENSED WATER/WASTE WATER TREATMENT OPERATOR; LOADERS OVER 5 YDS.; CERTIFIED WELDER, ELECTRICAL MECHANIC, CAMP MAINTENANCE ENGINEER, MECHANIC (OVER 10,000 HOURS); MOTOR PATROL GRADER, DOZER, GRADE TRACTOR, ROTO-MILL/PROFILER (FINISH: WHEN FINISHING TO FINAL GRADE AND/OR TO HUBS, OR FOR ASPHALT); POWER PLANTS: 1000 K. | $60.86 | $29.50 | AK20260001 |
| POWER EQUIPMENT OPERATOR GROUP 2(TUNNEL WORK) BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS (EXCEPT AS LISTED IN GROUP 1); HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR;LICENSED GRADE TECHNICIAN; LOADERS, (I.E., ELEVATING GRADER AND MATERIAL TRANSFER VEHICLE); LOCOMOTIVES: ROD AND GEARED ENGINES; MIXERS; SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF SIZE); SKIDDER; TRENCING MACHINE UNDER 16 INCHES; WASTE/ WASTE WATER TREATMENT OPERATOR. FO | $57.55 | $29.50 | AK20260001 |
| POWER EQUIPMENT OPERATOR GROUP 3(TUNNEL WORK) ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSOR; FARM TRACTOR; FORKLIFT, INDUSTRIAL TYPE; GIN TRUCK OR WINCH TRUCK WITH POLES WHEN USED FOR HOISTING; GRADE CHECKER AND STAKE HOPPER; HOIST, AIR TUGGERS, ELEVATORS; LOADERS: (A) ELEVATING-ATHEY, BARBER GREEN AND SIMILAR TYPES (B) FORKLIFTS OR LUMBER CARRIER (ON CONSTRUCTION JOB SITE) (C) FORKLIFTS WITH TOWER (D) OVERHEAD AND FRONT-END, UNDER 2 1/2 | $56.60 | $29.50 | AK20260001 |
| POWER EQUIPMENT OPERATOR GROUP 4(TUNNEL WORK) RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEANER; DRILL HELPER. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQU | $48.47 | $29.50 | AK20260001 |
| ROOFER | $52.07 | $19.62 | AK20260001 |
| SHEET METAL WORKER(SOUTH OF THE 63RD PARALLEL) | $52.08 | $30.81 | AK20260001 |
| SHEET METAL WORKER(NORTH OF THE 63RD PARALLEL) | $58.73 | $29.54 | AK20260001 |
| SPRINKLER FITTER | $60.67 | $31.39 | AK20260001 |
| TILE & TERRAZZO FINISHER | $40.91 | $12.48 | AK20260001 |
| TREE TRIMMER, LINE CONSTRUCTION | $42.23 | $30.10 | AK20260001 |
| TRUCK DRIVER(GROUP 1A) DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 60 YARDS UP TO AND INCLUDING 100 YARDS; JEEPS (DRIVER UNDER LOAD) | $53.05 | $26.43 | AK20260001 |
| TRUCK DRIVER(GROUP 1) SEMI WITH DOUBLE BOX MIXER; DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 40 YARDS UP TO AND INCLUDING 60 YARDS; DELTAS, COMMANDERS, ROLLOGANS AND SIMILAR EQUIPMENT WHEN PULLING SLEDS, TRAILERS OR SIMILAR EQUIPMENT; BOAT COXSWAIN; LOWBOYS INCLUDING ATTACHED TRAILERS AND JEEPS, UP TO AND INCLUDING 12 AXLES; READY-MIX OVER 12 YARDS UP TO AND INCLUDING 15 YARDS); WATER WAGON (250 BBLS AND ABOVE); TIREMAN, HEAVY DUTY/FUELER | $51.58 | $26.43 | AK20260001 |
| TRUCK DRIVER(GROUP 2) TURN-O-WAGON OR DW-10 NOT SELF-LOADING; ALL DELTAS, COMMANDERS, ROLLOGANS, AND SIMILAR EQUIPMENT; MECHANICS; DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 20 YARDS UP TO AND INCLUDING 40 YARDS; LOWBOYS INCLUDING ATTACHED TRAILERS AND JEEPS UP TO AND INCLUDING 8 AXLES; SUPER VAC TRUCK/CACASCO TRUCK/HEAT STRESS TRUCK; READY-MIX OVER 7 YARDS UP TO AND INCLUDING 12 YARDS; PARTSMAN; STRINGING TRUCK | $50.12 | $26.43 | AK20260001 |
| TRUCK DRIVER(GROUP 3) DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 10 YARDS UP TO AND INCLUDING 20 YARDS; BATCH TRUCKS 8 YARDS AND UP; OIL DISTRIBUTOR DRIVERS; OIL DISTRIBUTOR DRIVERS; TRUCKS/JEEPS (PUSH OR PULL); TRAFFIC CONTROL TECHNICIAN | $49.17 | $26.43 | AK20260001 |
| TRUCK DRIVER(GROUP 4) BUGGYMOBILE; SEMI OR TRUCK AND TRAILER; DUMPSTER; TIREMAN (LIGHT DUTY); DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCK WITH PUPS) UP TO AND INCLUDING 10 YARDS; TRACK TRUCK EQUIPMENT; GREASE TRUCK; FLAT BEDS, DUAL REAR AXLE; HYSTER OPERATORS (HANDLING BULK AGGREGATE); LUMBER CARRIER; WATER WAGON, SEMI; WATER TRUCK, DUAL AXLE; GIN POLE TRUCK, WINCH TRUCK, WRECKER, TRUCK MOUNTED ""A"" FRAME MANUFACTURED RATING OVER 5 TONS; BULL LIFTS AND FORK LIFTS WITH POWER BOOM AND SWING ATTACHMENTS, OVER | $48.50 | $26.43 | AK20260001 |
| TRUCK DRIVER(GROUP 5) GRAVEL SPREADER BOX OPERATOR ON TRUCK; FLAT BEDS, SINGLE REAR AXLE; BOOM TRUCK/KNUCKLE TRUCK UP TO AND INCLUDING 5 TONS; PICKUPS (PILOT CARS AND ALL LIGHT DUTY VEHICLES); WATER WAGON (BELOW 250 BBLS); GIN POLE TRUCK, WINCH TRUCK, WRECKER, TRUCK MOUNTED ""A"" FRAME, MANUFACTURED RATING 5 TONS AND UNDER; BULL LIFTS AND FORK LIFTS (FORK LIFTS WITH POWER BROOM AND SWING ATTACHMENTS UP TO AND INCLUDING 5 TONS); BUFFER TRUCK; TACK TRUCK; FARM TYPE RUBBER TIRED TRACTOR (WHEN MATERIAL HANDLING | $47.62 | $26.43 | AK20260001 |
* changed in the most recent modification. Survey-based (SU) identifiers are non-union survey rates. Amounts tagged per day or per shift are published that way in the source determination and are not hourly wages; they are excluded from the hourly figures above.